DOF - Official Gazette of the Federation sg11_Cx

DOF - Official Gazette of the Federation sg11_Cx

DOF - Official Gazette of the Federation sg11_Cx

In the margin a stamp with the National Coat of Arms, which reads: United Mexican States.- GOVERNMENT.- Ministry of the Interior.

COORDINATION AGREEMENT ENTERED INTO BY THE FEDERAL EXECUTIVE PARTY THROUGH THE SECRETARIAT OF THE GOVERNMENT, WHOM HEREIN WILL BE CALLED "THE SECRETARIAT" ; THROUGH THE UNDERSECRETARIAT OF HUMAN RIGHTS, POPULATION AND MIGRATION, REPRESENTED BY ITS HEAD, THE UNDERSECRETARY OF HUMAN RIGHTS, POPULATION AND MIGRATION ALEJANDRODEJESÚS ENCINAS RODRIGUEZ AND THE NATIONAL COMMISSION TO PREVENT AND ERADICATE VIOLENCE AGAINST WOMEN, REPRESENTED BY ITS HEAD, THE NATIONAL COMMISSION TO PREVENT AND ERADICATE VIOLENCE AGAINST WOMEN, MAFABIOLAALANÍSSÁMANO Y POR OTRA PARTY, THE GOVERNMENT OF THE FREE AND SOVEREIGN STATE OF TLAXCALA, REPRESENTED BY THE GOVERNOR OF THE STATE OF TLAXCALA, MARCOANTONIOMENARODRÍGUEZ, ASSISTED BY THE SECRETARY OF GOVERNMENT, JOSÉ AARON PÉREZCARRO, THE SECRETARY OF PLANNING AND FINANCE, MARÍA ALEJANDRA MARISELANANDEISLAS, AND THE ATTORNEY GENERAL OF JUSTICE OF THE STATE OF TLAXCALA, JOSÉ ANTONIOAQUIAHUATLSÁNCHEZ, TO WHOM HEREIN AND FOR THE PURPOSES OF THIS INSTRUMENT THEY SHALL BE REFERRED TO AS "THE STATE GOVERNMENT", AND WHEN THEY ACT JOINTLY AS "THE PARTIES", BASED ON THE FOLLOWING BACKGROUND, DECLARATIONS AND CLAUSES:

BACKGROUND

On August 7, 2012, the Committee on the Elimination of Discrimination against Women, supervisory body of the Convention on the Elimination of all forms of Discrimination against Women (CEDAW), after examining the combined seventh and eighth periodic reports (CEDAW/C/MEX/7-8 ) at its 1051st and 1052nd meetings, it recommended to the Mexican State, in the final observations document, that it should: i) Adopt measures to encourage the reporting of cases of violence against women and guarantee that there are adequate and harmonized procedures to investigate, prosecute and punish the perpetrators of acts of violence against women; ii) Guarantee the access of the women to justice, among other things by improving the capacity of Women's Justice Centers and making these centers accessible to women and girls who are victims of violence; iii) Adopt measures to improve support services for women and girls who are victims of violence, among other things, guaranteeing their access to care centers and established shelters, among others.

In accordance with the foregoing, the Government of Mexico and the federal entities recognize the need to act to eliminate contexts of social violence against women throughout the country, therefore they deem it necessary to have the legal and material means at their disposal to assist in the prevention and eventual eradication of the phenomenon, as well as in the promotion of women's human rights in the Free and Sovereign State of Tlaxcala .

The Federal Expenditure Budget Decree for Fiscal Year 2021, published in the Official Gazette of the Federation on November 30, 2020, establishes in its article 21 the actions that must be observed in the design, preparation, application, monitoring and evaluation of results of the Federal Public Administration programs, contemplated in Annex 13. Expenditures for Equality between Women and Men and in Annex 33. Extensions to Branch 4 Governance, which indicate the amounts authorized for each of the programs and activities to promote care and prevention of violence against women.

In terms of article 75 of the Federal Budget and Fiscal Responsibility Law (LFPRH), subsidies must be subject to the criteria of objectivity, equity, transparency, publicity, selectivity and temporality, for which the following must be, among other aspects: i) Identify the target population precisely; ii) Incorporate periodic monitoring, supervision and evaluation mechanisms; iii) Anticipate the temporality in its granting, and iv) report its exercise in the quarterly reports.

In accordance with articles 175 and 176 of the Regulations of the Federal Budget and Fiscal Responsibility Law (RLFPRH), the subsidies whose beneficiaries are the governments of the federal entities and, where appropriate, of the municipalities, will be considered accrued from the delivery of the resources to said government orders. However, they must refund to the Federal Treasury the resources that are not used for the authorized purposes and those that, at the end of the fiscal year in question, have not been accrued.

In accordance with official letter number 447/2020 of December 15, 2020, signed by José Antonio Aquiahuatl Sánchez, in his capacity as Attorney General of the State of Tlaxcala, the National Commission to Prevent and Eradicate Violence against Women (CONAVIM) was requested in due time and form , federal resources for access to subsidies for the Creation of the Justice Center for Women of the State of Tlaxcala.

Derived from compliance in time and form with the requirements indicated in the "Criteria that govern the mechanism to access the Subsidies Destined for the Creation, Strengthening, or Territorial Extension of the Justice Centers for Women for the Fiscal Year 2021" ("Criteria"), published on December 10, 2020 by CONAVIM, the Committee for the Evaluation of Projects (Committee) determined the project presented to be viable, for which reason it authorized the amount of $16,459,308.20 (Sixteen million four hundred fifty-nine thousand three hundred eight pesos 20/100 M.N.), exclusively for the Creation of the Justice Center for Women of the State of Tlaxcala. This situation was notified to the Government of the State of Tlaxcala through official letter number CNPEVM/114/2021 dated February 9, 2021.

The Justice Center for Women of the State of Tlaxcala is located in the building called Tlapelpa y Apanco, in Libramiento Poniente S/N, San Diego Metepec, Tlaxcala, State of Tlaxcala.

The agency responsible for the project undertakes to complete the second stage of the Justice Center for Women, which will be built in 2021. In the event that the entire project (public works) has been scheduled for development in various stages, it undertakes to obtain the necessary budgetary resources to ensure its completion and proper functioning, as well as comply with the National Development Plan 2019-2024 and programs derived from it.

Thus, "THE PARTIES" state that they formalize this instrument in accordance with the following:

STATEMENTS

I. "THE SECRETARIAT" declares that:

I.1.It is a Centralized Federal Public Administration Unit, according to the provisions of articles 90 of the Political Constitution of the United Mexican States, 26 and 27 of the Organic Law of the Federal Public Administration and 1 of the Internal Regulations of the Ministry of the Interior (RISEGOB).

I.2. In accordance with article 27, section VII of the Organic Law of the Federal Public Administration, within the scope of its competence, it is in charge of monitoring compliance with constitutional precepts by the country's authorities, especially as regards human rights and issuing the necessary measures for this purpose.

I.3. The Undersecretary of Human Rights, Population and Migration has powers to sign this legal instrument in accordance with articles 2, section A, section II, and 6 section IX of the RISEGOB.

I.4. CONAVIM is a decentralized administrative body of the Ministry of the Interior, in accordance with articles 2, section C, section V and 151 of the RISEGOB, and First of the Decree creating as a Decentralized Administrative Body of the Ministry of the Interior, the National Commission to Prevent and Eradicate Violence against Women, published in the Official Gazette of the Federation on June 1, 2009 ("Decree").

I.5. The National Commissioner has the powers to sign this agreement, has the powers to enter into this agreement based on article Four, section XIII of the Decree and 115, section V of the RISEGOB.

I.6. In order to comply with this Agreement, it has sufficient financial resources in budget item number 43801, relating to Subsidized States and Municipalities, and with proof of budget sufficiency number 314829.

I.7. Indicate as your address the one located at 99 Bucareli Street, Colonia Juárez, Cuauhtémoc Territorial Demarcation, Postal Code 06600, in Mexico City.

II. "THE GOVERNMENT OF THE STATE" declares that:

II.1. Based on articles 40, 42, fraction I and 43 of the Political Constitution of the United Mexican States, as well as 1st. of the Political Constitution of the Free and Sovereign State of Tlaxcala, is a free and sovereign state in everything concerning its internal regime and is an integral part of the Federation.

II.2.The Executive Branch of the State forms and constitutes an integral part of the Government of the Free and Sovereign State of Tlaxcala, whose exercise is deposited with the Governor of the State of Tlaxcala, Marco Antonio Mena Rodríguez, who has the capacity to be bound in terms of what is prescribed in articles 70, sections XXX and XXXVIII of the Political Constitution of the Free and Sovereign State of Tlaxcala, 3 and 4. of the Organic Law of the Public Administration of the State of Tlaxcala.

II.3. The Head of the Government Secretariat, José Aarón Pérez Carro, attends the signing of this agreement, who has the capacity to be bound in terms of articles 11, 28, section XXVII of the Organic Law of the Public Administration of the State of Tlaxcala and article 10, section XIX, Internal Regulation of the Secretary of Government of the State of Tlaxcala.

II.4. In accordance with the provisions of article 67 of the Political Constitution of the Free and Sovereign State of Tlaxcala, as well as 31 and 32, VIII, subparagraph i) of the Organic Law of the Public Administration of the State of Tlaxcala, likewise in numeral 11, section VI of the Internal Regulations of the Ministry of Planning Finance, María Alejandra Marisela Nande Islas, in her capacity as Secretary of Planning and Finance, is empowered to sign this Agreement.

II.5. The Tlaxcala State Attorney General's Office, to which the Women's Justice Center is attached, is an integral part of the State Public Administration, dependent on the State Executive Power, in accordance with the provisions of articles 11 and 49 of the Organic Law of Public Administration of the State of Tlaxcala and its Head, José Antonio Aquiahuatl Sánchez, assists in the signing of this Agreement, in accordance with Articles 3 and 20, sections XI and XX of the Organic Law of the Institution of the Public Ministry of the State of Tlaxcala.

II.6. It has the financial budgetary capacity to provide complementary resources to the project called "Creation of the Justice Center for Women of the State of Tlaxcala" (hereinafter "The Project") subject of this Agreement, which is described in the Technical Annex, under the terms of the administrative and budgetary provisions, as certified by official letter number 34/2021 dated February 12, 2020. 021 signed by the Attorney General of the State of Tlaxca and official number O /DP/90/2021 dated February 15, 2021, signed by the Budget Director of the Secretary of State Planning and Finance.

II.7. It owns the land located in the town of San Diego Metepec, Municipality of Tlaxcala, currently known as Libramiento Poniente, San Diego Metepec, Tlaxcala, State of Tlaxcala, which has an area of ​​4580.43 m2, and has the necessary permits and technical requirements for the Creation of the Justice Center for Women of the State of Tlaxcala described in the Technical Annex.

Accredits the ownership of the real estate object of the aforementioned project, with the "Property Declaration", granted in favor of the Government of the State of Tlaxcala, with respect to the properties called Tlatelpay Apanco, located in the town of San Diego Metepec, Municipality of Tlaxcala registered under Item 362, on Page 81 opposite and Vuelta, Section Four, Volume 12, Judicial District of Hidalgo, dated June 24, 1998, which is attached for quick reference.

II.8. For the purposes of this instrument, its fiscal address is located at Calle Plaza de la Constitución, number 3, Colonia Tlaxcala, Centro Tlaxcala, Postal Code 90000, State of Tlaxcala.

III. "THE PARTIES" declare that:

III.1. They reciprocally recognize the personality with which they hold and appear to sign this Coordination Agreement.

III.2. It is their will to combine efforts in their respective areas of government, to promote and execute actions that have as their central axis guaranteeing the right of access to justice for women.

III.3. They are convinced of the importance of addressing the phenomenon of violence against women and girls in the Free and Sovereign State of Tlaxcala, for which they recognize the usefulness of implementing preventive and sanction measures for those who break the law, particularly the General Law on Women's Access to a Life Free of Violence, and the Law that Guarantees Women's Access to a Life FreeFromViolenceintheStateofTlaxcala.

III.4. They consider as actions to prevent and reduce violence against women, those aimed at guaranteeing access to justice for women victims of violence, as well as those aimed at punishing those who perpetrate gender violence, particularly in crimes of sexual violence, human trafficking, family violence and femicide or homicides of women with characteristics of gender violence.

III.5. They undertake to comply with the precepts established in the "Criteria", which regulate this agreement.

III.6. "THE PARTIES" are obliged to adhere to the National Development Plan 2019-2024 and programs derived from it.

Exposed the above, "THE PARTIES" subject their commitment to the form and terms established in the following:

CLAUSES

FIRST. OBJECT. The purpose of this Agreement is the granting of subsidies for the Creation of the Justice Center for Women of the State of Tlaxcala, which allows the planning, development and promotion of strategies and actions in terms of prevention, care, punishment and eradication of violence against women and girls who are victims of violence.

"The Project" will be carried out in accordance with what is specified in the Technical Annex that is part of this legal instrument, which establishes its characteristics and objectives, as well as the physical-financial progress schedule of the work in its numeral 11 that will allow monitoring its progress, execution and the correct application of the resources granted.

In the event that the project described in numeral 1 of the Technical Annex presents variations in terms of technical or material needs during its execution, "THE STATE GOVERNMENT" undertakes to inform "THE SECRETARY" of any difference that alters the estimate of the reference work.

SECOND. ASSIGNMENT OF RESOURCES. To fulfill the purpose indicated in the previous Clause, "THE SECRETARIAT" will allocate the amount of $16,459,308.20 (Sixteen million four hundred and fifty-nine thousand three hundred and eight pesos 20/100 M.N.), exclusively for the Creation of the Justice Center for Women of the State of Tlaxcala.

For its part, "THE GOVERNMENT OF THE STATE" will contribute the land for the Creation of the Justice Center for Women described in declaration II.7.

The federal resources will be transferred to "THE GOVERNMENT OF THE STATE" in an administration, through its Secretary of Planning and Finance in the specific productive account previously opened, in which the federal resources referred to in this CLAUSE and their yields will be managed exclusively, and may not incorporate local resources or the contributions made, if applicable, by the beneficiaries of "The Project" in accordance with article 69 of the General Law of Government Accounting. Said account is identified with the following data:

Name:

TLAXCALA STATE GOVERNMENT SPF PGJE CREATION OF THE JUSTICE CENTER FOR WOMEN IN TLAXCALA 2021

Name of financial institution:

HSBC MEXICO S.A.

Project name:

Creation of the Justice Center for Women in Tlaxcala 2021

Standardized bank code (18-digit CLABE):

021830040664167103

Bank account number to eleven positions:

04066416710

Account type:

Productive

Branch number:

332 Tlaxcala

Place number:

29001 TLAXCALA

Open date:

February 15, 2021

Name of the persons authorized to manage the account:

DARIO COYOTZI NAVA

MAGALY FEATHER FLOWERS

It is an essential requirement for the transfer of resources that "THE STATE GOVERNMENT" has sent to "THE SECRETARIAT" the electronic invoice (Internet Digital Tax Receipt "CFDI") provided for in numeral 9.5.8 of the "Criteria", which regulate this agreement.

For "THE SECRETARIAT", the filing of federal resources generates the accounting moments of the expense accrued, exercised and paid, in terms of article 4 of the General Government Accounting Law. For its part, "THE GOVERNMENT OF THE STATE" must register in its accounting, in accordance with the applicable federal legal provisions, the federal resources received and submit reports of their application in its Public Account, regardless of those that must be submitted through "THE SECRETARIAT".

The resources that the Committee assigns to the federal entities are subject to their availability in terms of the Federation's Expenditure Budget, so "THE SECRETARIAT" will not be responsible for delays in the transfer or cancellation of the resources, derived from budgetary administrative provisions outside of it. eventuality related to the administration of the resources.

"THE SECRETARIAT" will be outside the awarding, contracting, payment order and/or invoicing procedures carried out by the federal entities for the execution of the approved projects, so any dispute that may arise from these contracts will be subject to the applicable legal provisions.

THIRD. COMMITMENTS OF "THE PARTIES". In addition to what is provided for in the "Criteria", for the realization of the purpose of this Agreement, "THE PARTIES" undertake the following:

a. Adhere to the provisions of the LFPRH, the RLFPRH, and other applicable legislation on subsidies;

b. Provide all the facilities for accountability regarding the use of resources provided by the Government of Mexico, as well as for planning and technical assistance provided by the State Government, and

c.Jointly review the monthly reports that are presented regarding the progress of "The Project" of the Justice Center for Women of the State of Tlaxcala.

FOURTH. COMMITMENTS OF "THE SECRETARIAT". In addition to what is provided for in the "Criteria", "THE SECRETARIAT", through CONAVIM, undertakes to:

a. Grant federal public resources for the concept of subsidies that are the object of this Coordination Agreement, exclusively for the execution of the project referred to in the FIRST and SECOND CLAUSES;

b. Make the corresponding records in the Federal Public Account and in the other reports on the exercise of public spending, in order to report the application of the subsidies granted within the framework of this instrument;

c. Carry out the follow-up of the subsidy application, as well as the monitoring of the objective established in number 1 and of the goal(s) committed in number 2 of the Technical Annex, through the monthly reports in which the physical progress and project finance;

d. Report on the results obtained with the application of the federal budgetary resources that will be provided within the framework of this instrument, and

e. Carry out random follow-up visits to the Justice Center for Women of the State of Tlaxcala once they are in operation, in order to verify its proper functioning and issue observations and comments that must be addressed by "THE STATE GOVERNMENT".

FIFTH. COMMITMENTS OF "THE STATE GOVERNMENT". In addition to what is provided in the "Criteria", "THE STATE GOVERNMENT" undertakes to:

a. Allocate through the Ministry of Planning and Finance, the resources assigned via subsidy exclusively for the purposes set forth in the FIRST and SECOND CLAUSE and in the Technical Annex of this Agreement;

b. Provide the property referred to in the declaration II.7. of this Agreement;

c. Disburse the federal resource in accordance with the provisions of the Technical Annex, no later than December 31, 2021;

d. Initiate actions to comply with the Project, within 15 calendar days following the date of the deposit that indicates the receipt of the Certified Account to Settle (CLC) in the name of the Free and Sovereign State of Tlaxcala, issued by the General Directorate of Programming and Budget of the "SECRETARIAT", derived from the transfer of federal resources to which the SECOND CLAUSE of this Agreement refers;

e. Carry out the actions and acquisitions necessary to achieve the purposes of the project, in strict adherence to the Law on Public Works and Related Services and the Law on Acquisitions, Leases and Services of the Public Sector, their respective regulations, and other applicable federal regulations on the matter;

f. Request, with due opportunity, the corresponding federal, state, or municipal authorities, the technical assistance, authorizations, licenses, or permits that are necessary for the performance of the functions derived from the project provided for in this instrument;

g. Guarantee that the project that will be financed with the federal resources referred to in this Agreement, has the current legal and official documentation that is necessary for its execution;

h. Collect, safeguard and preserve, through the Tlaxcala State Attorney General's Office, the supporting and probative documentation of the expenditures covered with the federal budgetary resources that have been delivered as subsidies; make the corresponding records in the accounting and in the local Public Account, as the resources are accrued and exercised, and give compliance with applicable federal provisions regarding their administration;

i. Integrate and safeguard through the Tlaxcala State Attorney General's Office, the files related to the execution and verification of "The Project" financed with the resources granted under this instrument;

j. Equip the property, train the staff, and operate the Justice Center for Women of the State of Tlaxcala through the Attorney General's Office of the State of Tlaxcala;

k. Deliver monthly through the Tlaxcala State Attorney General's Office, to "THE SECRETARIAT" through CONAVIM and through the person in charge of the Coordination of Inter-institutional Strategic Linkage of CONAVI in charge of the Justice Centers for Women project, a report on the results of the physical and financial progress of "The Project", work or action authorized and related to the purpose of this Agreement, under the terms set forth in numeral 15.9 of the Criteria, with the documentary evidence that accredits said progress, which must reflect the progress in compliance with the object of this Agreement, the objective established in numeral 1 and the goal established in numeral 2 of the Technical Annex and, if applicable. , the results of the actions carried out in accordance with this instrument, within ten calendar days following the end of each month, counted from the payment date indicated on the receipt of the Certified Account to be Settled (CLC) in the name of the Free and Sovereign State of Tlaxcala, issued by the General Directorate of Programming and Budget of the "SECRETARIAT", derived from the transfer of federal resources referred to in the SECOND CLAUSE of this Agreement.

l. Deliver proof of subsidy execution for accountability, within ten business days following the end of 2021;

m. Submit "THE SECRETARIAT" within seven business days following the end of fiscal year 2021, a Closing Act signed by the Head of the Attorney General's Office of the State of Tlaxcala, agency responsible for the project in which general data, objective and description of "The Project" are included; the background of its execution; the commitments assumed by "THE PARTIES", the works carried out with the subsidy assigned by CONAVI and the achievements; photographic memory of before, during and after the construction of the Women's Justice Center; list of invoices that prove the disbursement of the subsidy granted, as well as the vouchers of the refunds to the Treasury of the Federation; bank account statements from the date of transfer until the closing of "The Project", and the document issued by the banking institution where the subsidy was established, stating the cancellation of said account.

n.Once the Women's Justice Center begins to operate, it must keep a timely record of all the users and services provided therein, through the report called InformedeMujeresAtendida, which will be sent to "THE SECRETARIAT", through CONAVIM, in the format provided for it , monthly, in print and electronically;

o. Expressly indicate the participation and support of the Government of Mexico, through "THE SECRETARIAT", through CONAVIM, in the dissemination, dissemination and promotion actions of the Women's Justice Center, and

p. Comply with and observe at all times the provisions and guidelines described in the LFPRH and its Regulations, the Federal Expenditure Budget Decree for Fiscal Year 2021, the Technical Annex that is signed and other federal provisions applicable to the matter.

SIXTH. LINKS. The public servants who will act as liaisons between "THE PARTIES" will be, for "THE STATE GOVERNMENT" Rocío Bautista Hernández, Head of the Center for Justice for Women of the State of Tlaxcala, designated by official letter number 033/2021, dated February 15, 2021, signed by José Antonio Aquiahuatl Sánchez, Attorney General of the State of Tlaxcala , depend on the provision of the project and for "the secretariat" the person in whom it remembers As entrusted activities.

Likewise, "THE STATE GOVERNMENT" must notify CONAVIM of any change in the liaison person and personnel responsible for monitoring the subsidy and the approved "Project", within 15 business days from the corresponding change, providing the contact information of the person who will assume said functions.

SEVENTH. RESULTS REPORT."THE GOVERNMENT OF THE STATE", through the Tlaxcala State Attorney General's Office, must physically and electronically submit a results report to "THE SECRETARIAT", through the Head of the Inter-institutional Strategic Liaison Coordination Responsible for the CONAVIM Justice Centers, on the physical and financial progress of "The Project ", work or action authorized and related to the object of this Agreement, in the terms provided in numeral 15.9 of the Criteria, with documentary evidence proving said progress, which must reflect the progress in fulfilling the object of this Agreement, the objective established in numeral 1 and the goal established in numeral 2 of the Technical Annex and, if applicable, the results of the actions carried out in accordance with this instrument, within ten calendar days following the end of each month, counted from the payment date indicated on the Certified Account to Settle (CLC) receipt. in the name of the Free and Sovereign State of Tlaxcala, issued by the General Directorate of Programming and Budget of the Secretariat, derived from the transfer of federal resources referred to in the SECOND CLAUSE of this Agreement.

EIGHTH. APPLICATION OF THE RESOURCES. The federal resources that will be delivered to "THE GOVERNMENT OF THE STATE" under the terms of this instrument and its Technical Annex, do not lose their federal character, so their administration, commitment, accrual, justification, verification, payment, exercise and accounting must be carried out in accordance with the provisions contained in current federal legislation .

The financial returns obtained in the specific productive account to which the subsidy will be transferred in 2021 must be repaid to the Federation Treasury in the terms established by the LFPRH.

NINTH. DESTINATION OF THE RESOURCES. "THE PARTIES" agree that the federal resources that will be delivered to "THE GOVERNMENT OF THE STATE" will be used exclusively for the creation of the Justice Center for Women of the State of Tlaxcala.

TENTH. JUSTIFICATION AND EVIDENCE DOCUMENTATION. The safeguarding and conservation of the original supporting and probative documentation corresponding to the application of the resources referred to in this Agreement, will be the responsibility of "THE GOVERNMENT OF THE STATE" through the Tlaxcala State Attorney General's Office.

In the case of "THE SECRETARIAT", the supporting documentation is the one indicated in numerals 4, 5, 9.4, 9.5.8 and 9.6, of the "Criteria" and will be in charge of the Head of the Inter-institutional Strategic Liaison Coordination of CONAVIM.

ELEVENTH. REINTEGRODE THE RESOURCES. In the event that "THE STATE GOVERNMENT" does not disburse the assigned federal resources, the remaining resources or available balances, including financial returns, that it presents as of December 31, 2021 must be repaid to the Federal Treasury within 15 calendar days following the close of Fiscal Year 2021, in accordance with the provisions of articles 54 third paragraph of the LFPRH and 85 of the RLFPRH.

The refund to the Treasury of the Federation of the resources must be carried out in accordance with the applicable federal legal provisions, being the responsibility of "THE STATE GOVERNMENT" to give written notice and request "THE SECRETARIAT" the capture line to make the corresponding refund. Once "THE SECRETARIAT" grants the capture line to the entity, it must send it to CONAVIM copy of the supporting documentation of the refund made.

Likewise, "THE STATE GOVERNMENT" will be obliged to reimburse the Federation Treasury for those resources that are not applied to the purposes for which they were authorized. The same obligation will arise when deviations or breaches have been detected in the exercise of the resources in accordance with this legal instrument and the Technical Annex, including the amounts equivalent to the financial charges that are generated from the date on which they have been exercised to cover unauthorized expenses, as well as the yields generated in the fiscal year immediately following the one in which the resource was granted.

TWELFTH. EMPLOYMENT RELATIONSHIP. The personnel of each of "THE PARTIES" involved in carrying out the actions subject to this Coordination Agreement, will maintain their affiliation, relationship and labor dependency in each of their respective areas, so in no case will they be considered solidary employers, substitutes, or of any other nature.

THIRTEENTH. OF THE SUSPENSION OR CANCELLATION OF RESOURCES. "THE SECRETARIAT" may request the refund of the resources assigned to "THE STATE GOVERNMENT" as a result of this instrument, when it is determined that they were used for purposes other than those provided for in this Agreement or for non-compliance with the obligations contracted therein, after hearing "THE STATE GOVERNMENT", in accordance with the provisions of article 83 of the RLFPRH.

FOURTEENTH. INSPECTION. Subsidies assigned for the creation, strengthening, or territorial extension of Justice Centers for Women cannot be regularized and do not lose their federal character when transferred to the federal entities, so their allocation, exercise, verification, registration, surveillance, and control will be subject to the provisions of the Federal Expenditure Budget for Fiscal Year 2021; the Federal Budget and Fiscal Responsibility Law and its Regulations; the Public Sector Acquisitions, Leases, and Services Law and its Regulations; the Public Works and Related Services Law and its Regulations; the Decree establishing measures for the efficient, transparent, and effective use of public resources, and budgetary discipline actions in the exercise of public spending, as well as for the modernization of the Federal Public Administration; to the Criteria and other applicable provisions on the matter.

The Ministries of Finance and Public Credit and the Public Service, as well as the Superior Audit of the Federation, the Internal Control Bodies of the federative entities and the Federal and State Technical Oversight Bodies, may carry out inspection and audit activities, corresponding to the exercise of the subsidy within the scope of their respective powers, subject to the applicable legislation in the matter.

The administrative, civil and criminal responsibilities derived from affectations to the Federal Public Treasury incurred by federal, state or local public servants, as well as the individuals who intervene in the administration, exercise or application of the public resources referred to in this instrument, will be sanctioned in the terms of the applicable legislation.

FIFTEENTH. FORTUITOUS CASE OR FORCE MAJEURE. It is expressly agreed that "THE PARTIES" shall not be liable for damages that may be caused as a result of an act of God or force majeure, so that once the causes that led to its interruption disappear, the agreed tasks will resume.

SIXTEENTH. MODIFICATIONS OR ADDITIONS. This Coordination Agreement may be added or modified at any time during its validity by mutual agreement between "THE PARTIES", in accordance with numeral 12.5 through the corresponding amending agreements that will form an integral part of this instrument, and will take effect from the date of signing them, which must be published in the DOF in within 15 business days of signing up.

SEVENTEENTH. EARLY TERMINATION. This Coordination Agreement may be terminated when any of the following events occur:

a. Because the purpose for which it was executed has been fulfilled, provided that there are no obligations pending to be fulfilled by "THE PARTIES" and, where appropriate, the reimbursement of the proceeding resources and financial yields has been made, and

b.In the cases provided for in numeral 10.1 and 17 of the "Criteria".

For such purposes, a minute will be drawn up in which the specific circumstances that: i) are presented and establish the terms in which its execution will be considered concluded; ii) identify those responsible for safeguarding and preserving the supporting and probative documentation that has been generated up to that moment, and iii) indicate what is appropriate regarding the reimbursement of resources and financial yields that, if applicable, proceed.

EIGHTEENTH. EFFECTIVENESS. This Agreement shall enter into force from the day it is signed and until December 31, 2021. The foregoing does not exempt "THE GOVERNMENT OF THE STATE" from presenting verification of the expenses incurred and reimbursing the remaining resources and/or not applied for the purposes for which they were authorized, together with the corresponding financial returns or, where appropriate, the financial charges that may have been generated.

NINETEENTH. SOLUTION OF DISPUTES. "THE PARTIES" agree that this instrument is the product of good faith, for which reason any conflicts that may arise as regards its interpretation, formalization, execution and compliance, will be resolved by mutual agreement by "THE PARTIES". If there is any discrepancy, it must be subject to the provisions of Article 105 of the Political Constitution of the United Mexican States.

TWENTIETH. BREACH. In the event of any breach of this agreement and/or the agreements derived from it, "THE SECRETARIAT" through CONAVIM, will inform the competent supervisory bodies of the actions or omissions that affect the correct exercise of the subsidy granted, in accordance with numerals 9.9, 16.8 and 17.7 of the "Criteria".

TWENTY-FIRST. CONFIDENTIALITY AND TRANSPARENCY."THE PARTIES" Undertake to comply with the provisions established by the General Law on Transparency and Access to Public Information, the General Law on Protection of Personal Data Held by Obligated Subjects, the Federal Law on Protection of Personal Data Held by Individuals, the Federal Law on Transparency and Access to Public Information, its Regulations and others applicable provisions.

Likewise, in order to fully comply with the purpose of this Agreement, and "THE PARTIES" come to have access to personal data for which the other Party is responsible, they hereby agree to: (i) process said personal data solely for the purposes of implementing the Agreement; (ii) refrain from processing personal data for purposes other than those instructed by the other Party; (iii) implement security measures in accordance with the General Law on Transparency and Access to Public Information, the General Law on the Protection of Personal Data Held by Obligated Subjects, the Federal Law on Protection of Personal Data Held by Private Parties, Federal Law of Transparency and Access to Public Information, its Regulations and other applicable provisions; (iv) maintain confidentiality with respect to the personal data processed; (v) delete the personal data subject to processing once the Agreement is terminated and (vi) refrain from transferring personal data.

In the event that any of "THE PARTIES" come to have knowledge of personal data other than those indicated in the previous paragraph, which are stored in registries, databases or any other means belonging to the other Party, in this act both agree to respect the provisions established on them by the Federal Law on Protection of Personal Data in Possession of Obligated Subjects, the General Law on Transparency and Access to Public Information and the Federal Law on Transparency and Access to Public Information, as the case may be, as well as the privacy notices of each one of them, with the understanding that in the absence of consent of the holders of such personal data, they must refrain from carrying out any type of treatment on them .

TWENTY-SECOND. PUBLICATION. Based on the provisions of article 36 of the Planning Law, this instrument will be published in the Official Gazette of the Federation, and the "STATE GOVERNMENT" will publish it in accordance with its applicable regulations.

TWENTY-THIRD. DISSEMINATION "THE PARTIES" agree that the following legend must be included in the publicity and dissemination of the program: "This program is public, outside of any political party. It is prohibited to use it for purposes other than those established in the program", in accordance with the provisions of article 27, section II, subparagraph a of the 2021 Federation Expenditure Budget. Similarly, all expenses in communication and dissemination It must be stated expressly and identically that the It is carried out with the federal resources approved in the 2021 Federation Expenditure Budget.

TWENTY-FOURTH. NOTIFICATIONS "THE PARTIES" agree that any communication or notification that must be made by reason of this instrument will be via electronic mail, or by means of a letter signed by the competent authority sent by courier service at the addresses indicated in the DECLARATIONS chapter, of telephone communications CONAVIM must provide proof of the communication. Any change of address that "THE PARTIES" make in the future, they must notify the other party in writing and indubitably, at least ten business days in advance.

Read by the parties and aware of the content and legal scope of its clauses, they sign it in four copies in Mexico City, on the 12th day of May 2021.- By the Secretariat: the Undersecretary of Human Rights, Population and Migration, AlejandrodeJesúsEncinas Rodríguez.-Heading.-The National Commissioner to Prevent and Eradicate Violence against Women, MaFabiola Alanís Sámano.-Signature.-For the State Government: the Governor of the State of Tlaxcala, Marco Antonio Mena Rodríguez.- Signature.-The Secretary of Government, José Aarón Pérez Carro.-Signature.-The Secretary of Planning and Finance, María Alejandra Marisela Nande Islas.-Signature.- The Attorney General of Justice of the State of Tlaxcala, José Antonio Aquiahuatl Sánchez.- Rubric.

TECHNICAL ANNEX

DELCONVENIODECOORDINACIÓNPARALA CREACIÓNDELCENTRODEJUSTICIAPARALASMUJERESDELESTADODE TLAXCALA

1.Name, objective and description of "The Project":

-Name or name: Creation of the Justice Center for Women of the State of Tlaxcala.

-Objective:

Assist women victims of gender violence, their daughters and sons, through a Women's Justice Center, which is an adequate space that concentrates and provides specialized services, psychological, medical and legal care, which allows the convergence of government entities, the judicial power and civil society that provide services in a manner coordinated and in the same place; granting the tools for decision-making in an informed manner, and aimed at building a new life project in environments free of violence.

-Description:

In order to get the Tlaxcala State Justice Center for Women (CJM) up and running, it will have access to drinking water and sanitation, as well as adequate sanitary facilities that include water intakes and deposits for emergencies. , as well as a comfortable and safe waiting and welcome room; With medical assistance facilities, as well as a duly delimited, private and equipped area for social work, psychology and empowerment, it will also have a recreational area. On the top floor will be the legal area, with direct links between the Legal Area, the Superior Court of Justice of the State of Tlaxcala (Centro de Justicia Alternativa), with the Public Prosecutor's Office attached to the State Attorney General's Office and Human Rights, opening hours are 24 hours all year round. In accordance with the architectural project presented in the application for the subsidy.

2. Goal that is estimated to be achieved in 2021:

Description of the goal: Second stage for the operation of the CJM to provide services of comfort, security and recreation of spaces that generate climates of trust, inspiring tranquility and harmony both to the users of the services and to the women and their sons and daughters who experience violence, to the director, to the operators.

3. Justification for the Creation of the Justice Center for Women:

Arguments:

Mexico is currently a signatory to various international treaties and conventions that aim to eradicate gender discrimination and prevent violence against women. In addition to this, with academic research and the struggle of women's movements, contributions have emerged that show the importance of incorporating the gender perspective in the analyzes that are carried out on human development, at the national, state and municipal levels. In this sense, equal opportunities in a society cannot be achieved if there are social groups that remain excluded from the benefits of development. Exclusion and conditions of vulnerability are two concepts intrinsically linked to the notion of human rights as effective mechanisms for the protection of people and to reverse unfavorable conditions that prevent equal access to socially available opportunities. Thus, the Government of the State of Tlaxcala assumes the constitutional commitment and with the objective of complying with the State Development Plan 2017-2021, which establishes primarily the strategies of: Guaranteeing the protection of women victims of violence and their families, through trained first-contact personnel, shelters and safe and adequate shelters, and promote the creation of the Justice Center for Women Victims of Violence. Under this framework of action, we state that the fundamental purpose of this situational analysis of women in the state of Tlaxcala is to have objective data that allows decision-making based on the analysis of quantitative and qualitative information from the entity, which demonstrates the situation of women in different areas of development, regional and country contexts, the gaps in inequality between women and men, and the importance of designing public policies, programs, projects and indicators with a gender perspective, to plan, budget and evaluate taking into account the differentiated needs of the genders.

In Tlaxcala, we are clear that the Women's Justice Center must be a public institution to facilitate access to justice, which provides comprehensive psychological, medical, and legal care to women victims of violence in all its forms by concentrating various government, judicial, and civil society bodies with coordinated services and in one place; providing the tools for informed decision-making, and aimed at building new life projects in environments free of violence.

In this context of information generation by the Tlaxcala State Attorney General's Office, through the Crime Investigation Department, reports the following incidence statistics in 2020:

The statistics presented allow the analysis to be extended to possibly unreported cases of violence against women captured by said calls. During the period January-October 2020, the incidence in Tlaxcala is shown in the following indicators regarding the total number of emergency calls to 9-1-1, for 100,000 inhabitants:

a) Family violence: 156.8

b) Intimate partner violence: 83.8

c) Rape: 0.8

d) Harassment or sexual harassment: 1.0

e) Sexual abuse: 0.4

f) Violence against women: 156.5

On the other hand, based on the latest studies carried out by the National Institute of Statistics, Geography and Information Technology (INEGI), violence against women has been increasing. Based on the National Survey on the Dynamics of Household Relationships (ENDIREH), in the state of Tlaxcala, 42% of women over the age of 15 have been victims of violence throughout their lives, this percentage presented an increase of 2.2% compared to the results of the survey. same survey from 2006. It is noteworthy that, at the community and school level, these indicators had an upward trend, and that in comparison with the national and regional level.

To establish references for intimate partner violence in the state of Tlaxcala, according to ENDIREH, at the national level the prevalence of intimate partner violence is 40.1% of women aged 15 years and over who have been emotionally violated, denoting isolation, threats, emotional degradation, indifference and intimidation and stalking.

To describe the benefits that the CJM will provide, it is relevant to mention that this important project will concentrate specialized services, coordinating actions of Government Institutions, those of the State and Civil Judiciary, as well as Academic Institutions to provide comprehensive care to women and their daughters and sons who are victims of violence, guaranteeing them the enjoyment and exercise of their human rights , as well as their access to justice promptly and expeditiously, formalizing each of the necessary strategic alliances.

All of this commits us to comply so that all institutions converge in the Justice Center to offer a service with quality and warmth, always privileging the unrestricted right to human rights and equality, guaranteeing the physical safety of its users and those of their minor children.

Because of the above, it is important to mention that the CJM will implement established strategies or alliances with public institutions, organizations or actors from civil and private society in support of the performance of its functions, together with a vision of turning the CJM into a model of national and inter-institutional scope that, in light of the gender perspective, achieves that women have a life free from violence.

4. Contact details:

Head of the Unit responsible for "The Project":

Name: José Antonio Aquiahuatl Sánchez

- Position: Attorney General of the State of Tlaxcala

-Description Area:Tlaxcala State Attorney General's Office

-Phone number: 246 46 50 500 ext. 13331

-Email:

aquiahuatl.pgjtlax@outlook.com

-Address to receive notifications:

LibramientoPonientes without number, Colonia Unitlax, Tlaxcala, Tlaxcala.

Person details State link:

- Name: Rocío Bautista Hernández

- Position: Head of the Justice Center for Women in the State of Tlaxcala

-Description area: Justice Center for Women of the State of Tlaxcala

-Telephone Number: 246 46 50 525

-Email to receive notifications:

cjm.coordinacion@pgjtlaxcala.gob.mx

lawyerociobh@outlook.com

-jubi031096@hotmail.com

-Oficio de designación: Official letter number 033/2021 of February 15, 2021

Functions:

o Those established in the fifth clause of the Coordination Agreement that regulates this Technical Annex (Agreement).

o It will be in charge of promptly responding to requests issued by the Ministry of the Interior through CONAVIM.

oIt will follow up on the documentation and reports requested to comply with the Agreement.

5. Unit responsible for "The Project":

Name: Tlaxcala State Attorney General's Office

-Description of responsibilities:

1.- Comply with and observe the provisions of the Agreement and the Operation Criteria to access the subsidies for the creation or strengthening of Justice Centers for Women for Fiscal Year 2021.

2.-Carry out all the steps before the corresponding state authorities for the resource to be transferred.

3.- Comply with and observe at all times the provisions and guidelines described in the Federal Budget and Fiscal Responsibility Law (LFPRH) and its Regulations (RLFPRH), the Federal Expenditure Budget Decree for Fiscal Year 2021 and other applicable federal provisions on the matter.

6. Description and location of the property:

-Description:

Public Deed number: "Declaratory of Property", registered under Item 362, on Page 81 Front and Back, Fourth Section, Volume 12, Hidalgo Judicial District.

Catastral Code of the property: U--33-10

Area:4,580.43 m2

Measurements and boundaries:

North: 62.47 meters, adjoins the area of ​​property 2;

South: 85.33 meters, bordering Lázaro Cárdenas Street;

East: 47.29 meters, adjoins private property; and,

West: 82.35 meters, bordering the access area.

Latitude: 19.291979º

Longitude: -98.244969º

Certificate of Lien Release: CE49PD-83NR24-HC74BC

Catastral Value: $285,818.83

-Location:

Street: West Bypass

OutsideNumber: No number

Location: San Diego Metepec

Municipality: Tlaxcala

State: Tlaxcala

Name: Tlatelpa and Apanco

Sketch:

7. Total amount of the project in all its stages, the number of projected stages until its conclusion and the amount of the federal contribution authorized by the Committee in fiscal year 2021.

- Total Amount of "The Project" in all its construction stages:

$55,521,854.68(Fifty-five million five hundred and twenty-one thousand eight hundred and fifty-four pesos68/100 M.N.)

- Number of projected stages until its conclusion: Three stages

- Investment amount in Stage 1 (2020): $22,989,901.00 (Twenty-two million, nine hundred eighty-nine thousand, nine hundred one 00/100 M.N. pesos)

- Investment amount in Stage 2 (2021): $18,388,720.34 (Eighteen million, three hundred and eighty eight thousand seven hundred and twenty 34/100 M.N.)

- Investment amount in Stage 3 (2022) $14,143,233.34 (Fourteen million one hundred forty-three thousand two hundred thirty-three pesos 34/100 M.N.)

-Amount of the federal contribution authorized by the Project Evaluation Committee in fiscal year 2021:

-Federal contribution granted by CONAVIM:

Amount: $16,459,308.20 (Sixteen million four hundred fifty-nine thousand three hundred eight pesos 20/100 M.N.).

In your case:

8.State Contribution to "The Project":

-In case of providing financial resources:

Amount: $1,929,412.14 (One million nine hundred twenty-nine thousand four hundred twelve pesos 14/100 M.N.)

Percentage: 10.49%, which represents the entire investment in 2021.

9. Estimated date of the start of the work, in the Stage (or Stages) to be built in 2021:

- Date: May 14, 2021

10. Estimated date for the completion of the stage that is being built in 2021 and estimated date of completion of the work in its entirety (if applicable, consider several stages in different fiscal years), and

Estimated date for the completion of the stage (or Stages) to be built in 2021:

- Date: September 03, 2021

Estimated date of completion of the work in its entirety, in case it exceeds the fiscal year 2021:

Date: December 31, 2022.

11. Physical-financial progress schedule of the project, exclusively from the contribution granted by CONAVIM, indicating the duration of the work and the concepts of work that have been programmed with the subsidy granted.

a) Catalog of Concepts of the Stage (or Stages) to be built in 2021:

CATALOG OF CONCEPTS, UNIT PRICES

Code

Concept

Unit

Amount

P. Unitary

Amount

A

FEDERAL SUBSIDY

1

PRELIMINARY WORK

PRELIMINARS

1

NATURAL TERRAIN LINE AND LEVELING WITH TOPOGRAPHICAL EQUIPMENT, FOR THE CONTROL OF EXCAVATIONS UNTIL FOUNDATION DEPLOYMENT. INCLUDES: CONCRETE BASES f'c=100kg/cm2, WITH A 3/8" DIAMETER AND 25 cm ROD, QUALIFIED TECHNICAL PERSONNEL, LOCATION AND PLACEMENT OF AXES, MATERIALS FOR SIGNALING, FREIGHT, WASTE, CARRIAGE, COMPLETE EQUIPMENT, TOOLS, DAILY GROSS CLEANING OF THE AREAS WORK AND RETIREMENT AREA OF THE VOLUME GENERATED OUTSIDE THE WORK AT FREE SHOT.

M2

3772.04

$9.72

$36,664.26

2

CLEANING AND CLEANING OF 20cm THICK GROUND, BY MECHANICAL MEANS, INCLUDES: UNROOTING, WEEDING, LABOR, TOOLS, EQUIPMENT, LOADING AND CARRYING INSIDE AND OUTSIDE THE SITE, TRANSPORTATION, ORDERING EXECUTION OF THE SPREADING, WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK TO FREE DRAFT.

M2

2472.64

$103.29

$255,398.99

TOTAL PRELIMINARIES

$292,063.25

TEARDOWNS

3

REMOTE DISASSEMBLY-1HP PUMP, WITH RECOVERY, INCLUDES: HYDRAULIC DISCONNECTION, CARRIAGE TO THE WAREHOUSE, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$381.61

$381.61

4

DISMASSEMBLY OF THE ECONOMIC WASHBASIN WITH RECOVERY, INCLUDES: KEY REMOVAL, CESPOL, CARRIAGE TO THE WAREHOUSE, LABOR INVOLVED, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK AT FREE SHOT

PC

2.00

$159.00

$318.00

5

DISASSEMBLY OF 0.90X0.90 M ALUMINUM PROFILES WINDOW, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, SCAFFOLDING, EQUIPMENT AND TOOLS.

PC

20.00

$467.05

$9,341.00

6

DETINACODE POLYETHYLENE DISASSEMBLY WITH CAPACITY OF 1100 LT. WITH RECOVERY, INCLUDES: HYDRAULIC DISCONNECTION, DESCENT FROM A HEIGHT OF 7 M, CARRIAGE TO THE WAREHOUSE, LABOR INTERVENING, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE DRAFT

PC

1.00

$715.60

$715.60

7

dew.c.c.Dean low with recovery, includes: hauling up to the warehouse, manodebraque intervene, tool, equipment, thick cleaning daily of the place of the place of the way of the generation of the work. FREE SHOT

PC

2.00

$238.52

$477.04

8

REMOVING THE FLOOR,WITH RECOVERY,INCLUDING:FLOOR DEMOLITION,HYDRAULIC DISCONNECTION,HAULING TO THE WAREHOUSE,LABOR INTERVENING,TOOL,EQUIPMENT,DAILY COARSE CLEANING OF THE JOB SITE AND REMOVAL FROM VOLUME GENERATED OUTSIDE THE WORK AT FREE SHOT

PC

2.00

$636.01

$1,272.02

9

DISASSEMBLY OF 13 AND 19 MM DIAMETER COPPER PIPE, WITH RECOVERY UP TO A HEIGHT OF 7 M., INCLUDES: HYDRAULIC DISCONNECTION, REMOVAL OF SUPPORTS, CARRIAGE TO THE WAREHOUSE, SCAFFOLDING , LABOR INVOLVED, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE BY FREE DRAFT

M

21.10

$17.15

$361.87

10

DISASSEMBLY OF 25 AND 32 MM DIAMETER COPPER PIPE, WITH RECOVERY UP TO A HEIGHT OF 7 M., INCLUDES: HYDRAULIC DISCONNECTION, REMOVAL OF SUPPORTS, CARRIAGE TO THE WAREHOUSE, SCAFFOLDING , LABOR INVOLVED, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE BY FREE DRAFT

M

9.40

$19.04

$178.98

11

REMOVAL OF WOODEN CLOSET AND WOODEN SKIRT, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, SCAFFOLDING, EQUIPMENT AND TOOLS.

PC

2.00

$537.14

$1,074.28

12

REMOVAL OF WOODEN RAILING IN THE AREA OF STAIRS 0.90 CM HIGH, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, EQUIPMENT AND TOOLS.

ML

4.69

$67.14

$314.89

13

DISASSEMBLY OF A LIGHT METAL STRUCTURE WITHOUT THE USE OF A CRANE, UP TO A HEIGHT OF 4.00 M., INCLUDES: DISMANTLING OF THE PAINT SHEET, UNSCREWING, CUTTING WITH OXY-BUTANE EQUIPMENT, DESCENT , HAULING TO THE SITE WAREHOUSE, LABOR INVOLVED, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE BY FREE DRAFT

M2

70.56

$227.71

$16,067.22

14

DISASSEMBLY OF GLASSES FOR METALLIC WINDOWS IN INTERIORS, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING OF THE PROFILES, LABOR INVOLVED, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE PLACE OF WORK AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT

M2

2.51

$108.74

$272.94

15

DISASSEMBLY OF THE DOUBLE LEAF DOOR WITH ALUMINUM PROFILES MEASURING 1.40X2.20M, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$552.78

$552.78

16

DISASSEMBLY OF METAL DOOR OF 0.90X2.10 M., INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, EQUIPMENT AND TOOLS.

PC

3.00

$648.34

$1,945.02

17

DISASSEMBLY OF WINDOW OF WOODEN PROFILES OF 0.90X0.90 M, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, SCAFFOLDING, EQUIPMENT AND TOOLS.

PC

1.00

$376.01

$376.01

18

DISASSEMBLY OF PUERTADADERA DE 0.90X2.10 M., INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, EQUIPMENT AND TOOLS.

PC

9.00

$341.81

$3,076.29

19

DISASSEMBLY OF WINDOWS OF SMITH PROFILES OF 0.35X0.40 M, IN THE SANITARY AREA, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, SCAFFOLDING, EQUIPMENT AND TOOL.

PC

2.00

$207.57

$415.14

20

DISASSEMBLY OF IRONWORK PROTECTION, WINDOW MEASURES 0.90X0.90 M, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, SCAFFOLDING, EQUIPMENT AND TOOLS.

PC

5.00

$206.77

$1,033.85

21

DISASSEMBLY WITH RECOVERY OF THE FLUORESCENT LUMINAIRE UP TO A HEIGHT OF 4 M. INCLUDES: DISCONNECTION, REMOVAL OF SUPPORT, SCAFFOLDING, CARRIAGE TO THE WAREHOUSE, LABOR INTERVENING, TOOLS , EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE DRAW

PC

13.00

$108.10

$1,405.30

22

DISASSEMBLY OF INTERIOR CONTACT OUTLET A BASE OF CONDUIT PIPE AND CABLES, INCLUDES: BOXES, SUPPORT, LABOR, SCAFFOLDING, EQUIPMENT AND TOOLS.

PC

32.00

$97.27

$3,112.64

23

DISASSEMBLY OF INTERIOR SWITCHOUT OUTLET FROM CONDUIT PIPE BASE AND CABLES, INCLUDES: BOXES, SUPPORT, LABOR, SCAFFOLDING, EQUIPMENT AND TOOLS.

PC

15.00

$97.27

$1,459.05

24

DISASSEMBLY OF INTERIOR LIGHTING OUTLET BASED ON CONDUIT PIPE AND CABLES UP TO A HEIGHT OF 4M, INCLUDES: BOXES, SUPPORT, LABOR, SCAFFOLDING, EQUIPMENT AND TOOLS .

SAL

24.00

$108.10

$2,594.40

25

WIRE DISCONNECTION OF ELECTRICAL SYSTEM, 14, 12 AND 10 GAUGE CABLES, INCLUDES: DISCONNECTION, CARRIAGE TO THE WAREHOUSE, LABOR, SCAFFOLDING, EQUIPMENT AND TOOLS.

M

650.00

$2.43

$1,579.50

26

REMOVAL OF 2X30 A. SAFETY SWITCH WITH FUSES, INCLUDES: DE-ENERGIZATION, DISCONNECTION OF PIPES AND CABLES, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$157.53

$157.53

27

DISASSEMBLY OF THE 16M DEVELOPMENT POWER SUPPLY LINE BASED ON 25MM CONDUIT PIPE AND CABLES, INCLUDES: BOXES, SUPPORT, LABOR, SCAFFOLDING, EQUIPMENT AND TOOLS.

PC

1.00

$972.80

$972.80

28

DISASSEMBLY OF LOADCENTER TYPEQO-6WITH SWITCHES, INCLUDES: DE-ENERGIZATION, DISCONNECTION OF PIPES AND CABLES, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$270.06

$270.06

29

DISASSEMBLY OF DOUBLE LEAF WOODEN DOOR WITH MEASURES 1.56X2.10M, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$940.00

$940.00

30

DISASSEMBLY OF DOOR WITH ALUMINUM PROFILES MEASURES 0.98X2.20M, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$376.00

$376.00

31

DISASSEMBLY OF THE SMITH GATE IN ACCESS WITH MEASURES 4.15X2.20M, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$1,542.15

$1,542.15

32

DISASSEMBLY OF THE SMITH GATE IN ACCESS WITH MEASURES 3.10X2.20M, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$1,423.53

$1,423.53

33

DISASSEMBLY OF THE SMITH GATE IN ACCESS WITH MEASURES 6.15X2.20M, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$2,643.69

$2,643.69

34

REMOVAL OF THE WINDOW OF SMITH PROFILES OF 1.88X0.90M, IN THE AREA OF THE SURVEILLANCE BOOTH, INCLUDES: HAULING TO THE SITE WAREHOUSE, CLEANING, LABOR, SCAFFOLDING, EQUIPMENT AND TOOL.

PC

2.00

$740.23

$1,480.46

35

REMOVAL OF THE WINDOW OF SMITH PROFILES OF 2.70X0.90M, IN THE AREA OF THE SURVEILLANCE BOOTH, INCLUDES: HAULING TO THE SITE WAREHOUSE, CLEANING, LABOR, SCAFFOLDING, EQUIPMENT AND TOOL.

PC

1.00

$925.29

$925.29

36

DISASSEMBLY OF THE PERIMETER FENCE OF THE SMITH BASE WITH MEASURES OF 3.0 X 1.20 M, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, LABOR, SCAFFOLDING, EQUIPMENT AND TOOL.

PC

17.00

$596.96

$10,148.32

37

DISASSEMBLY OF A TABLETOP MANUFACTURED ON A BASE OF SHEET ROCK PANEL MEASURING 1.90 MTS LONG BY. 40 METERS WIDTH PLACED UP TO A HEIGHT OF 1 M, INCLUDES: CARRIAGE TO THE SITE WAREHOUSE, CLEANING, HAND OF WORK, SCAFFOLDING, EQUIPMENT AND TOOLS.

PC

1.00

$247.60

$247.60

38

REMOVAL OF ALL KINDS OF ELECTRICAL EQUIPMENT REGULATORS, UPS, CPU, SCREENS, TV, SPEAKERS, CANNONS, SMOKE DETECTORS AND ALARMS, INCLUDES: DISCONNECTION, DISASSEMBLY, DISASSEMBLY OF FIXING SYSTEM , VERTICAL MANEUVERS UP TO A HEIGHT OF 7 M., STAIRS, SCAFFOLDING, PROTECTION OF EQUIPMENT BY THE CONTRACTOR DURING THE WORK PROCESS, LABOR, TOOLS AND SAFETY EQUIPMENT.

PC

2.00

$240.89

$481.78

39

DISMANTLING OF HYDRAULIC OUTLET IN W.C. INCLUDES: HYDRAULIC DISCONNECTION, REMOVAL OF SUPPORTS, CARRIAGE TO THE WAREHOUSE, SCAFFOLDING, LABOR INTERVENTION, TOOL, EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE FROM THE WORK TO A FREE KICK

SAL

2.00

$1,638.74

$3,277.48

40

DISMANTLING OF THE HYDRAULIC OUTLET IN THE BASIN, INCLUDES: HYDRAULIC DISCONNECTION, REMOVAL OF SUPPORTS, CARRYING TO THE WAREHOUSE, SCAFFOLDING, LABOR INTERVENTION, TOOL, EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK FREE KICK

SAL

2.00

$1,521.68

$3,043.36

41

DISMANTLING OF SANITARY EXIT IN W.C. INCLUDES: HYDRAULIC DISCONNECTION, REMOVAL OF SUPPORTS, CARRIAGE TO THE WAREHOUSE, SCAFFOLDING, LABOR THAT INTERVENES, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE DRAFT

SAL

2.00

$1,704.28

$3,408.56

42

DISMANTLING OF SANITARY EXITS IN LAVABO, INCLUDES: HYDRAULIC DISCONNECTION, REMOVAL OF SUPPORTS, CARRIAGE TO THE WAREHOUSE, SCAFFOLDING, LABOR INTERVENTION, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND REPAIR SHOT OF THE VOLUME GENERATED OUTSIDE THE WORK FREE KICK

SAL

2.00

$636.01

$1,272.02

43

DISMANTLING OF SANITARY EXITS IN THE GLUER, INCLUDES: HYDRAULIC DISCONNECTION, REMOVAL OF SUPPORTS, CARRIAGE TO THE WAREHOUSE, SCAFFOLDING, LABOR INTERVENTION, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK FREE KICK

SAL

2.00

$763.22

$1,526.44

44

DISASSEMBLY OF FALSE PLATE, INCLUDES: LABOR INVOLVED, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE A FREE SHOT.

M2

10.40

$32.28

$335.71

TOTAL TEARDOWNS

$82,798.21

DEMOLITIONS

45

DEMOLITION OF 3 MM VINYL TILE FLOOR, INCLUDES THE REMOVAL OF THE GLUE, LABOR, EQUIPMENT AND TOOLS.

M2

215.12

$42.01

$9,037.19

46

DEMOLITION OF A 15 CM THICK WALL, OF CEMENT BLOCK BY HAND WITH MARRO, INCLUDES: LABOR, SCAFFOLDING, EQUIPMENT AND TOOLS.

M2

24.29

$100.38

$2,438.23

47

DEMOLITION OF TILE ON WALLS AND PEGAZULEJO, WITH A THICKNESS OF 1 CM, AVERAGE, INCLUDES: WORKMANSHIP, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE PLACE OF WORK AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE FREE DRAW

M2

21.85

$112.23

$2,452.23

48

SIMPLE CONCRETE DEMOLITION BY HAND, WITH MARRO AND WEDGE, INCLUDES: LABOR INVOLVED, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE FROM THE WORK TO A FREE KICK

M2

2.00

$57.68

$115.36

49

DEMOLITION OF ROCKWALL, INCLUDES: LABOR, SCAFFOLDING, EQUIPMENT AND TOOLS.

M2

45.47

$31.92

$1,451.40

50

SIMPLE CONCRETE ELEMENTS DEMOLITION, INCLUDES: LABOR THAT INTERVENES, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT

M3

67.99

$1,348.55

$91,687.91

TOTAL DEMOLITIONS

$107,182.32

TOTAL PRELIMINARY WORK

$482,043.78

2

FOUNDATIONS

51

DECEPAMACHINE EXCAVATION IN TYPE II-B MATERIAL, FROM 0.00 TO -2.00 M, INCLUDES: LOADING AND HAULING BY TRUCK, 1ST KILOMETER, LABOR, EQUIPMENT AND TOOL.

M3

90.24

$432.18

$38,998.51

52

FORMATION AND COMPACTION OF EMBANKMENTS WITH 90% P.V.S.M. BANK MATERIAL, INCLUDES: SPREADING OF MATERIAL, ADDITION OF WATER, HOMOGENIZED, COMPACTED IN 20 CM THICK LAYERS, LABOR, MACHINERY AND TOOLS.

M3

226.69

$727.11

$164,828.57

53

MANUAL FINE DETAIL VERTICALLY AND EXCAVATION BOTTOM. INCLUDES: LABOR, MINOR CONSTRUCTION EQUIPMENT, SAFETY EQUIPMENT, TOOLS, CONSUMABLES, VERTICAL AND HORIZONTAL CARRIAGE, LIFTING, MANEUVERS, FREIGHT, DAILY GROSS CLEANING OF THE WORK AREA, REMOVAL OF MATERIAL GENERATED OUTSIDE THE SITE AT FREE SHOT.

M2

44.78

$49.98

$2,238.23

54

CONCRETE TEMPLATEf'c= 100 kg/cm2. WITH MAXIMUM AGGREGATE OF 19 mm, CONCRETE MADE ON SITE, 5 cm THICK. INCLUDES: SUPPLY OF ALL MATERIALS TO BE USED IN THE WORK, FREIGHTS, LAYOUT, SURFACE PREPARATION, LEVELING, PLACEMENT OF MASTERS @ 2.00m, PREPARATION OF THE CONCRETE, VERTICAL AND HORIZONTAL CARRIAGE TO THE SITE OF PLACEMENT OR POURING, PILLING, REMOVAL OF MASTERS, HAND WORK INTERVENES, TOOL, EQUIPMENT, EQUIPMENT SECURITY, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

M2

35.40

$188.29

$6,665.94

55

READY-MIXED CONCRETE PUMPABLE ICON-TYPE AGGREGATE, MAXIMUM 19mm (3/4"), FOR FOUNDATION OF f'c = 250 Kg/cm2, SLAMMING 12 ± 3.5 cm, CURED WITH CURAFEST MARCAFESTER ADDITIVE INCLUDES THE APPLICATION OF FLUIDIZER, SUPPLY OF ALL THE MATERIALS TO BE USED IN THE SITE, PREPARATION OF THE SURFACE, PREPARATION OF THE CONCRETE, CARRIAGE AND ELEVATIONS NECESSARY TO THE PLACEMENT OR POURING SITE, LEVELING WITH PVC CHAMFERS, VIBRATED, CURED WITH CURACRETE, LABOR. THAT INTERVENES, SCAFFOLDING, TOOL, EQUIPMENT, SAFETY EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE BY FREE DRAFT.

M3

31.10

$3,469.48

$107,902.48

56

PINE WOODEN FORMING IN FOUNDATION LUBRICATED WITH RELEASE AGENT (PROTECTOR IN MARCAPASA PASTE, MOLDUCRETO G-40 CURACRETO BRAND, CIMBRAFEST FESTER BRAND), COMMON FINISHING SHOES, DICE AND AGAINST. OF 3RD QUALITY, INCLUDES: SUPPLY OF ALL THE MATERIALS TO BE USED IN THE SITE, FREIGHT, LAYOUT, LUBRICATION OF THE SHORING, CUTS, ADJUSTMENTS, PLACEMENT, FIXING, BOLTS, SCREWS, NAILS, ANNEALED WIRE 18 GAUGE, SPACERS, VERTICAL AND HORIZONTAL CARRIAGE TO THE SITE UNPLACEMENT, LEVELING, PLACEMENT, PLUMBING, WASTE, DESCALING , CONCRETE DEBURRING, LABOR INVOLVED, SCAFFOLDING, TOOLS, EQUIPMENT, SAFETY EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

M2

186.17

$353.35

$65,784.58

57

SUPPLY AND APPLICATION WATERPROOFING OF FOUNDATION ELEMENTS, BASED ON BICOMPONENT POLYUREIC MEMBRANE MASTERSEAL M689 BRAND BASF OR SIMILAR WITH SILICA SAND. THE UNIT PRICE INCLUDES: MATERIALS, CARRIAGE, LIFTING, WASTE, LABOR, EQUIPMENT AND TOOLS.

M2

62.31

$263.73

$16,434.07

58

FILLED WITH BANK MATERIAL (TEPETATE) COMPACTED WITH 90% PROCTOR DANCER IN LAYERS NO LARGER THAN 20 CMS. INCLUDES: SUPPLY OF ALL MATERIALS, ADDITION OF THE NECESSARY WATER, LABOR, EQUIPMENT AND TOOLS.

M3

55.39

$599.24

$33,193.34

TOTAL FOUNDATIONS

$436,045.72

3

STRUCTURE

59

CONCRETE FIRM MADE ON SITE, WITH RESISTANCE f'c=200 kg/cm² AND 12 cm. THICK, ASSEMBLED WITH A GRILL WITH #3@20 RODS. IN THE HIGH BEDDING, ROADWAY WITH SADDLES, INCLUDES: SUPPLY OF MATERIALS, FREIGHT, LAYOUT, SURFACE PREPARATION, MASTERING @ 2 m, LEVELING, CONCRETE PROCESSING, BORDERS, VERTICAL AND HORIZONTAL CARRIAGE TO THE SITE OF ITS POURING, CURING WITH ADDITIVE, LABOR INTERVENING GA,TOOL , EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

M2

184.06

$612.78

$112,788.29

60

REINFORCING STEEL FOR # 3 (3/8") STRUCTURE, fy=4200 Kg/cm2 (0.557 kg/m) IN GIRDS AND COLUMNS, INCLUDES SUPPLY OF ALL MATERIALS TO BE USED ON SITE, FREIGHT, STORAGE ACCORDING TO ITS DIAMETER, STRAIGHTENED, ENABLED, NECESSARY CUTS, HOOKS, OVERLAPS, SADDLES, BRACKETS, SPACERS, BENDS, ANNEALED WIRE 18 GAUGE, TIE-DOWN AT ALL INTERSECTIONS, VERTIC HAULING HORIZONTAL ALES AND UP TO THE SITE OF ITS FINAL PLACEMENT, WASTE, CONSUMPTIONAL MATERIAL , LABOR INVOLVED, TOOLS, EQUIPMENT, SAFETY EQUIPMENT, DAILY GROSS CLEANING OF THE WORK PLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE BY FREE SHOT.

KG

1991.62

$35.92

$71,538.99

61

REINFORCING STEEL FOR # 4 (1/2") STRUCTURE, fy=4200 Kg/cm2 (0.994 kg/m) IN GIRDS AND COLUMNS, INCLUDES SUPPLY OF ALL MATERIALS TO BE USED ON SITE, FREIGHT, STORAGE ACCORDING TO ITS DIAMETER, STRAIGHTENED, ENABLED, NECESSARY CUTS, HOOKS, OVERLAPS, SADDLES, BRACKETS, SPACERS, BENDS, ANNEALED WIRE 18 GAUGE, TIE-DOWN AT ALL INTERSECTIONS, VERTIC HAULING HORIZONTAL ALES AND UP TO THE SITE OF ITS FINAL PLACEMENT, WASTE, CONSUMPTIONAL MATERIAL , LABOR INVOLVED, TOOLS, EQUIPMENT, SAFETY EQUIPMENT, DAILY GROSS CLEANING OF THE WORK PLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE BY FREE SHOT.

KG

127.49

$35.52

$4,528.44

62

REINFORCING STEEL FOR # 5 (5/8") STRUCTURE, fy=4200 Kg/cm2 (2,250 kg/m) IN GIRDS AND COLUMNS, INCLUDES SUPPLY OF ALL MATERIALS TO BE USED ON SITE, FREIGHT, STORAGE ACCORDING TO ITS DIAMETER, STRAIGHTENED, ENABLED, NECESSARY CUTS, HOOKS, OVERLAPS, SADDLES, BRACKETS, SPACERS, BENDS, ANNEALED WIRE 18 GAUGE, TIE-DOWN AT ALL INTERSECTIONS, VERTIC HAULING HORIZONTAL ALES AND UP TO THE SITE OF ITS FINAL PLACEMENT, WASTE, CONSUMPTIONAL MATERIAL , LABOR INVOLVED, TOOLS, EQUIPMENT, SAFETY EQUIPMENT, DAILY GROSS CLEANING OF THE WORK PLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE BY FREE SHOT.

KG

2349.30

$35.38

$83,118.23

63

REINFORCING STEEL FOR # 6 (3/4") STRUCTURE, fy=4200 Kg/cm2 (2,250 kg/m) IN GIRDS AND COLUMNS, INCLUDES SUPPLY OF ALL MATERIALS TO BE USED ON SITE, FREIGHT, STORAGE ACCORDING TO ITS DIAMETER, STRAIGHTENED, ENABLED, NECESSARY CUTS, HOOKS, OVERLAPS, SADDLES, BRACKETS, SPACERS, BENDS, ANNEALED WIRE 18 GAUGE, TIE-DOWN AT ALL INTERSECTIONS, VERTIC HAULING ALES AND HORIZONTALS UNTIL THE SITE OF ITS FINAL PLACEMENT, WASTE, CONSUMPTION MATERIAL, LABOR INVOLVED, TOOLS , EQUIPMENT, SAFETY EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

KG

332.64

$35.13

$11,685.64

64

READY-MIXED CONCRETE PUMPABLE ICON TYPE AGGREGATE MAXIMUM 19mm (3/4"), FOR STRUCTURE OF f'c = 250 Kg/cm2, SLAMMING 12 ± 3.5 cm, CURED WITH CURAFEST MARCAFESTER ADDITIVE. INCLUDES THE APPLICATION OF FLUIDIZER, SUPPLY OF ALL THE MATERIALS TO BE USED IN THE SITE, PREPARATION OF THE SURFACE, PREPARATION OF THE CONCRETE, CARRIAGE AND ELEVATIONS NECESSARY TO THE PLACEMENT OR POURING SITE, LEVELING WITH PVC CHAMFERS, VIBRATED, CURED WITH CURACRETE, LABOR THAT INTERNATIONAL COME ON, SCAFFOLDING, TOOL, EQUIPMENT, SAFETY EQUIPMENT, CLEANING DAILY GROSS FROM THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

M3

33.62

$3,482.78

$117,091.06

65

PINE WOODEN SHORING IN COLUMNS AND GIRDS, APPARENT FINISH, LUBRICATED WITH MOLD RELEASE (PROTECTORENPASTAMARK PASA, MOLDUCRETO G-40 CURACRETO BRAND, SHORT FEST MARCAFESTER), APPARENT FINISH 19 MM PINE TRIPLAY BASE. INCLUDES: SUPPLY OF ALL THE MATERIALS TO BE USED ON SITE, FREIGHT, STRETCH, LUBRICATION OF THE FORM, CUTS, ADJUSTMENTS, PLACEMENT, FIXING, BOLTS, SCREWS, NAILS, ANNEALED WIRE 18 GAUGE, SPACERS, VERTICAL AND HORIZONTAL CARRIAGE TO THE PLACEMENT SITE, LEVELING , PLACEMENT, PLUMBING, WASTE, SCRAPPING, CONCRETE FLUSHING, LABOR THAT INTERVENES, SCAFFOLDING, TOOL , EQUIPMENT, SAFETY EQUIPMENT, DAILY COARSE CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

M2

221.54

$428.84

$95,005.21

66

READYMIXED CONCRETE SOLID SLAB, WITH RESISTANCE f'c=250 kg/cm² AND 12 cm. THICK, ASSEMBLED WITH A #3@20 GRILL WITH RODS IN BOTH WAYS. INCLUDES: SUPPLY OF MATERIALS, FREIGHTS, LAYOUT, PREPARATION OF THE SURFACE, MASTERING @ 2m, LEVELING, BORDERS, VERTICAL AND HORIZONTAL CARRIAGES TO THE SITE OF EMPTYING, CURING WITH ADDITIVE, LABOR INVOLVED, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE PLACE OF WORK AND RETIREMENT VOLUME GENERATED OUTSIDE THE WORK AT FREE SHOT.

M2

100.11

$793.45

$79,432.28

67

READYMIXED CONCRETE SOLID SLAB, WITH RESISTANCE f'c=250 kg/cm² AND 12 cm. THICK, ASSEMBLED WITH DOUBLE GRILL #3@20, ONE IN EACH BED. INCLUDES: SUPPLY OF MATERIALS, FREIGHTS, LAYOUT, PREPARATION OF THE SURFACE, MASTERING @ 2 m, LEVELING, BORDERS, VERTICAL AND HORIZONTAL CARRIAGES TO THE SITE OF EMPTYING, CURING WITH ADDITIVE, LABOR INVOLVED, TOOLS, EQUIPMENT, DAILY CLEANING OF THE LU GAR OF WORK AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK TO FREE SHOT.

M2

115.15

$1,071.76

$123,413.16

68

SHORING IN LOSASCOMMON FINISHING, BASEDEMADERA DE PINO DE 3A, INCLUDES: MATERIALS, CARRIAGE, CUTTINGS, WASTE, ENABLING, SHORING, LABOR, EQUIPMENT AND TOOL.

M2

162.95

$370.71

$60,407.19

TOTAL STRUCTURE

$759,008.49

4

RETAINING WALLS

69

CONCRETE TEMPLATEf'c= 100 kg/cm2. WITH MAXIMUM AGGREGATE OF 19 mm, CONCRETE MADE ON SITE, 5 cm THICK. INCLUDES: SUPPLY OF ALL MATERIALS TO BE USED IN THE WORK, FREIGHTS, LAYOUT, SURFACE PREPARATION, LEVELING, PLACEMENT OF MASTERS @ 2.00m, PREPARATION OF THE CONCRETE, VERTICAL AND HORIZONTAL CARRIAGE TO THE SITE OF PLACEMENT OR POURING, PILLING, REMOVAL OF MASTERS, HAND WORK INTERVENES, TOOL, EQUIPMENT, EQUIPMENT SECURITY, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

M2

161.50

$188.29

$30,408.84

70

CORRIDATED FOOT FOR RETAINING WALL OF 0.7X0.175M. AVERAGE CANT, OF PREMIXED CONCRETE F'C=250KG/CM2, REINFORCED WITH 4 VARS. LONGITUDINAL #4 AND TRANSVERSAL#4 @ 0.2 M. WITH 0.2 X 0.3 M COUNTERBAR, ASSEMBLED WITH 4 VARS.# 4,2VARS.#3, AND BRACKETS#3 @ 0.2 M. INCLUDES: MACHINE EXCAVATION IN COMPACT TERRAIN TYPE II, SUPPLY OF MATERIALS, CARRIAGE ,CUTS, OVERLAPS, WASTE, ENABLED, TEMPLATE, COMMON FINISHING, CASTING, VIBRATED, UNSCREWING, FILLING, CLEANING, LABOR, EQUIPMENT AND TOOLS.

M

239.89

$1,933.80

$463,899.28

71

RETAINING WALL OF 0.2M. UP TO A HEIGHT OF 2.50M, MADE OF PREMIXED CONCRETE OF F'C=250KG/CM2, REINFORCED WITH DOUBLE GRILLS OF VARS.LONGITUDINAL# 3 AND TRANSVERSAL# 3 @ 0.2 M. APPARENT FINISH, INCLUDES: SUPPLY OF MATERIALS, CARRYING, CUTS, OVERLAPS, WASTE, ENABLING, FORMING, CASTING, VIBRATING, DISCOVERING, FILLING, CLEANING, LABOR, EQUIPMENT AND TOOLS.

M2

215.18

$2,250.31

$484,221.71

TOTAL RETAINING WALLS

$978,529.83

5

MASONRY

72

HOLLOW INDUSTRIALIZED PARTITION WALL WITH VIEW FACE IN MASS COLORED SANDBARKED TEXTURE, BARKED FINISH (2 SIDES), NOVACERAMIC BRAND, DIMENSIONS 5.7X12X24CM, SET WITH MORTAR TYPE I, PROPORTION 1:1/4:3, ( CEMENT-LIME -SAND) 1CM THICK, WITH HORIZONTAL REINFORCEMENT BASED ON TWO 5/16" HIGH-RESISTANCE RODS EACH 45 CM, INCLUDES: SUPPLY OF MATERIALS, LAYOUT, PLACEMENT, LEVELING, PLUMBING, STRESSING, SKETS, SKIRTS, CUTS, ADJUSTMENTS, HORIZONTAL CARRYING AND VERTIC AT ANY LEVEL, WORKMANSHIP INVOLVES, TOOLS, SCAFFOLDING, EQUIPMENT, DAILY COarse CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

M2

DOF - Official Gazette of the Federation sg11_Cx

490.35

$965.03

$473,198.91

73

0.24 CM WIDTH AREA FRAME VANOS, BASED ON INDUSTRIALIZED HOLLOW PARTITION, FACED MASS COLORED SAND TEXTURE BASKED, BASKED FINISH (3 SIDES), IN AREA OF VANOS MARCANOVACERAMIC, DIMENSIONS 5.7 X 12 X 24 CM, ESTABLISHED WITH TYPE I MORTAR, PROPORTION 1:1/4:3, (CEMENT-LIME-SAND), 1 CM THICK, INCLUDES: SUPPLY OF MATERIALS, LINE, PLACEMENT, LEVELING, PLUMBING, FURNISHING, MOCHETS, CUTS, ADJUSTMENTS, HORIZONTAL AND VERTICAL CARRYING AT ANY LEVEL, MAN ODEOBRA THAT INTERVENES, TOOL, SCAFFOLDING, EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

ML

676.50

$197.44

$133,568.16

74

INTERMEDIATE REINFORCEMENT CASTLEK-8,K-8´,2CELLSBASE OF 2 RECURGATED RODSØ#3 OF DIAMETER AND STAPLES ON BASE OF 1/ CORRUGATED ROD 4" DIAMETER 6.7CM, CONCRETE OF 150 KG/CM2 WITH MAXIMUM AGGREGATE 1/2". INCLUDES: SUPPLY OF MATERIALS, LAYOUT, PLACEMENT, LEVELING, PLUMBING, FLUSHING, KNOBS, CUTS, ADJUSTMENTS, HORIZONTAL AND VERTICAL CARRYING AT ANY LEVEL, LABOR INVOLVED, TOOLS, SCAFFOLDING, EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND REMOVAL OF THE VO LUMEN GENERATED OUTSIDE THE WORK SHOT FREE.

ML

40.80

$174.08

$7,102.46

75

INTERMEDIATE DROPPED REINFORCEMENT CASTLE K-9, 1 CELL AT A BASE OF 1 REINFORCED RODS Ø #3DEDIÀMETER, 150 KG/CM2 CONCRETE WITH MAX AGGREGATE 1/2". INCLUDES: SUPPLY OF MATERIALS, STRETCHING, PLACEMENT, LEVELING, PLUMBING, FLUSHING, SCREWS, CUTS, ADJUSTMENTS, HORIZONTAL AND VERTICAL CARRYING AT ANY LEVEL, LABOR INVOLVED, TOOLS, SCAFFOLDING, EQUIPMENT, DAILY CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK A FREE SHOT.

ML

147.90

$101.23

$14,971.92

76

INTERMEDIATE DROPPED REINFORCEMENT CASTLEOK-10,K-10`, 3-CELLS BASED ON 3 REINFORCED RODSØ #3 DIAMETER AND 2 STAPLES ON THE BASE OF REINFORCED RODS OF 1/4" DIAMETER, 6.7CM, CONCRETE OF 150 KG/CM2 WITH MAXIMUM AGGREGATE 1/2". INCLUDES: SUPPLY OF MATERIALS, LAYOUT, PLACEMENT, LEVELING, PLUMBING, FLUSHING, KNOBS, CUTS, ADJUSTMENTS, HORIZONTAL AND VERTICAL CARRYING AT ANY LEVEL, LABOR INVOLVED, TOOLS, SCAFFOLDING, EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND REMOVAL OF THE VO LUMEN GENERATED OUTSIDE THE WORK SHOT FREE.

ML

2.70

$258.56

$698.11

77

SOLID BLOCK WALL OF 10 x 20 x 40 cm, ESTABLISHED WITH CEMENT-SAND MORTAR PROPORTION 1:4, DE 15MM, INCLUDES: SUPPLY OF MATERIALS, LINE, PLACEMENT , LEVELING, PLUMBING, FLUSHING, KNITTING, CUTS, ADJUSTMENTS, HORIZONTAL AND VERTICAL CARRYING AT ANY LEVEL, LABOR INVOLVED, TOOLS, SCAFFOLDING, EQUIPMENT, DAILY COARSE CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

M2

60.16

$386.02

$23,221.81

78

SOLID BLOCK WALL OF 12 x 20 x 40 cm, ESTABLISHED WITH CEMENT-SAND MORTAR PROPORTION 1:4, DE 15MM, INCLUDES: SUPPLY OF MATERIALS, LAYOUT, PLACEMENT , LEVELING, PLUMBING, FLUSHING, KNITTING, CUTS, ADJUSTMENTS, HORIZONTAL AND VERTICAL CARRYING AT ANY LEVEL, LABOR INVOLVED, TOOLS, SCAFFOLDING, EQUIPMENT, DAILY COARSE CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

M2

42.73

$408.56

$17,457.77

79

REINFORCED CONCRETE CASTLE TYPE K-1, K-6, MEASURE 10 x 15 CM, (SEE PLAN ARQ2-AL-DT-01), MADE IN WORK WITH COMMON FINISH, F'C=200KG/CM2, ASSEMBLED WITH 4 3/8" RODS AND 1/4" BRACKETS AT EACH 15CM, INCLUDES: SUPPLY OF MATERIALS, STEEL ENABLED, CUTS, WASTE, OVERLAPS, BENDS, TIE-DOWNS, HOOKS, SHORING , DISCOVERING, CURING, CARRIAGE, PREPARATION OF CONCRETE ON SITE, VERTICAL AND HORIZONTAL CARRIAGE TO THE SITE OF ITS EMPTYING, CHOPPING, LABOR INVOLVED, TOOLS, SCAFFOLDING, EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE FREE SHOT WORK. VOLUME GENERATED OUTSIDE THE WORK AT FREE SHOT.

M

64.50

$344.10

$22,194.45

80

INTERMEDIATE AND ENCLOSURE CHAIN, TYPE CI-02, CC-02 AND CC-05, RESPECTIVELY, (SEE PLANO ARQ2-AL-DT-01), SIZE 12X20 CM BASE OF REINFORCED CONCRETE F'C=200 KG/CM2, ASSEMBLED WITH 4 RODS OF 3/8" F'Y= 4,200 KG/CM2 AND 1/4" STIRRUPS EACH15CM. APPARENT FINISH, INCLUDES: SUPPLY OF MATERIALS, LINES, STEEL WORKING, CUTS, WASTE, OVERLAPS, BENDS, TIE-DOWNS, HOOKS, SPACERS, SADDLES, SHORING, DESING, CONCRETE PROCESSING ON SITE, VERTICAL AND HORIZONTAL CARRIAGE TO THE PLACE OF ITS POURING , CHOPPED , CARRIAGE, ELEVATIONS, LABOR INVOLVED, TOOLS, SCAFFOLDING, EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS TO FREE THROW.

M

42.68

$449.59

$19,188.50

81

INTERMEDIATE CHAIN ​​AND ENCLOSURE CHAIN ​​CI-03 AND CC-03, RESPECTIVELY, (SEE PLAN ARQ2-AL-DT-01), OF SECTION 10 X 15 CM BASED ON REINFORCED CONCRETE F'C=200KG/CM2, REINFORCED WITH 4 3/8" RODS F'Y= 4,200 KG/CM2 AND 1/4" STIRRUPS AT EACH 15CM. COMMON FINISHING, INCLUDES: SUPPLY OF MATERIALS, LAYOUT, STEEL WORKING, CUTS, WASTE, OVERLAPS, BENDS, TIE-DOWNS, HOOKS, SPACERS, SADDLES, FORMING, FORMING, PROCESSING OF CONCRETE ON SITE, VERTICAL AND HORIZONTAL CARRIAGE TO THE SITE OF ITS POURING, CHOPPING, CARRYING, ELEVATIONS, LABOR THAT INTERVENES, TOOL, SCAFFOLDING, EQUIPMENT, DAILY COARSE CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

M

34.27

$383.54

$13,143.92

82

FLATTEN WALLS BASED ON CEMENT-SAND MORTAR PROPORTION 1:5, AVERAGE THICKNESS 1.5CM, INCLUDES: SUPPLY OF MATERIALS, LAYOUT, PREPARATION AND PLACEMENT OF MORTAR, NECESSARY CARRIAGES TO THE SITE OF ITS PLACEMENT, MASTERING, WORKMANSHIP INVOLVED, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE DRIVE.

M2

143.06

$253.61

$36,281.70

83

5 CM THICK CEMENT BASE - LIME - SAND PROP. 1:2:4 ON FILLING OF TEZONTLEO LIGHT MATERIAL OF THE REGION (MAXIMUM SIZE OF AGGREGATE OF 3 CM). INCLUDES: SUPPLY OF MATERIALS, PLACEMENT, LAYOUT, PREPARATION OF THE SURFACE, SUPPLY OF MATERIALS, PREPARATION OF THE MIXTURE, PLACEMENT, MASTERING @ 2.00m, LEVELING, SLOPE ACCORDING TO THE PROJECT, CURING, VERTICAL AND HORIZONTAL CARRYING THAT ARE NECESSARY AT ANY LEVEL UNTIL THE SITE OF ITS PLACEMENT, WASTE, LABOR THAT INTERVENES, TOOL, EQUIPMENT, DAILY COARSE CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

M2

148.56

$223.75

$33,239.45

84

FILLED WITH TEZONTLEENAZOTEA TO GIVE EARRINGS, (MAXIMUM SIZE OF AGGREGATE OF 3 CM) INCLUDES: SUPPLY OF MATERIALS, CARRIAGE, LIFTING, LABOR, EQUIPMENT AND TOOL.

M3

9.90

$796.29

$7,883.27

85

USG BRAND CAMERA TRUNK PANEL CEILING E=12.7MM, FIXED WITH USG 1-1/4" DS SCREWS @ 15CM. JOINT TREATMENT WITH USG DUROCK BASECOAT COMPOUND AND MCA REINFORCEMENT TAPE. DUROCK, PLASTIC CONTROL JOINTS IN "V" @ 6.10M, ONE-HAND APPLICATION OF COMEX BRAND 5X1 SEALER INCLUDES: MATERIALS, CARRYING, OVERLAPS, CUTTING, WASTE, SUPPORT, LABOR, EQUIPMENT AND TOOLS.

M2

97.27

$441.05

$42,900.93

86

CLOSURE CHAIN ​​TYPECC-06, (SEE PLANOARQ2-AL-DT-01), SECTION 12 X 15 CM ON REINFORCED CONCRETE BASE F'C=200KG /CM2, ASSEMBLED WITH 4 3/8" RODS F'Y= 4,200 KG/CM2 AND 1/4" BRACKETS AT EVERY 15CM. APPARENT FINISH, INCLUDES: SUPPLY OF MATERIALS, LINES, STEEL WORKING, CUTS, WASTE, OVERLAPS, BENDS, MOORINGS, HOOKS, SPACERS, SADDLES, FORMING, FORMING, CONCRETE PROCESSING ON SITE, VERTICAL AND HORIZONTAL HAULING TO THE EMPTY SITE, CHOPPED, CARRIES, LIFTS, WORKMANSHIP INTERVENES, TOOLS, SCAFFOLDING, EQUIPMENT, DAILY GROSS CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE BY FREE DRAFT

ML

44.44

$429.60

$19,091.42

87

REINFORCED CONCRETE RACKF'C=200KG/CM2, 48x30 CM, REINFORCED WITH 6 3/8" RODS F'Y= 4,200KG/ CM2 AND 1/4" STIRRUPS AT EACH 15CM. INCLUDES 19 MM DRIPPER. INCLUDES: SUPPLY OF MATERIALS, FREIGHTS, LAYOUT, PREPARATION OF THE SURFACE, MASTERING@2m, LEVELING, CONCRETE PROCESSING, BORDERS, VERTICAL AND HORIZONTAL CARRIAGES TO THE SITE OF ITS POURING, CURING WITH ADDITIVES, LABOR INVOLVED, TOOLS, EQUIPMENT, CLEANING DAILY GROSS FROM THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

ML

57.18

$1,292.26

$73,891.43

88

REINFORCED CONCRETE RACK F'C=200KG/CM2, 50x 30 CM, REINFORCED WITH 6 3/8" RODS F'Y= 4,200 KG/CM2Y STIRRUPES OF 1/4" AT EVERY 15CM. INCLUDES 19 MM DRIPPER. INCLUDES: SUPPLY OF MATERIALS, FREIGHTS, LAYOUT, PREPARATION OF THE SURFACE, MASTERING@2m, LEVELING, CONCRETE PROCESSING, BORDERS, VERTICAL AND HORIZONTAL CARRIAGES TO THE SITE OF ITS POURING, CURING WITH ADDITIVES, LABOR INVOLVED, TOOLS, EQUIPMENT, CLEANING DAILY GROSS FROM THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

ML

4.66

$1,309.05

$6,100.17

89

AKUSTIK SOUND-ABSORBENT PLASTERBOARD RANGE CEILING LIGHT BRAND SAINT-GOBAIN BRAND USGE=13MM, FIXED WITH DS 1-1/4" USG SCREWS @ 15 CM TREATMENT OF JOINTS WITH BASECOATUSG DUROCK COMPOUND AND MCA DUROCK REINFORCEMENT TAPE, WITH "V" PLASTIC CONTROL JOINTS @ 6.10M, APPLICATION OF ONE COAT OF SEALANT 5X1 MARCACOMEX. LABOR , EQUIPMENT AND TOOL.

M2

17.39

$814.10

$14,157.20

90

PLASTER OF EXISTING OVERFLAT REDIMIX, INCLUDES: SUPPLY OF MATERIALS, LAYOUT, PREPARATION AND PLACEMENT OF MORTAR, NECESSARY CARRIAGE TO THE SITE OF ITS PLACEMENT, MASTERWORK, LABOR THAT INTERVENES, TOOL, EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

M2

391.02

$184.27

$72,053.26

91

REINFORCED CONCRETE CASTLE TYPE K-12, SIZE 12 x 15 CM, MADE ON SITE WITH COMMON FINISH, F'C=200KG/CM2, REINFORCED WITH 4 RODS OF 3/8" AND STIRRUPES OF 1/4" AT EVERY 15CM, INCLUDES: SUPPLY OF MATERIALS, STEEL WORKING, CUTS, WASTE, OVERLAPS, BENDS, TIE-DOWNS, HOOKS, FORMING, FORMING, CURING, CARRIAGE, CONCRETE PROCESSING ON SITE, VERTICAL CARRIAGE AND HORIZONTALS UNTIL THE SITE OF EMPTYING, CHOPPING, LABOR INVOLVED, TOOLS, SCAFFOLDING, EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

ML

110.08

$352.72

$38,827.42

TOTAL MASONRY

$1,069,172.26

SMITH AND CANCELLERY

92

STANDARD DOOR MARCASANILOCK, STANDARD MODEL 4200, MEASUREMENT 61 X 150 CM. 22 GAUGE BONDERIZED GALVANIZED SHEET FINISH, LIGHT BROWN ENAMELLED FINISH CODE 5750-1 ON BOTH FACES AND ATTACHED TO A 1"X1" 20 GAUGE GALVANIZED SQUARE TUBULAR STRUCTURE, INTERIOR GRID. INSTALLATION ACCORDING TO CATALOG AND MANUFACTURER'S SPECIFICATIONS, INCLUDES: SUPPLY OF MATERIALS, LAYOUT, PLACEMENT, FIXING ELEMENTS, FIXING, PLUMBING, LEVELING , HANDLES, AND STAINLESS STEEL PLATES, PINS, METAL STUDS, BUSHINGS, SECURITY SCREWS, STOPS, RUBBER, LOWER AND UPPER HINGES, CORNERS, CHANNELS AND ADJUSTMENT FIXING SYSTEMS, ACCORDING TO THE MANUFACTURER, LABOR WORK, SEALANTS, CONSUMPTIONAL MATERIALS , CUTS, ADJUSTMENTS, WASTE, CARRIAGE, STORAGE, EQUIPMENT , TOOL, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS TO FREE DRAFT,

PC

3.00

$2,979.18

$8,937.54

93

STANDARD MARCASANILOCK DOOR, STANDARD 4200 MODEL, SIZE 120 X 150 CM. 22 GAUGE BONDERIZED GALVANIZED SHEET FINISH, LIGHT BROWN ENAMELLED FINISH CODE 5750-1 ON BOTH FACES AND ATTACHED TO A 1"X1" 20 GAUGE GALVANIZED SQUARE TUBULAR STRUCTURE, INTERIOR GRID. INSTALLATION ACCORDING TO CATALOG AND MANUFACTURER'S SPECIFICATIONS, INCLUDES: SUPPLY OF MATERIALS, LAYOUT, PLACEMENT, FIXING ELEMENTS, FIXING, PLUMBING, LEVELING , HANDLES, AND STAINLESS STEEL PLATES, PINS, METAL STUDS, BUSHINGS, SECURITY SCREWS, STOPS, RUBBER, LOWER AND UPPER HINGES, CORNERS, CHANNELS AND ADJUSTMENT FIXING SYSTEMS, ACCORDING TO THE MANUFACTURER, LABOR WORK, SEALANTS, CONSUMPTIONAL MATERIALS , CUTS, ADJUSTMENTS, WASTE, CARRIAGE, STORAGE, EQUIPMENT , TOOL, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS TO FREE DRAFT,

PC

4.00

$4,799.24

$19,196.96

94

ANILOCK BRAND SIDE PANEL, STANDARD MODEL 4200, SIZE 135 X 150 CM, FINISHED GALVANIZED BONDERIZED SHEET, 22-GAUGE ENAMELLED FINISH, LIGHT BROWN CODE 5750-1 ON BOTH FACES AND ATTACHED TO AN E TUBULAR STRUCTURE GALVANIZED SQUARE OF 1"X1" CALIBER 20, INTERIOR GRID. INSTALLATION ACCORDING TO CATALOG AND MANUFACTURER'S SPECIFICATIONS, INCLUDES: SUPPLY OF MATERIALS, LINE, PLACEMENT, FIXING ELEMENTS, FIXING, PLUMBING, LEVELING, HANDLES, AND STAINLESS STEEL PLATES, PAS ADORES, METAL STUDS, BUSHINGS, SECURITY SCREWS, STOPS, RUBBER ,LOWER AND UPPER HINGES, CORNERS, CHANNELS AND ADJUSTMENT FIXING SYSTEMS, ACCORDING TO THE MANUFACTURER, WORKMANSHIP INVOLVED, SEALANTS, CONSUMPTION MATERIALS, CUTS, ADJUSTMENTS, WASTE, CARRIAGE, STORAGE, EQUIPMENT, TOOLS, DAILY THICK CLEANING OF THE PLACE WORK AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE FREE KICK.

PC

2.00

$3,960.20

$7,920.40

95

WALL PILASTRE MARCASANILOCK, MODEL STANDARD 4200, SIZE 17 X 180 CM. 22 GAUGE BONDERIZED GALVANIZED SHEET FINISH, LIGHT BROWN ENAMELLED FINISH CODE 5750-1 ON BOTH FACES AND ATTACHED TO A 1"X1" 20 GAUGE GALVANIZED SQUARE TUBULAR STRUCTURE, INTERIOR GRID. INSTALLATION ACCORDING TO CATALOG AND MANUFACTURER'S SPECIFICATIONS, INCLUDES: SUPPLY OF MATERIALS, LAYOUT, PLACEMENT, FIXING ELEMENTS, FIXING, PLUMBING, LEVELING , HANDLES, AND STAINLESS STEEL PLATES, PINS, METAL STUDS, BUSHINGS, SECURITY SCREWS, STOPS, RUBBER, LOWER AND UPPER HINGES, CORNERS, CHANNELS AND ADJUSTMENT FIXING SYSTEMS, ACCORDING TO THE MANUFACTURER, LABOR WORK, SEALANTS, CONSUMPTIONAL MATERIALS , CUTS, ADJUSTMENTS, WASTE, CARRIAGE, STORAGE, EQUIPMENT , TOOL, DAILY THICK CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

PC

2.00

$2,153.04

$4,306.08

96

MARCASANILOCK CENTRAL PILAST, STANDARD MODEL 4200, MEASURING 30 X 180 CM. 22 GAUGE BONDERIZED GALVANIZED SHEET FINISH, LIGHT BROWN ENAMELLED FINISH CODE 5750-1 ON BOTH FACES AND ATTACHED TO A 1"X1" 20 GAUGE GALVANIZED SQUARE TUBULAR STRUCTURE, INTERIOR GRID. INSTALLATION ACCORDING TO CATALOG AND MANUFACTURER'S SPECIFICATIONS, INCLUDES: SUPPLY OF MATERIALS, LAYOUT, PLACEMENT, FIXING ELEMENTS, FIXING, PLUMBING, LEVELING , HANDLES, AND STAINLESS STEEL PLATES, PINS, METAL STUDS, BUSHINGS, SECURITY SCREWS, STOPS, RUBBER, LOWER AND UPPER HINGES, CORNERS, CHANNELS AND ADJUSTMENT FIXING SYSTEMS, ACCORDING TO THE MANUFACTURER, LABOR WORK, SEALANTS, CONSUMPTIONAL MATERIALS , CUTS, ADJUSTMENTS, WASTE, CARRIAGE, STORAGE, EQUIPMENT , TOOL, DAILY THICK CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

PC

1.00

$2,863.00

$2,863.00

97

WALL PILASTRE MARCASANILOCK, MODEL STANDARD 4200, MEASURING 20 X 180 CM. 22 GAUGE BONDERIZED GALVANIZED SHEET FINISH, LIGHT BROWN ENAMELLED FINISH CODE 5750-1 ON BOTH FACES AND ATTACHED TO A 1"X1" 20 GAUGE GALVANIZED SQUARE TUBULAR STRUCTURE, INTERIOR GRID. INSTALLATION ACCORDING TO CATALOG AND MANUFACTURER'S SPECIFICATIONS, INCLUDES: SUPPLY OF MATERIALS, LAYOUT, PLACEMENT, FIXING ELEMENTS, FIXING, PLUMBING, LEVELING , HANDLES, AND STAINLESS STEEL PLATES, PINS, METAL STUDS, BUSHINGS, SECURITY SCREWS, STOPS, RUBBER, LOWER AND UPPER HINGES, CORNERS, CHANNELS AND ADJUSTMENT FIXING SYSTEMS, ACCORDING TO THE MANUFACTURER, LABOR WORK, SEALANTS, CONSUMPTIONAL MATERIALS , CUTS, ADJUSTMENTS, WASTE, CARRIAGE, STORAGE, EQUIPMENT , TOOL, DAILY THICK CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

PC

1.00

$2,217.59

$2,217.59

98

SMITH TYPOMC-02CDE 5.51X9.27 M COMPOSED OF 1.10 X 1.74M SHEET PROTECTION(5),UPPER MODULES OF 0.97X1.35M AND INTERMEDIATE OR INTERMEDIATE MODULES LOWER 1.10 X 1.35 M, 1.10 X 1.70 M, 1.10 X 2.20 M BASED ON ALUMINUM PROFILES BRAND CUPRUM. MODEL MC-450 SERIES 14698, NATURAL ALUMINUM FINISH, HSS A-50 PROFILE REINFORCEMENT, 4" X 2" X 3/ 16", PROFILE ALUMINUM 1.750" MARCACUPRUM BAG LINE NATURAL ALUMINUM FINISH, 9MM THICK TEMPERED GLASS IN TRANSPARENT COLORFUL AND PERFORATED SHEET OF STEEL CALIBER NO.22 EXTRA DEEP DIE CUT MODEL E078/137 BRAND COLLADO. INCLUDES PLACEMENT, SEALS, VINYL, HARDWARE, LAYOUT, FREIGHT, ENABLED, SURFACE MANUFACTURING, ASSEMBLY, WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, SURROUNDING AREA PROTECTION, CARRIAGE, SAFETY EQUIPMENT, TOOLS, EQUIPMENT, CLEANING PART OF THE WORK AREA AND VOLUME WITHDRAWAL GENERATED OUTSIDE THE WORK TO FREE KICK.

PC

1.00

$151,467.97

$151,467.97

99

KHEE-01 TYPE ALUMINUM GATE OF 4.38 X 2.73 M, COMPOSED OF UPPER MODULES OF 1.13X 0.63M(3), 1.00 X 0.63 M AND ONE DOOR 1.00 X 2.10 M BASED ON ANONIZED ALUMINUM PROFILES BRAND CUPRUM LINEA PANORAMA SERIES 3.000 X 1.750" NATURAL COLOR, CLEAR TEMPERED GLASS IN UPPER OR SIDE MODULES, 6 MM THICK AND 9 MM IN DOORS. INCLUDES INSTALLATION, S THEM, FITTINGS, VINYLS, STROKE ,FREIGHT,ENABLED,MANUFACTURING OF THE SURFACE, ASSEMBLY,WELDING,CUTTING,WASTE,DISCLAIMER,SCAFFOLDING,LABOR,PROTECTION OF THE SURROUNDING AREA,HAULING,SAFETY EQUIPMENT,TOOL,EQUIPMENT,CLEANING THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED FU ERA OF THE WORK FREE KICK.

PC

1.00

$41,673.62

$41,673.62

100

KHEE-02 TYPE ALUMINUM GATE OF 4.94 X 2.73 M, COMPOSED OF UPPER MODULES OF 0.86X0.63M (3), 0.67X 0.63 M ( 2), 1.00 X 0.63 M AND DOOR 1.00 X 2.10 M A BASE OF ANONIZED ALUMINUM PROFILES BRAND CUPRUM PANORAMA LINE SERIES 3.000 X 1.750" NATURAL COLOR, TEMPERED GLASS TRANSPARENT COLOR IN UPPER OR SIDE MODULES 6 MM THICK AND 9 MM IN DOORS INCLUDES PLACEMENT, SEALS, HARDWARE, VINYL, LAYOUT, FREIGHT, ENABLED , SURFACE MANUFACTURING, ASSEMBLY, WELDING, CUTTING, WASTE, SCALING, SCAFFOLDING, LABOR, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOL, EQUIPMENT, CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE A FREE KICK.

PC

1.00

$49,634.87

$49,634.87

101

KHEE-03 TYPE ALUMINUM GATE OF 5.69 X 2.73 M, COMPOSED OF UPPER MODULES OF 1.00X0.63M (2), 0.99X0.63 M (2), 0.52 X 0.63, 0.49 X 0.63 M AND 0.91 X 0.63M; SIDE MODULES OF 0.99X2.10M (2), 0.52 X 2.10M, 0.49 X 0.63M, DOOR OF 0.91X2.10M AND DOORS OF 1.00 X 2.10 M (2 ) BASED ON ANONIZED ALUMINUM PROFILES MARCACUPRUMLINEAPANORAMASERIE3.000 X 1.750" NATURAL COLOR, TEMPERED GLASS IN TRANSPARENT COLOR IN UPPER OR SIDE MODULES OF 6 MM THICKNESS AND 9 MM IN DOORS. INCLUDES PLACEMENT, SEALS, HARDWARE, VINYL, STRIP, FREIGHT, HA ENABLED, MANUFACTURE OF THE SURFACE, ASSEMBLY, WELDING, CUTS, WASTE, SCALING, SCAFFOLDING, WORKMANSHIP, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOL, EQUIPMENT, CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

PC

1.00

$44,842.19

$44,842.19

102

ALUMINUM GATES TYPE KHEE-04 OF 4.38 X 2.73 M, COMPOSED OF UPPER MODULES OF 1.13X0.63M AND 1.00X 0.63M; SIDE MODULES OF 1.13 X 2.10 M AND DOOR OF 1.00X2.10MA BASE OF ANONIZED ALUMINUM PROFILES BY CUPRUM LINEA PANORAMASERIE 3.000X1.750" NATURAL COLOUR, TEMPERED GLASS IN TRANSPARENT COLOR IN UPPER OR SIDE MODULES OF 6 MM THICKNESS AND 9 MM ON DOORS. INCLUDES PLACEMENT, SEALS, HARDWARE, VINYLS , LINE, FREIGHT, ENABLED, MANUFACTURING OF THE SURFACE, ASSEMBLY, WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOL, EQUIPMENT, CLEANING OF THE WORK AREA AND REMOVAL OF THE GENERATOR VOLUME ADOFUERADELA WORK AT FREE KICK.

PC

1.00

$37,641.52

$37,641.52

103

2.55 X 2.73 M KHEE-05 TYPE ALUMINUM GATE, COMPOSED OF 1.27X0.63M UPPER MODULES (2) AND 1.27 X 2.10 SIDE MODULES M A BASE OF ANONIZED ALUMINUM PROFILES BRAND CUPRUMLINEAPANORAMASERIE 3.000 X 1.750" NATURAL COLOR, TEMPERED GLASS TRANSPARENT COLOR IN UPPER AND SIDE MODULES OF 6MM THICKNESS. INCLUDES PLACEMENT, SEALS, HARDWARE, VINYL, LAYOUT, FREIGHT, ENABLED, MANUFACTURING SURFACE ATION, ASSEMBLY, WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOL, EQUIPMENT, CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

PC

1.00

$19,135.02

$19,135.02

104

KHEE-06 TYPE ALUMINUM GATE OF 1.53 X 2.73 M, COMPOSED OF UPPER MODULES OF 0.77X0.63M (2) AND SIDE MODULES OF 0.77 X 2.10 M A BASE OF ANONIZED ALUMINUM PROFILES BRAND CUPRUMLINEAPANORAMASERIE 3.000 X 1.750" NATURAL COLOR, TEMPERED GLASS TRANSPARENT COLOR IN UPPER AND SIDE MODULES OF 6MM THICKNESS. INCLUDES PLACEMENT, SEALS, HARDWARE, VINYL, LAYOUT, FREIGHT, ENABLED, MANUFACTURING SURFACE ATION, ASSEMBLY, WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOL, EQUIPMENT, CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

PC

1.00

$12,106.91

$12,106.91

105

GATEWAY DOOR, TYPE KHEE-07, KHEE-08 AND KHEE-10, 1.00X 2.10 M WITH A BASE OF 1.750" ALUMINUM PROFILES, NATURAL FINISH AND TEMPERED GLASS, 9MM THICK INCLUDES PLACEMENT, SEALS, HARDWARE, FREIGHT, HANDLING, MANUFACTURING OF THE SURFACE, ASSEMBLY, WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOLS, EQUIPMENT, CLEANING OF THE AREA OF WORK AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK TO FREE SHOT.

PC

1.00

$10,464.10

$10,464.10

106

FIXED WINDOW DECANCELERÍA TYPEKHEE-09 OF 1.50 X 1.83 M BASED ON ANODIZED ALUMINUM PROFILES BRAND CUPRUMLINEAPANORAMASERIE 3.000 X 1.750" NATURAL COLOR AND REFLECTIVE GLASS 9 MM THICK. INCLUDE YES PLACEMENT, SEALS, HARDWARE, VINYL, LAYOUT, FREIGHT, ENABLED, SURFACE MANUFACTURING, ASSEMBLY, WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOLS, EQUIPMENT, CLEANING OF THE AREA WORK AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK TO FREE SHOT.

PC

1.00

$6,685.03

$6,685.03

107

GATE TYPE KHEE-11 OF 1.20X 1.23 M COMPOSED OF 0.60 X 1.23 SHEET PROTECTION (2) AND HINGED WINDOWS OF (0.60X 1.23 M (2) A BASE OF ALUMINUM PROFILES IN FRAME AND COUNTER-FRAME OF 2.00" X 1.75", 2.23" X 63.50" AND 4.25"X2.23", BRAND CUPRUMSERIEEUROVENTS50, PERFORATED SHEET OF STEEL GAUGE NO.22 DIE-CUT EXTRA DEEP MODEL E078/137 BRAND COLLADO Y CRISTA TEMPERED 6 MM THICKNESS. INCLUDES PLACEMENT, SEALS, HARDWARE, VINYL, LAYOUT, FREIGHT, AUTHORIZED, SURFACE MANUFACTURING, ASSEMBLY, WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, SURROUNDING AREA PROTECTION, CARRIAGE, SAFETY EQUIPMENT, TOOLS, EQUIPMENT, CLEANING PART OF THE WORK AREA AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORKS AT FREE SHOT.

PC

6.00

$7,308.85

$43,853.10

108

SMITH TYPOKHEE-120.30X2.02M, COMPOSED OF TWO 0.30 X 1.01 M PROTECTION, BASED ON 1/8"X1" STEEL ANGLES , 1/8 "x1" Profile, pierced acerocalibrane sheet. 22 Extra deep droop model E078/137 Collado brand and windows of 0.30 x 1.01 m based on 3/4 "x1/8" steel angles and crystaltemplado6mmmdeespesorcolrotransparent. INCLUDES PLACEMENT, SEALS, VINYL, HARDWARE, LAYOUT, FREIGHT, ENABLED, SURFACE MANUFACTURING, ASSEMBLY, WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, SURROUNDING AREA PROTECTION, CARRIAGE, SAFETY EQUIPMENT, TOOLS, EQUIPMENT, CLEANING PART OF THE WORK AREA AND VOLUME WITHDRAWAL GENERATED OUTSIDE THE WORK TO FREE KICK.

PC

7.00

$4,849.04

$33,943.28

109

PROJECTION WINDOW TYPE KHEE-13 OF 0.60X0.61MA ANODIZED ALUMINUM PROFILES BASE MARCACUPRUMTIPOFRAME"2.000"NATURAL ALUMINUM FINISH, PANORAMY LINE AND TEMPERED GLASS, 6 MM THICK, TRANSPARENT COLOR . INCLUDES PLACEMENT, SEALS, HARDWARE, VINYL, LAYOUT, FREIGHT, AUTHORIZED, SURFACE MANUFACTURING, ASSEMBLY, WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, SURROUNDING AREA PROTECTION, CARRIAGE, SAFETY EQUIPMENT, TOOLS, EQUIPMENT, LI PART OF THE WORK AREA AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK TO FREE SHOT.

PC

2.00

$1,093.64

$2,187.28

110

ALUMINIOTIPOKHEE-14 GATE OF 10.08 X 2.50 M, COMPOSED OF UPPER MODULES OF 0.67X0.40M (4), 0.64 X 0.40M (2) , 0.62 X 0.40M (2) And 1.22 X 0.40M (4); SIDE MODULES OF 0.67 X 2.10 M (4), 0.64 X 2.10 M (2), 0.62 X 2.10 M (2) AND DOOR OF 1.22 X 2.10 M (4) BASE OF ANODIZED ALUMINUM PROFILES BRAND CUPRUMLINEAPANORAMASERIE 3.000X1.750" NATURAL COLOR, TRANSPARENT COLOR TEMPERED GLASS IN UPPER OR SIDE MODULES OF 6 MM THICKNESS AND 9 MM DOORS. INCLUDES PLACEMENT, SEALS, HARDWARE, VINYL, LAYOUT, FREIGHT, ENABLED, SURFACE MANUFACTURING, ASSEMBLY, WELDING.

PC

1.00

$89,557.65

$89,557.65

111

KHEE-15 TYPE ALUMINUM GATE OF 2.69 X 2.50 M, COMPOSED OF UPPER MODULES OF 0.90X 0.40 M (3) AND SIDE MODULES OF 0.90 X 2.10M(3) BASED ON ANONIZED ALUMINUM PROFILES MARCACUPRUMLINEAPANORAMASERIE3.000 X 1.750" NATURAL COLOR, TEMPERED GLASS TRANSPARENT COLOR IN 6MM THICKNESS UPPER AND SIDE MODULES. INCLUDES PLACEMENT, SEALS, HARDWARE, VINYL, LAYOUT, FREIGHT, HA ENABLED, SURFACE MANUFACTURING, ASSEMBLY , WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOL, EQUIPMENT, CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

PC

2.00

$19,277.55

$38,555.10

112

ALUMINIOTIPOKHEE-16 GATE OF 2.36 X 2.50 M, COMPOSED BY UPPER MODULE OF 1.16X0.40M, 1.20 X 0.40M, SIDE MODULE OF 1.16 X 2.10 M AND DOOR 1.20 X 2.10 MA ANONIZED ALUMINUM PROFILES BASE CUPRUM BRAND PANORAMA LINE SERIES 3.000X1.750" NATURAL COLORED, TRANSPARENT TEMPERED GLASS IN UPPER SIDE MODULES 6 MM THICK AND 9 MM IN DOORS. INCLUDES PLACEMENT, SEALS, FITTINGS, VINYLS, STROKE, FREIGHT, ENABLED, MANUFACTURING OF THE SURFACE, ASSEMBLY, WELDING, CUTS, WASTE, SCALING, SCAFFOLDING, WORKMANSHIP, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOL, EQUIPMENT, CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE JOB FREE KICK.

PC

2.00

$21,639.96

$43,279.92

113

KHEE-17 TYPE ALUMINUM GATE OF 4.39 X 2.50 M, COMPOSED OF UPPER MODULES OF 1.05X0.40M, 1.20 X 0.40M, 1.14 X 0.40 M Y 1.00 X 0.40M; SIDE MODULE OF 1.14X2.10 M, 1.05 X 2.10 M, DOOR OF 1.20 X 2.10 M AND DOOR OF 1.00 X 2.10 M WITH BASE OF ANODIZED ALUMINUM PROFILES BRAND CUPRUM LINEA PANORAMA SERIES 3.000 X1.750" NATURAL COLORED, TEMPERED GLASS TRANSPARENT COLOR IN UPPER OR SIDE MODULES 6 MM THICK AND 9 MM IN DOORS. INCLUDES PLACEMENT , SEALS, FITTINGS, VINYLS, LAYOUT, FREIGHT, ENABLED, SURFACE MANUFACTURING, ASSEMBLY, WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOL, EQUIPMENT, CLEANING OF THE AREAS WORK AND RETIREMENT OF THE VOLUME GENERATED OUTSIDE THE WORK AT FREE SHOT.

PC

1.00

$43,361.09

$43,361.09

114

KHEE-18 TYPE ALUMINUM GATE OF 3.41 X 2.50 M, COMPOSED OF UPPER MODULES OF 0.81X0.40M(2), 0.90X0.40M( 2); SIDE MODULE OF 0.81 X 2.10M (2) AND DOOR OF 0.90X2.10M (2) BASE OF ANONIZED ALUMINUM PROFILES CUPRUMLINEAPANORAMASERIE 3.000X1.750" NATURAL COLOR, TRANSPARENT COLOR TEMPERED GLASS IN UPPER OR SIDE MODULES OF 6 MM THICKNESS OR AND FROM 9 MM DOORS. INCLUDES PLACEMENT, SEALS, HARDWARE, VINYL, LAYOUT, FREIGHT, ENABLED, SURFACE MANUFACTURING, ASSEMBLY, WELDING, CUTS, WASTE, SCALE, SCAFFOLDING, LABOR, SURROUNDING AREA PROTECTION, CARRIAGE, SAFETY EQUIPMENT, TOOLS SALE, EQUIPMENT, CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OFF THE SITE FREE KICK.

PC

1.00

$34,433.43

$34,433.43

115

KHEE-19 TYPE ALUMINUM GATE OF 2.45 X 2.50 M, COMPOSED OF UPPER MODULES OF 0.82X 0.40 M (3) AND SIDE MODULES OF 0.82 X 2.10M(3) BASED ON ANONIZED ALUMINUM PROFILES MARCACUPRUMLINEAPANORAMASERIE3.000 X 1.750" NATURAL COLOR, TEMPERED GLASS TRANSPARENT COLOR IN 6MM THICKNESS UPPER AND SIDE MODULES. INCLUDES PLACEMENT, SEALS, HARDWARE, VINYL, LAYOUT, FREIGHT, HA ENABLED, SURFACE MANUFACTURING, ASSEMBLY , WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOL, EQUIPMENT, CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

PC

1.00

$17,366.43

$17,366.43

116

LOUVERTIPOKHEE-20 BLIND 1.20 X 1.22 M BASED ON TUBULAR PROFILES OF BLACK SHEET CALIBER 18 TYPE R-300 OF 75MM X 38MM AND LOUVER TYPE SHEET WITH DOUBLED SHEET .18 MADE ON SITE. INCLUDES PLACEMENT, FITTINGS, LAYOUT, FREIGHT, ENABLED, MANUFACTURING OF THE SURFACE, ASSEMBLY, WELDING, CUTS, WASTE, DISCALIBER, SCAFFOLDING, LABOR, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOLS, EQUIPMENT, CLEANING OF THE AREA BEHIND LOW AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK AT FREE KICK.

PC

1.00

$4,458.46

$4,458.46

117

TYPE KHEE-21 GATE OF 1.20X 1.23 M COMPOSED OF 0.60 X 1.23 SHEET PROTECTION (2) AND HINGED WINDOWS OF (0.60X 1.23 M (2) A ALUMINUM PROFILES BASE IN 2.00" X 1.75", 2.23" X 63.50" AND 4.25"X2.23" FRAME AND COUNTER FRAME, BRAND CUPRUMSERIEEUROVENTS50 AND TEMPERED GLASS 6 MM THICK. ENABLED , SURFACE MANUFACTURING, ASSEMBLY, WELDING, CUTTING, WASTE, SCALING, SCAFFOLDING, LABOR, PROTECTION OF THE SURROUNDING AREA, CARRIAGE, SAFETY EQUIPMENT, TOOL, EQUIPMENT, CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE A FREE KICK.

PC

10.00

$6,634.50

$66,345.00

118

METAL EMERGENCY STAIRCASE, WITH A DEVELOPMENT OF 9.20 M AND A WIDTH OF 1.20 M, MADE UP OF: A: 2"X2"X5/16" ANGLE PROFILE, B : HSS PROFILE 8"X8"X1/2" C:PTRRECTANGULAR2"X4"CAL.14 D: Ce PROFILE 10"X15.30 LB/FT E: ANTI-SKID STEEL SHEET GAUGE 12F: MULTIPERFORATED SHEET CAL. 18 G: PTR 2X2"OD1/ 4" INCLUDES: MATERIALS, CARRYING, CUTS, LINE, WORKING, WELDING, APPLICATION OF ANTICORROSIVE PRIMER, ASSEMBLY, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$132,375.00

$132,375.00

TOTAL SMITH AND CANCELLERY

$968,808.54

WOODWORK

119

CONSTRUCTION OF HALL FOR COMPLAINT, MEASURES 1.80X0.75X1.05M IN HEIGHT, BASED ON 2" PTR FRAME WHITE CODE, JOINED WITH 6-13CAL ELECTRIC WELDING .332, SATIN STAINLESS STEEL HANDLE, 12MM X 128MM, CODE W200 12X128 JAKO BRAND, WITH MINIO GENU I NOMCA ANTI-CORROSIVE PRIMER, C O M E X , SOLID SURFACE COVER WITH LAMINATED PLASTIC MOD.961-58COLORFOG.MATTEFINI SH, FORMICA BRAND FIXED TO PINE TRIPLAY OF 1ST 9MM THICKNESS GLUED WITH SK 200 EPOXY ADHESIVE CODE WSA-23 RALPHWILSON BRAND PHI LIPS LOCK MODEL AS 25 0CH FINISHED IN CHROME, LAMINATED PLASTIC COATING MODEL 961-58 FOG COLOR MATTE FINISH, FORMICAFIJOA BRAND 1ST TRIPLAYDEPINODE 9MM THICKNESS GLUED WITH EPOXY ADHESIVE SK200 CODE WSA-23 BRAND RALPHWILSON. 2"X1" PTR BASE, COVERED WITH PLASTIC LAMINATE MODEL 961-58, FOG MATTE FINISH COLOR, FORMICA BRAND, FIXED TO 1ST 9MM THICK PINE TRIPLAY, GLUED WITH SK EPOXY ADHESIVE 200, CODE WSA-23 MARK RALPH WILSON. INCLUDES: SUPPLY OF MATERIALS, PLACEMENT, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$33,738.24

$33,738.24

TOTAL CARPENTRY

$33,738.24

DOORS

120

P-1 DOOR SIZES 85 X 210 CM MADE WITH 1A PINE WOOD FRAME. 1 1/2 "X11/4, TRIPLAY IN 1A PINEWOOD. E=6 MM FINISHED WITH LAMINATED PLASTIC BRAND RALPHWILSON, ELEMENTARY LINE, ALBA OAK MODEL CODE 40400, GLUED WITH EPOXY ADHESIVE SK 200 CODE WSA-23 RALPH WILSON BRAND, INCLUDES: MATERIALS SUPPLY, LINE , PLACEMENT, FIXING ELEMENTS, PLUMBING, LEVELING, STAINLESS STEEL SHEETS, PINS, SECURITY SCREWS, STOPS, RUBBER, LOWER AND UPPER HINGES, CORNERS, CHANNELS AND ADJUSTMENT AS FIXING SYSTEMS, ACCORDING TO THE MANUFACTURER, LABOR INVOLVED, SEALANTS, MA CONSUMER MATERIALS, CUTS, ADJUSTMENTS , WASTE, CARRIAGE, STORAGE, EQUIPMENT, TOOL, DAILY GROSS CLEANING OF THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE DRIVE.

PC

3.00

$7,713.17

$23,139.51

121

P-2 DOOR MEASURES 90X210 CM, MADE WITH 1A PINE WOOD FRAME. 1 1/2"X11/4, 1A PINEWOOD TRIPLAY. E=6 MM FINISHED WITH LAMINATED PLASTIC BRAND RALPHWILSON, ELEMENTARY LINE, ALBA OAK MODEL CODE 40400, GLUED WITH EPOXY ADHESIVE SK 200 CODE WSA-23 RALPH WILSON BRAND WITH FRAME 16 GAUGE COLD ROLLED STEEL FINISH PRIMER ECONOMY PRIMER HIGH RESISTANCE TO CORROR HERWINWILLIAMSYPAINTING HIGHLY WASHABLE ALKYD ENAMEL PABBRANDSHERWINWILLIAMSCOLOR SW1160, INCLUDES: SUPPLY OF MATERIALS, STRETCH, PLACEMENT, FIXING ELEMENTS , PLUMBING, LEVELING, STAINLESS STEEL PLATES, PINS, SECURITY SCREWS, STOPS, RUBBER, LOWER AND UPPER HINGES, CORNER BEADS, CHANNELS AND ADJUSTMENT SYSTEMS AS FIXING SYSTEMS, ACCORDING TO THE MANUFACTURER, WORKMANSHIP INVOLVED, SEALANTS, CONSUMPTION MATERIALS, CUTS, ADJUSTMENTS, WASTE, CARRIAGE, STORAGE, EQUIPMENT, TOOLS, DAILY GROSS CLEANING OF THE WORK PLACE AND VOLUME REMOVAL MENU GENERATED OUTSIDE THE SHOT WORK FREE.

PC

2.00

$7,907.65

$15,815.30

122

P-3 DOOR MEASURES 100X 210 CM, MADE WITH 1A PINE WOOD FRAME. 1 1/2"X11/4, 1A PINEWOOD TRIPLAY. E=6 MM FINISHED WITH LAMINATED PLASTIC BRAND RALPHWILSON, ELEMENTARY LINE, ALBA OAK MODEL CODE 40400, GLUED WITH EPOXY ADHESIVE SK 200 CODE WSA-23 RALPH WILSON BRAND, FRAME 16 GAUGE COLD ROLLED STEEL ECONOMIC PRIMER FINISH HIGH RESISTANCE TO CORROCION BRANDS HERWINWILLIAMSYPAINTINGHIGHLY WASHABLE ALKYDAL ENAMEL PAB BRANDS HERWINWILLIAMS COLOR SW1160, INCLUDES: SUPPLY OF MATERIALS, STRETCH, PLACEMENT, FIXING ELEMENTS , PLUMBING, LEVELING, STAINLESS STEEL PLATES, PINS, SECURITY SCREWS, STOPS, RUBBER, LOWER AND UPPER HINGES, CORNERS, CHANNELS AND ADJUSTMENT SYSTEMS SUCH AS FIXING SYSTEMS, ACCORDING TO THE MANUFACTURER, WORKMANSHIP INVOLVED, SEALANTS, CONSUMPTION MATERIALS, CUTS, ADJUSTMENTS, WASTE, CARRIAGE, STORAGE, EQUIPMENT, TOOLS, DAILY GROSS CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORK AT FREE SHOT.

PC

1.00

$8,198.48

$8,198.48

TOTAL DOORS

$47,153.29

FINISHES

APARTMENTS

123

P-1 STANDARD SELF-LEVELING MORTAR SURFACE FOR 5 CM THICK THICKNESS JOINTS @ 3M, POLISHED FINISH, WITH A COMPRESSION RESISTANCE OF 120 KG/CM2, CERESIT MARK OR THE EQUIVALENT. INCLUDES: SUPPLY OF MATERIALS, FREIGHTS, LAYOUT, PREPARATION OF THE SURFACE, MASTERING @ 2 m, LEVELING, CONCRETE PROCESSING, FRONTIERS, VERTICAL AND HORIZONTAL CARRIAGES TO THE SITE OF EMPTYING, CURING WITH ADDITIVES, LABOR INVOLVED, TOOLS, EQUIPMENT, CLEANING DAILY RULES FROM THE WORKPLACE AND RETIREMENT OF THE VOLUME GENERATED OUTSIDE THE WORK AT FREE SHOT.

M2

1138.13

$334.65

$380,875.20

124

P-2 STANDARD SELF-LEVELING MORTAR SURFACE FOR THICK 5 CM THICKNESS JOINTS @ 3M, WASHED FINISH, WITH A COMPRESSION RESISTANCE OF 120 KG/CM2, CERESIT MARK OR THE EQUIVALENT. INCLUDES: SUPPLY OF MATERIALS, FREIGHTS, LAYOUT, PREPARATION OF THE SURFACE, MASTERING @ 2 m, LEVELING, CONCRETE PROCESSING, FRONTIERS, VERTICAL AND HORIZONTAL CARRIAGES TO THE SITE OF EMPTYING, CURING WITH ADDITIVES, LABOR INVOLVED, TOOLS, EQUIPMENT, CLEANING DAILY RULES FROM THE WORKPLACE AND RETIREMENT OF THE VOLUME GENERATED OUTSIDE THE WORK AT FREE SHOT.

M2

199.33

$305.08

$60,811.60

125

P-3 MARCADALTILE MOSAIC, COLORCORN SILK 6534, PERMATONE TYPE, 5X5 CM MATT WHITE OR EQUIVALENT, SET WITH ADHESIVE FOR GRAY CERAMICS, WHITE CONCOLORED CEMENT GROUT, GOUTHED TO THE TONE OF THE MOSAIC, INCLUDES: SUPPLY OF MATERIALS, CARRIAGE, CUTS, WASTE, LABOR, EQUIPMENT AND TOOLS.

M2

46.68

$934.79

$43,636.00

126

M2

79.85

$500.61

$39,973.71

127

P-5 AND P11, WATERPROOFING BASE OF ASPHALT MODIFIED WITH SYNTHETIC POLYMERS REINFORCED WITH POLYESTER MESH AND RUBBER PARTICLES, 4.5 MM. THICK, FINISHED WITH GRAVEL OR EQUIVALENT. PLACEMENT OF THE ROLL THROUGH HEAT SENSITIVE PERPENDICULAR TO THE SLOPE, THE SUBSEQUENT CANVASES WILL BE PLACED PRIOR TO THE FIRST ALIGNMENT, AND OVERLAPPED 10CM BETWEEN EACH OTHER. INCLUDES: LAYOUT, SURFACE PREPARATION, SUPPLY, FREIGHT, PRIMARY APPLICATION, SEALING ON FINISHES AND CRACKS, PLACEMENT, OVERLAPS, CUTS, ADJUSTMENTS, LIGHTER, TORCH, GAS, WASTE, MANUFACTURER'S SPECIFICATIONS MUST BE FOLLOWED, LABOR INTERVENES, TOOL , EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE FROM THE WORK TO FREE KICK.

M2

1813.63

$501.33

$909,227.13

128

P-6 EPOXY PAINT, SYLPYL BRAND, GRAY COLORED, OR EQUIVALENT, ON A LEVELED AND POLISHED CONCRETE ROAD BY HANDS, INCLUDES: APPLICATION OF SEALANT, MATERIALS, SURFACE PREPARATION, LABOR, EQUIPMENT, TOOLS AND SCAFFOLDING.

M2

26.87

$122.30

$3,286.20

129

P-7 VINYL FLOORING, TARKETT BRAND, COLOR 21081077, ECLIPSE PREMIUM TYPE, MEASURES 2 M X 23 MX 2mm THICKNESS, OR EQUIVALENT, SURFACE OF STANDARD SELF-LEVELING MORTAR FOR THICK THICKNESS OF 5 CM THICK, WITH A COMPRESSION RESISTANCE OF 120KG/CM2, CERESIT OR EQUIVALENT MARK. COVERING (VINYL FLOORING) ANCHORED WITH LATEX 2060 GLUE FOR LVT AND ROLL FLOORS, SOLVENT-FREE, VINYLASA BRAND, USE 1.6MMX0.8MM SQUARE-TOOTH TROWELS FOR LESS WAITS. ROLL PROFILING BY MEANS OF A HOT GUN TO ACHIEVE THE THERMAL FUNCTION OF THE CANVAS AND ELIMINATE THE JOINTS. INCLUDES: SUPPLY OF MATERIALS, FREIGHTS, LAYOUT, SURFACE PREPARATION, MASTERING @ 2 m, LEVELING, CONCRETE PROCESSING, FRONTIERS, VERTICAL AND HORIZONTAL CARRIAGES TO THE POURING SITE, CURING WITH ADDITIVES, LABOR INVOLVED, TOOLS, EQUIPMENT, CLEANING G DAILY RULES FROM THE WORKPLACE AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK AT FREE SHOT.

M2

170.52

$500.61

$85,364.02

130

P-10 CLAY FLOOR, MARCANOVACERAMIC, FLOOR CODE 33NATU, POLISHED TYPE, MEASURES 33CMX33CMX1.8CM THICK, OR EQUIVALENT, ON EXISTING FLOORING OR FIRM, ESTABLISHED WITH CREST GLUE, GROUCH HEIGHT ON THE FOOT ZA, INCLUDES : SUPPLY OF MATERIALS, CARRIAGE, PLACEMENT, LABOR, EQUIPMENT AND TOOLS.

M2

229.79

$421.99

$96,969.08

TOTAL FLOORS

$1,620,142.94

WALLS

131

R-4 AND R12, VINYL-ACRYLIC PAINT, MARCACOMEX, COLORPEÓN 044-02, VINIMEX TYPE, OR EQUIVALENT, OVERCOATED WITH CEMENT-SAND BLEND, PROPORTION 1:5. TWO HANDS, INCLUDES: APPLICATION OF SEALER, MATERIALS, SURFACE PREPARATION, LABOR, EQUIPMENT, TOOLS AND SCAFFOLDING.

M2

311.59

$93.67

$29,186.64

132

R-8 MARCADALTILE MOSAIC, CORN SILK 6534 COLOR, PERMATONE TYPE, MATT WHITE 5X5 CM, OR EQUIVALENT, SET ADHESIVE FOR GRAY CERAMICS, WHITE CEMENT GROUT CONCOLOR, GOUTHED TO THE TONE OF THE MOSAIC, INCLUDES: SUPPLY OF MATERIALS, CARRIAGE, CUTS, WASTE, LABOR, EQUIPMENT AND TOOLS.

M2

15.52

$977.00

$15,163.04

TOTAL WALLS

$44,349.68

ZOCLOS

133

Z-2 EPOXY PAINT IN ZOCLO AREA, SYLPYL BRAND, GRAY COLOR, OR EQUIVALENT, ON A FLAT-FLATED CEMENT-SAND MIXED PORTION 1:5 TWO HANDS, INCLUDES: APPLICATION OF SEALER, MATERIALS, PREPARATION OF THE SURFACE, LABOR, EQUIPMENT, TOOLS AND SCAFFOLDING.

ML

13.93

$65.29

$909.49

TOTAL BASE

$909.49

CEILINGS

134

PL-1 AND PL-5, ACRYLIC PAINT, COMEX BRAND, OYSTER WHITE COLOR 764, VINIMEX TYPE, TWO-HANDED WALLCOAT FALSE CEILING, INCLUDES: APPLICATION OF SEALANT, MATERIALS, SURFACE PREPARATION, LABOR, EQUIPMENT, TOOLS AND SCAFFOLDING.

M2

114.65

$103.78

$11,898.38

135

PL-7, ACRYLIC PAINT, MARCACOMEX, COLORPEÓN044-02, TYPEVINIMEX, ON FLATTERING OF EXISTING PLASTER, INCLUDES: APPLICATION OF SEALER, MATERIALS, SURFACE PREPARATION, LABOR, EQUIPMENT, TOOLS AND SCAFFOLDING.

M2

105.13

$99.97

$10,509.85

TOTAL CEILINGS

$22,408.23

TOTAL FINISHES

$1,687,810.34

TOTAL MASONRY

$3,806,682.67

6

INST. ELECTRICAL

136

GENERAL OVERLAY PANEL "TGN" TYPE I-LINE BRAND: SQUARE-D, 3F, 4H, CAT.LA400M81BOSIMILAR, WITH MONITORING AND CONTROL EQUIPMENT POWER METER 850(PM850 ),MAIN THERMAL MAGNETIC SWITCH OF 3P-250 AMPS. INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS REQUIRED, HAULING, CONNECTIONS AND TESTING, LAYOUT, LEVELING, FIXING ELEMENTS, SUPPORT, CLEANING AND REMOVAL OF SURPLUS OFF-SITE, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHER DERIVED CHARGES ABOUT THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL.

PC

1.00

$81,483.64

$81,483.64

137

"GE"GENERAL EMERGENCY SERVICE RIDING PANEL TYPE I-LINE BRAND: SQUARE-D, 3F,4H,CAT. JG250M141B OR SIMILAR, WITH POWER METER 850(PM850) MONITORING AND CONTROL EQUIPMENT, MAIN THERMAL MAGNETIC SWITCH OF 3P-225 AMPS. INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS REQUIRED, HAULING, CONNECTIONS AND TESTING, LAYOUT, LEVELING, FIXING ELEMENTS, SUPPORT, CLEANING AND REMOVAL OF SURPLUS OFF-SITE, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHER DERIVED CHARGES ABOUT THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL.

PC

1.00

$83,925.75

$83,925.75

138

SERVICE OVERPANEL FOR REGULATED AND FORCE OF "FE" TEAMS. AUTOMATIC TRANSFER UNIT OF 3P-225A BRAND: IGSA. 3F, 4H, 60HZ, 220/127V. WITH CONTROL EQUIPMENT, MEASUREMENT OF CURRENT, VOLTAGE, FREQUENCY, HOURMETER, DETECTION OF LOW VOLTAGE BETWEEN PHASES, LESS THAN 10% OF THE NOMINAL VOLTAGE, TRANSFER CHANGE DELAY 5 MIN., STOP DELAY IN VACUUM MACHINE, MINIMUM EMERGENCY TRANSFER TIME OF 5-8 SEC., BRAND : IGSA OR SIMILAR, INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS REQUIRED, HAULING, CONNECTIONS AND TESTING, LAYOUT, LEVELING, FIXING ELEMENTS, SUPPORT, CLEANING AND REMOVAL OF SURPLUS OFF SITE, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHER CHARGES DERIVED FROM THE USE OF EQUIPMENT AND TOOLS , AT ANY LEVEL.

PC

2.00

$43,414.92

$86,829.84

139

UNINTERRUPTED POWER SYSTEM 30KVA CAPACITY MODEL TK2-030, SOLID STATE, ONGUARDBYPROLYT BRAND, CHARACTERISTICS INPUT STOP 220V +15%-25% (FULLY LOAD WITHOUT DISCHARGING THE BATTERY ,OUTPUTVOLTAGE220V +/-1%(STATIC)+/-4%(DYNAMIC),TRANSFER TIME0MS,NOMINAL FREQUENCY50/60HZ +/-10%, FREQUENCY STABILITY SELECTABLE AT +/-1%,+/-1.5% OR 2.4 %(CONLINE).TOTAL HARMONIC DISTORTION <1.5% (LINEAR LOADS), <5%(NON-LINEAR LOADS), PROTECTION AGAINST TRANSIENTS, SPEED SUPPRESSION FILTER, SURGE, ELECTRICAL NOISE FILTER AND BYPASS INCLUDED, TEMPERATURE 0° TO 40°C, ALTITUDE 3000M.A.S.N.M. , 20 MINUTES OF SUPPORT, EFFICIENCY 88.3%, INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS REQUIRED, HAULING, CONNECTIONS AND TESTING, LINES, LEVELING, FIXING ELEMENTS, SUPPORT, CLEANING AND REMOVAL OF EXCESSES OFF SITE, SAFETY EQUIPMENT, INSTALLATION SPECIFIC ACTIONS, DEPRECIATION AND OTHER CHARGES DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL.

PC

1.00

$321,773.79

$321,773.79

140

ELECTRIC POWER GENERATOR PLANT,60KWSTAND-BY,54KW PRIME REGIMEN, 220/127V,3F,4H,60HZ.F.P.=0.8.%EFFICIENCY=0.925CONTAINING ONE MAIN SWITCH OF 3P-225A, TANK INTEGRATED AT THE BASE OF THE PLANT, WITH DOUBLE BOTTOM, BRAND: IGSA OR SIMILAR INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS REQUIRED, CARRIAGE, CONNECTIONS AND TESTS, STRIP, LEVELING, FIXING ELEMENTS, SUPPORT, CLEANING AND REMOVAL SURPLUS OFF SITE, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHER CHARGES DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL.

PC

1.00

$409,829.32

$409,829.32

141

THERMAL MAGNETIC SWITCH FOR SUBGENERAL PANEL TYPE I-LINE OF 2X30 AMP; OVERLOAD PROTECTION, 25KA. SHORT CIRCUIT, CAT. HDA26030, SQUARE DO SIMILAR BRAND IN QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

9.00

$7,701.66

$69,314.90

142

THERMAL MAGNETIC SWITCH FOR SUBGENERAL PANEL TYPE I-LINE 3X15 AMP; OVERLOAD PROTECTION, 25KA. SHORT CIRCUIT, CAT. HDA36015, SQUARE DO SIMILAR BRAND IN QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

1.00

$7,701.66

$7,701.66

143

THERMAL MAGNETIC SWITCH FOR SUBGENERAL PANEL TYPE I-LINE OF 3X20 AMP; OVERLOAD PROTECTION, 25KA. SHORT CIRCUIT, CAT. HDA36020, SQUARE DO SIMILAR BRAND IN QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

3.00

$7,701.66

$23,104.97

144

THERMAL MAGNETIC SWITCH FOR SUBGENERAL PANEL TYPE I-LINE OF 3X30 AMP; OVERLOAD PROTECTION, 25KA. SHORT CIRCUIT, CAT. HDA36030, SQUARE DO SIMILAR BRAND IN QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

1.00

$7,701.66

$7,701.66

145

THERMAL MAGNETIC SWITCH FOR SUBGENERAL PANEL TYPE I-LINE OF 3X60 AMP; OVERLOAD PROTECTION, 25KA. SHORT CIRCUIT, CAT. HDA36060, SQUARE DO SIMILAR BRAND IN QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

1.00

$7,924.08

$7,924.08

146

THERMAL MAGNETIC SWITCH FOR SUBGENERAL PANEL TYPE I-LINE OF 3X100 AMP; OVERLOAD PROTECTION, 25KA. SHORT CIRCUIT, CAT. HDA36100, SQUARE DO SIMILAR BRAND IN QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

1.00

$8,444.82

$8,444.82

147

THERMAL MAGNETIC SWITCH FOR GENERAL SUBGENERAL PANEL TYPE I-LINE 3X225 AMP; OVERLOAD PROTECTION, 25KA. SHORT CIRCUIT, CAT. JDA36225, SQUARE DO SIMILAR BRAND IN QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

1.00

$17,016.36

$17,016.36

148

THERMAL MAGNETIC SWITCH, MARCOH, 3X100AMP; MARCASQUARED, NO. CATALOG NO. HDL36100;MOLDED ENCLOSURE, NEMA3R OF THE SAME BRAND, CATALOG NUMBER J250ROSIMILAR IN QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.New Code

PC

2.00

$11,066.63

$22,133.27

149

SUPPLY AND PLACEMENT OF A 41 MM THICK-WALL GALVANIZED METAL CONDUIT PIPE. OF DIAMETER.MARCARIMCO,CATUSA,PEASAORSIMILAR.INCLUDES:LABOR AND MATERIALS REQUIRED,FREIGHT TO SITE,HAULING,TRACTING,CUTTING,PRODUCING THE ROPE,FIXING,NON-GALVANIZED WIRE GUIDE. 14, COUPLINGS, CLEANING AND REMOVAL OF SURPLUS OFF-WORK, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHER CHARGES DERIVED FROM THE USE OF EQUIPMENT AND TOOLS AT ANY LEVEL.

M

15.00

$181.55

$2,723.20

150

SUPPLY AND PLACEMENT OF A 53 MM THICK WALL GALVANIZED METAL CONDUIT PIPE. OF DIAMETER.MARCARIMCO,CATUSA,PEASAORSIMILAR.INCLUDES:LABOR AND MATERIALS REQUIRED,FREIGHT TO SITE,HAULING,TRACTING,CUTTING,PRODUCING THE ROPE,FIXING,NON-GALVANIZED WIRE GUIDE. 14, COUPLINGS, CLEANING AND REMOVAL OF SURPLUS OFF-WORK, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHER CHARGES DERIVED FROM THE USE OF EQUIPMENT AND TOOLS AT ANY LEVEL.

M

31.00

$341.10

$10,573.97

151

SUPPLY AND PLACEMENT OF A 63 MM THICK-WALL GALVANIZED METAL CONDUIT PIPE. OF DIAMETER.MARCARIMCO,CATUSA,PEASAORSIMILAR.INCLUDES:LABOR AND MATERIALS REQUIRED,FREIGHT TO SITE,HAULING,TRACTING,CUTTING,PRODUCING THE ROPE,FIXING,NON-GALVANIZED WIRE GUIDE. 14, COUPLINGS, CLEANING AND REMOVAL OF SURPLUS OFF-WORK, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHER CHARGES DERIVED FROM THE USE OF EQUIPMENT AND TOOLS AT ANY LEVEL.

M

135.00

$646.48

$87,274.66

152

SUPPLY AND PLACEMENT OF COUPLE CABLEBRETHW-LS GAUGE NO. 8 AWG, CONDUMEX BRAND OR SIMILAR, QUALITY, COST AND TECHNICAL CHARACTERISTICS. INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR, DRAWING, WASTE, SCRATCHING, CUTTING, MARKING AND TESTING, GUIDING, WIRING, COMBING, CONNECTION, WELDING, TAPING, CLEANING AND REMOVAL OF EXTRA SUBJECTS, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND EXCESS GOS DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL .

M

30.00

$46.64

$1,399.10

153

SUPPLY AND PLACEMENT OF COUPLE CABLEBRETHW-LS GAUGE NO. 2 AWG, CONDUMEX BRAND OR SIMILAR, QUALITY, COST AND TECHNICAL CHARACTERISTICS. INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR, DRAWING, WASTE, SCRATCHING, CUTTING, MARKING AND TESTING, GUIDING, WIRING, COMBING, CONNECTION, WELDING, TAPING, CLEANING AND REMOVAL OF EXTRA SUBJECTS, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND EXCESS GOS DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL .

M

45.00

$168.61

$7,587.55

154

SUPPLY AND PLACEMENT OF COPPER CABLE THW-LS GAUGE NO. 1/0 AWG, CONDUMEX OR SIMILAR BRAND, QUALITY, COST AND TECHNICAL CHARACTERISTICS. INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR, DRAWING, WASTE, SCRATCHING, CUTTING, MARKING AND TESTING, GUIDING, WIRING, COMBING, CONNECTION, WELDING, TAPING, CLEANING AND REMOVAL OF EXTRA SUBJECTS, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND EXCESS GOS DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL .

M

124.00

$259.63

$32,193.67

155

SUPPLY AND PLACEMENT OF COPPER CABLE THW-LS GAUGE NO. 4/0 AWG, CONDUMEX OR SIMILAR BRAND, QUALITY, COST AND TECHNICAL CHARACTERISTICS. INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR, DRAWING, WASTE, SCRATCHING, CUTTING, MARKING AND TESTING, GUIDING, WIRING, COMBING, CONNECTION, WELDING, TAPING, CLEANING AND REMOVAL OF EXTRA SUBJECTS, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND EXCESS GOS DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL .

M

540.00

$492.21

$265,792.49

156

SUPPLY AND PLACEMENT OF BARE COPPER CABLE GAUGE NO. 8 AWG, CONDUMEX BRAND OR SIMILAR, QUALITY, COST AND TECHNICAL CHARACTERISTICS. INCLUDES: SUPPLY, PLACEMENT, POINTS, CONNECTIONS, MATERIAL, LABOR, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

M

21.50

$25.51

$548.40

157

SUPPLY AND PLACEMENT OF COUPLE CABLEBRETHW-LS GAUGE NO. 6 AWG, CONDUMEX OR SIMILAR BRAND, QUALITY, COST AND TECHNICAL CHARACTERISTICS. INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR, DRAWING, WASTE, SCRATCHING, CUTTING, MARKING AND TESTING, GUIDING, WIRING, COMBING, CONNECTION, WELDING, TAPING, CLEANING AND REMOVAL OF EXTRA SUBJECTS, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND EXCESS GOS DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL .

M

37.50

$73.14

$2,742.81

158

SUPPLY AND PLACEMENT OF BARE COPPER CABLE GAUGE NO. 4 AWG, CONDUMEX BRAND OR SIMILAR, QUALITY COST AND TECHNICAL CHARACTERISTICS. INCLUDES: DIRECT CHARGE FOR LABOR COST, HAULING, WASTE, SCRATCHING, CUTTING, MARKING AND TESTING, GUIDING, WIRING, COMBING, CONNECTION, WELDING, TAPING, CLEANING AND REMOVAL OF OFF-SITE SURPLUS, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND EXCESS GOS DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL .

M

45.00

$61.81

$2,781.64

159

SUPPLY AND PLACEMENT OF BARE COPPER CABLE GAUGE NO. 1/0 AWG, CONDUMEX BRAND OR SIMILAR, QUALITY COST AND TECHNICAL CHARACTERISTICS. INCLUDES: DIRECT CHARGE FOR LABOR COST, HAULING, WASTE, SCRATCHING, CUTTING, MARKING AND TESTING, GUIDING, WIRING, COMBING, CONNECTION, WELDING, TAPING, CLEANING AND REMOVAL OF OFF-SITE SURPLUS, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND EXCESS GOS DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL .

M

90.00

$133.28

$11,995.35

160

ZONE PANEL FOR RECESSED MOUNTING (LIGHTING AND RECEPTACLES), WITH MAIN THERMAL MAGNETIC SWITCH OF 3P-70 AMP., 18 SPACES, MODEL: NQ18-4AB100(S) , CABINET WIDTH: 508 MM (20''). SQD OR SIMILAR BRAND, 3F, 4H, 240 V.C.A., 48 V.C.D., INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS REQUIRED, WORK FREIGHT, HAULING, LAYOUT, LEVELING, EMBEDDED, ASSEMBLY, ROPE, CLEANING AND REMOVAL OF EXTRAS OUTSIDE WORK, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHER CHARGES DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL.

PC

1.00

$18,539.89

$18,539.89

161

SUPPLY AND INSTALLATION OF SCREW-ON THERMAL MAGNETIC SWITCH, FOR ZONE PANEL OF 1X15AMP; OVERLOAD PROTECTION, SHORT CIRCUIT, NO. FROM CATALOG QOB115 SQUARED MARKS SIMILAR QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

42.00

$342.44

$14,382.34

162

SUPPLY AND INSTALLATION OF THERMAL MAGNETIC SWITCH, SCREW-IN FOR ZONE PANEL OF 1X20AMP; OVERLOAD PROTECTION, SHORT CIRCUIT, NO. FROM CATALOG QOB120 SQUARED MARKS SIMILAR QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

63.00

$342.44

$21,573.51

163

SUPPLY AND INSTALLATION OF THERMAL MAGNETIC SWITCH, SCREW-IN FOR ZONE PANEL OF 2X30AMP; OVERLOAD PROTECTION, SHORT CIRCUIT, NO. FROM CATALOG QOB120 SQUARED MARKS SIMILAR QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

1.00

$728.87

$728.87

164

SUPPLY AND INSTALLATION OF THERMAL MAGNETIC SWITCH, SCREW-IN FOR ZONE PANEL OF 3X15AMP; OVERLOAD PROTECTION, SHORT CIRCUIT, NO. FROM CATALOG QOB120 SQUARED MARKS SIMILAR QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

2.00

$2,147.51

$4,295.03

165

SUPPLY AND INSTALLATION OF THERMAL MAGNETIC SWITCH, SCREW-IN FOR ZONE PANEL OF 3X20AMP; OVERLOAD PROTECTION, SHORT CIRCUIT, NO. FROM CATALOG QOB120 SQUARED MARKS SIMILAR QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

2.00

$1,718.31

$3,436.61

166

SUPPLY AND INSTALLATION OF THERMAL MAGNETIC SWITCH, SCREW-IN FOR ZONE PANEL OF 3X30AMP; OVERLOAD PROTECTION, SHORT CIRCUIT, NO. FROM CATALOG QOB120 SQUARED MARKS SIMILAR QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

3.00

$1,718.31

$5,154.92

167

SUPPLY AND INSTALLATION OF THERMAL MAGNETIC SWITCH, SCREW-IN FOR ZONE PANEL OF 3X40AMP; OVERLOAD PROTECTION, SHORT CIRCUIT, NO. FROM CATALOG QOB120 SQUARED MARKS SIMILAR QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

1.00

$1,718.31

$1,718.31

168

SUPPLY AND INSTALLATION OF THERMAL MAGNETIC SWITCH, SCREW-IN FOR ZONE PANEL OF 3X50AMP; OVERLOAD PROTECTION, SHORT CIRCUIT, NO. FROM CATALOG QOB120 SQUARED MARKS SIMILAR QUALITY AND COST INCLUDES: SUPPLY, PLACEMENT, MATERIAL, LABOR, EQUIPMENT, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

2.00

$1,718.31

$3,436.61

169

SUPPLY AND INSTALLATION OF MAGNETIC STARTER, CLASS 8536, TYPE 1, SBG-2, 220 V., 3F, 3H, 60HZ, WITH B15 THERMAL ELEMENT .5, INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS REQUIRED, FREIGHT TO SITE, DRAWING, LAYOUT, FIXING, MECHANICAL AND ELECTRICAL CONNECTION, TESTING, CLEANING AND REMOVAL OF SURPLUS OFF SITE, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND DEM CHARGES ARISING FROM THE USE OF EQUIPMENT AND TOOLS, IN ANY LEVEL.

PC

2.00

$4,853.53

$9,707.06

170

SUPPLY AND PLACEMENT OF THE GALVANIZED IRON CONDUIT PIPE WITH A THICK WALL OF 21 MM. IN DIAMETER. INCLUDES: MATERIALS, COUPLINGS, CONNECTIONS, LABOR, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

M

393.00

$118.88

$46,718.23

171

SUPPLY AND PLACEMENT OF A 27 MM THICK WALL GALVANIZED IRON CONDUIT PIPE. IN DIAMETER. INCLUDES: MATERIALS, COUPLINGS, CONNECTIONS, LABOR, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

M

249.00

$139.80

$34,811.33

172

COBRETHW-LSCALIBRENO CABLE. 10 AWG, CONDUMEX BRAND OR SIMILAR IN QUALITY, COST AND TECHNICAL CHARACTERISTICS. INCLUDES: SUPPLY, PLACEMENT, POINTS, CONNECTIONS, MATERIAL, LABOR, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

M

269.00

$24.40

$6,564.60

173

SUPPLY AND PLACEMENT OF COUPLE CABLEBRETHW-LS GAUGE NO. 4 AWG, CONDUMEX BRAND OR SIMILAR, QUALITY COST AND TECHNICAL CHARACTERISTICS. INCLUDES: SUPPLY, PLACEMENT, POINTS, CONNECTIONS, MATERIAL, LABOR, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

M

310.00

$96.27

$29,843.70

174

SUPPLY AND PLACEMENT OF BARE COPPER CABLE GAUGE NO. 12 AWG, CONDUMEX OR SIMILAR BRAND, QUALITY COST AND TECHNICAL CHARACTERISTICS. INCLUDES: SUPPLY, PLACEMENT, POINTS, CONNECTIONS, MATERIAL, LABOR, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

M

40.00

$18.82

$752.80

175

SUPPLY AND PLACEMENT OF BARE COPPER CABLE GAUGE NO. 10 AWG, CONDUMEX BRAND OR SIMILAR, QUALITY COST AND TECHNICAL CHARACTERISTICS. INCLUDES: SUPPLY, PLACEMENT, POINTS, CONNECTIONS, MATERIAL, LABOR, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

M

125.00

$25.76

$3,220.00

176

SUPPLY AND PLACEMENT OF BARE COPPER CABLE GAUGE NO. 6 AWG, CONDUMEX BRAND OR SIMILAR, QUALITY COST AND TECHNICAL CHARACTERISTICS. INCLUDES: SUPPLY, PLACEMENT, POINTS, CONNECTIONS, MATERIAL, LABOR, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

M

25.00

$54.56

$1,364.00

177

MEDIUM VOLTAGE ATTACHMENT POST (OVERHEAD- UNDERGROUND TRANSITION), COMPOSED OF: PIN-STYLE INSULATOR, 5/4" X 1/2" DOUBLE THREADED BOLT, CLAMP TYPE "U", CABLEDECOBREDESNUDOCAL. NO.1/0, PUNCHABLE TERMINAL SHOE FOR CAL. 1/0, POLYMERIC TERMINAL FOR ENERGY CABLE, GAR MECHANICAL CONNECTOR, 2, STRAP, CONNECTOR, GALV CROSSHEAD, 4" 3 OUTLET HEAT SHRINK BOOT, CLASS 25KV FUSE CUTTER, CLASS 25 METALLIC OXIDE LIGHTNING ARRESTOR KV.,PRESSURE CONNECTOR TYPE L OR T"

PC

5.00

$22,110.78

$110,553.90

178

COPPER-WELD TYPE GROUND ROD 1.60CM (5/8'') X 304.8CM LONG, 0.010'' (254 MICRONS) ELECTROLYTIC COPPER THICKNESS , CATALOG 615-900 AMESA BRAND, INCLUDES: SUPPLY, PLACEMENT, INTERCONNECTION, MATERIALS, LABOR, TOOLS, EQUIPMENT AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.

PC

5.00

$1,562.00

$7,810.00

179

THREE-PHASE RADIAL CONNECTION TRANSFORMER, CLASS 35 KV., CAPACITY OF 112.5KVA. (STANDARD NMX-J285), PRIMARY IN STAR 34.5 3 PHASE, SECONDARY IN STAR 220V ,60HZ,3PHASEANDNEUTRALGROUNDEDGROUND,4BRANCHESOF2.5%C/U,TWOUPBOARD,OF THE PRIMARY NOMINAL VOLTAGE,TO WORK AT AN AVERAGE TEMPERATURE OF 30°C, AND MAXIMUM TEMPERATURE OF 40°C, WITH ABOVE-ELEVATION OF 65°C,WITH NORMAL ACCESSORIES, WITH AN IMPEDANCE CIA OF 4.5 %, 200AMP WELL-TYPE MEDIUM VOLTAGE NOZZLES, SWORD TYPE LOW VOLTAGE TERMINAL NOZZLES, PROTECTION BY EXPULSION FUSES AND CURRENT LIMITERS, AND ACCESSORIES ACCORDING TO ANOM, BRAND: AMBER OR SIMILAR, INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS RE WANTS, CARRIAGE, CONNECTIONS AND TESTS, STROKE, LEVELING, FIXING ELEMENTS , SUPPORT, CLEANING AND REMOVAL OF SURPLUS OFF SITE, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHER CHARGES DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL.

PC

1.00

$400,433.13

$400,433.13

180

GALVANIZED METAL COVER FOR SQUARE, RIMCO, RACO OR SIMILAR REGISTRATION BOX, 120X120MM DIAMETER INCLUDES: SUPPLY, PLACEMENT, MATERIALS, TOOLS, LABOR AND EVERYTHING NECESSARY FOR ITS COMPLETION EXECUTION.

PC

9.00

$49.71

$447.39

181

FIERRODE SUPPORT SUPPORT 1/4X3/4X 1.20 M. LONG. FOR OCTAGONAL AND SQUARE BOXES, INCLUDES; DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS REQUIRED, PAINTING, FREIGHTING WORKS, HAULING, PLACING, FASTENING, LEVELING, CLEANING AND REMOVAL OF SURPLUS OUTSIDE SITE, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHERS S DERIVED FROM THE USE OF EQUIPMENT AND TOOL, AT ANY LEVEL.

PC

38.00

$252.12

$9,580.56

182

FIERRODE SUPPORT SUPPORT 1/4X3/4X 1.20 M. LONG. FOR OCTAGONAL AND SQUARE BOXES, INCLUDES; DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS REQUIRED, PAINTING, FREIGHTING WORKS, HAULING, PLACING, FASTENING, LEVELING, CLEANING AND REMOVAL OF SURPLUS OUTSIDE SITE, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHERS S DERIVED FROM THE USE OF EQUIPMENT AND TOOL, AT ANY LEVEL.

PC

208.00

$267.01

$55,538.08

183

PORCELAIN CHAIRACAT.C-756-1, MCA.THOMAS&BETTS. INCLUDES: SUPPLY AND INSTALLATION, MATERIALS, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION

PC

5.00

$2,710.08

$13,550.40

184

OUTLET FOR LUMINAIRE, COMPOSED OF: TWO 10 MM FLEXIBLE METAL CONDUIT TUBES. DIAMETERX 90 CM. LONG EACH ONE, HOUSED INSIDE: 1 BARE COPPER CABLE #12AWG. AND TWO THW-LS CABLES # 12 AWG. AT ONE END OF ONE OF THE TUBOS IS A PLUG AND AT THE OTHER TUBE A HANGING RECEPTACLE; A SQUARE BOX WITH A 100X100MM TAP, CONNECTORS, LOCKNUTS AND 10MM MONITORS. PLUG AND RECEPTACLE 1F+N+E, BRAND: LEVITON OR SIMILAR. CONNECTION POINTS= 0.20M.

SAL

78.00

$645.48

$50,347.44

185

LUMINAIR TO SUSPEND, INDUSTRIAL TYPE OF POLYCARBONATE, TECHNOLOGY

PC

18.00

$2,012.29

$36,221.22

186

GROUND INTENSIFIER GEM-25A, 11.36 KG. BAG, MCA. ERICO FOR ELECTRICAL GROUNDING. INCLUDES: SUPPLY, WATER APPLICATION, PLACEMENT IN REGISTRATION, MATERIALS, LABOR, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

5.00

$651.17

$3,255.85

187

EXOTHERMIC CONNECTION FOR CALIBERNO CABLE. 4/0 TO 5/8" COPPER ROD, MOLD CAT. GTC-142Q, LOAD115, CAT.MC-115(CADWELD). HANDLE L160 SPARK PLUG T320, MCA. BURNDYOSIMILAR, INCLUDES: MATERIALS, LABOR AND TOOLS FOR COMPLETE EXECUTION.

PC

2.00

$1,191.50

$2,383.00

188

EXOTHERMIC CONNECTION FOR CALIBERNO CABLE. 2/0 A METALLIC DOOR MCA. CADWELD MOLD VS-C2G,CONLOAD90,CAT. MC-15O (CADWELD). HANDLE L160 SPARK PLUG T320 ERICO OR SIMILAR BRAND

PC

1.00

$746.14

$746.14

189

EXOTHERMIC CONNECTION IN"X", FOR CABLE CALIBERNO.4/0 TO CABLE CALIBER NO.4/0 MCA. CADWELDMOLDEXAC-2Q2Q,CONLOAD150, CAT. MC-15O (CADWELD). HANDLE L160 CHISPEROT320 ERICOORSIMILARMARKQUALITY, COST AND TECHNICAL CHARACTERISTICS. INCLUDES: CONNECTOR, MATERIALS, LABOR AND TOOLS FOR ITS COMPLETE EXECUTION.

PC

6.00

$693.23

$4,159.38

190

EXOTHERMIC CONNECTION AT "T", FOR CABLE CALIBERNO.4/0 TO CABLE CALIBER NO.4/0 MCA. CADWELDMOLDETAC-2Q2Q,CONLOAD150, CAT. MC-15O (CADWELD). HANDLE L160 CHISPEROT320 ERICOORSIMILARMARKQUALITY, COST AND TECHNICAL CHARACTERISTICS. INCLUDES: CONNECTOR, MATERIALS, LABOR AND TOOLS FOR ITS COMPLETE EXECUTION.

PC

6.00

$746.14

$4,476.84

191

EXOTERMIC CONNECTION AT "T", FOR CABLE CALIBERNO.4/0 TO CABLE CALIBER NO.2/0 MCA. CADWELDMOLDETAC-2Q2G,CONLOAD90,CAT. MC-15O (CADWELD). HANDLE L160 CHISPEROT320 ERICOORSIMILARMARKQUALITY, COST AND TECHNICAL CHARACTERISTICS. INCLUDES: CONNECTOR, MATERIALS, LABOR AND TOOLS FOR ITS COMPLETE EXECUTION.

PC

7.00

$429.57

$3,006.99

192

OVAL CONDULET WITH INTEGRATED PACKING COVER, TYPE LB17-CG - 16 MM. DIAMETER. INCLUDES; DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS REQUIRED, FREIGHT WORK, CARRIAGE, FIXING, CLEANING AND REMOVAL OF SURPLUS OUTSIDE THE WORK, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHER CHARGES DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, IN ANY WAY LEVEL. BRAND: EATON OR SIMILAR.

PC

23.00

$61.19

$1,407.37

193

COPPER CABLETHW-LSCALIBRENO.12 AWG. CONDUMEX BRAND OR SIMILAR IN QUALITY, COST AND TECHNICAL CHARACTERISTICS. INCLUDES: SUPPLY, PLACEMENT, POINTS, CONNECTIONS, MATERIAL, LABOR, TOOL AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

ML

158.25

$22.20

$3,513.15

194

SEMI-HARD, STRANDED, COMPACT, CLASS "B" NON-INSULATED 19-WIRE ELECTROLYTIC COPPER CABLE, SPECIAL FOR EARTH GROUND, 2/0 AWG GAUGE, AMESA BRAND, NO. OF CATALOG AME-VARIOUS SIMILAR IN TECHNICAL CHARACTERISTICS AND COST. INCLUDES SUPPLY, PLACEMENT, MATERIALS, LABOR, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

ML

16.00

$304.90

$4,878.40

195

COMMERCIAL GRADE SINGLE SWITCH WITH WHITE ANTIMICROBIAL PROTECTION 1P-15A, 127VAC,60HZ, CATALOG 7601AMWYPOLYCARBONATE PLATE WITH WHITE ANTIMICROBIAL PROTECTION CATALOG PJ26AMW, PJ2 62AMW, PJ263AMW, FOR 1, 2 OR 3 WINDOWS RESPECTIVELY AS REQUIRED) MARCACOOPEROLEVITONO SIMILAR

PC

23.00

$172.74

$3,973.02

196

35MM HIGH-DIAMETER POLYETHYLENE PIPE. INCLUDES: SUPPLY AND PLACEMENT, MATERIALS, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

ML

4.00

$160.16

$640.64

197

WOOD-BASED INSULATED PROTECTION WITHOUT METAL PARTS WITH ANTI-SLIP RUBBER COVERING. .

PC

3.00

$1,277.48

$3,832.44

198

PRINTED UNDERGROUND SIGNALING TAPE, POLYETHYLENE WITH MESSAGE TO IDENTIFY MEDIUM VOLTAGE PIPES AND ONLINE CABLES, 150MM. WIDTH INCLUDES: SUPPLY AND PLACEMENT, MATERIALS, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

ML

20.00

$69.50

$1,390.00

199

GALVANIZED METAL REGISTRATION BOX, RIMCO, RACO OR SIMILAR, 100 X 100 MM. FOR 16 AND 21 MM TUBE. OF DIAMETER INCLUDES: SUPPLY, PLACEMENT, MATERIALS, TOOLS, LABOR AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

15.00

$63.04

$945.60

200

ELECTROLYTICAL COPPER CABLE WITH METALLIC SCREEN WIRE BASE AND PVC OUTER COVER, WITH 113% XLPE LINING, FOR 25 KV. CALIBER 1/0 AWG., INCLUDES: MATERIALS, COUPLINGS, CONNECTIONS, LABOR, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

ML

15.00

$279.42

$4,191.30

201

RD-17 HIGH-TENCITY POLYETHYLENE PIPE, 103 MM. DIAMETER. INCLUDES: SUPPLY AND PLACEMENT, MATERIALS, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

ML

20.00

$154.65

$3,093.00

202

FIERRODE SUPPORT SUPPORT 1/4X3/4X 1.20 M. LONG. FOR OCTAGONAL AND SQUARE BOXES, INCLUDES; DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS REQUIRED, PAINTING, FREIGHTING WORKS, HAULING, PLACING, FASTENING, LEVELING, CLEANING AND REMOVAL OF SURPLUS OUTSIDE SITE, SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHERS S DERIVED FROM THE USE OF EQUIPMENT AND TOOL, AT ANY LEVEL.

PC

65.00

$252.12

$16,387.80

203

OUTPUT OF ALUMINUM FOOT TURRET (MULE LEG) WITH 21 MM ENTRY. And 27MM. OF DIAM., HUBBELL BRAND (CAT. NO. B2429) WITH SA3825 COVER, FOR FLOOR CONNECTION., INCLUDES: DIRECT CHARGE FOR THE COST OF LABOR AND MATERIALS REQUIRED, FREIGHT TO SITE, HAULING, CONNECTION, FIXING AND TESTING, CLEANING AND REMOVAL OF EXTRAS FROM WORK , SAFETY EQUIPMENT, SPECIFIC INSTALLATIONS, DEPRECIATION AND OTHER CHARGES DERIVED FROM THE USE OF EQUIPMENT AND TOOLS, AT ANY LEVEL.

SAL

2.00

$681.62

$1,363.24

204

NORMACFE-BTTRMTB4 PRECAST REGISTRY FOR TRANSFORMER WITH POLYMERIC CONCRETE COVER WITH METALLIC HINGE. INCLUDES CARRIAGE, EXCAVATIONS, FILLING, AND EVERYTHING NECESSARY FOR ITS CORRECT PLACEMENT.

PC

1.00

$9,615.64

$9,615.64

205

SEMI-HARD, STRANDED, COMPACT, CLASS "B" ELECTROLYTIC COPPER CABLE WITHOUT INSULATION, 19 WIRE, SPECIAL FOR EARTHING, 4/0 AWG CALIBER, AMESA BRAND, NO. OF CATALOG AME-VARIOUS SIMILAR IN TECHNICAL CHARACTERISTICS AND COST. INCLUDES SUPPLY, PLACEMENT, MATERIALS, LABOR, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

ML

54.00

$424.17

$22,905.18

206

103 MM THICK WALL GALVANIZED IRON CONDUIT PIPE. DIAMETER. INCLUDES: MATERIALS, COUPLINGS, CONNECTIONS, LABOR, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

ML

6.00

$808.43

$4,850.58

207

GALVANIZED IRON CONDUIT ELBOW THICK WALL 103 MM. DIAMETER. INCLUDES: MATERIALS, COUPLINGS, CONNECTIONS, LABOR, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

1.00

$1,226.39

$1,226.39

208

BARE COPPER CABLE, 4/0 AWG GAUGE, INCLUDES: MATERIALS, COUPLINGS, CONNECTIONS, LABOR, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

ML

5.00

$318.79

$1,593.95

209

LOW VOLTAGE BUSHES SWADE TERMINAL IN TRANSFORMER CABINET. INCLUDES EVERYTHING NECESSARY FOR ITS CORRECT PLACEMENT. INCLUDES: SUPPLY AND PLACEMENT, MATERIALS, LABOR, EQUIPMENT, TOOLS AND EVERYTHING NECESSARY FOR ITS COMPLETE EXECUTION.

PC

6.00

$1,213.32

$7,279.92

210

PAYMENT OF PERMITS TO ACFE, INCLUDES HIGH ENSIS PROTER OF ELECTRICAL PROJECT, ELECTRICAL PROJECT FOR ACFE, TECHNICAL FILE REQUIRED BY RCFE, PAYMENT OF SUPERVISIONS, PAYMENT OF REGISTRATION AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.

PROCESSING

1.00

$65,230.24

$65,230.24

211

SUPERVISION BY THE ELECTRICAL INSTALLATION VERIFICATION UNIT (UVIE) INCLUDES: MANAGEMENT, REQUIRED FOLDER AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.

PROCESSING

1.00

$75,000.00

$75,000.00

212

SHORT CIRCUIT STUDY ON MAIN BUSES OF THE PROJECT SINGLE-LINE DIAGRAM, INCLUDES: SINGLE-PHASE SHORT-CIRCUIT STUDY, TWO-PHASE SHORT-CIRCUIT STUDY, SHORT-CIRCUIT-TO-GROUND STUDY, REPORT AND EVERYTHING NECESSARY FOR YOUR CORRECTION TA EXECUTION

STUDIO

1.00

$23,200.00

$23,200.00

213

STUDY OF PHYSICAL EARTH MESH, INCLUDES: CALCULATION OF STEP-STOP, CALCULATION OF DIAMETER OF CONDUCTORS, CALCULATION OF FAULT CURRENTS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.

STUDIO

1.00

$19,256.32

$19,256.32

TOTAL INST. ELECTRICAL

$2,757,329.21

7

INST. HYDRAULICS

214

SUPPLY AND PLACEMENT OF PVC PIPE CEDULA 40 (POLYVINYL CHLORIDE) WITH A DIAMETER OF 13 MM, INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CONNECTION TO PVC PIPE , CUTS, SANDING, CEMENTED, ALIGNMENT, FREIGHTS, HORIZONTAL AND VERTICAL CARRYING, MANEUVERING, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT

M

38.20

$69.84

$2,667.89

215

SUPPLY AND PLACEMENT OF PVC PIPE CEDULA 40 (POLYVINYL CHLORIDE) WITH A DIAMETER OF 19 MM, INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CONNECTION TO PVC PIPE , CUTS, SANDING, CEMENTED, ALIGNMENT, FREIGHTS, HORIZONTAL AND VERTICAL CARRYING, MANEUVERING, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT

M

13.85

$82.75

$1,146.09

216

SUPPLY AND PLACEMENT OF PVC PIPE CEDULA 40 (POLYVINYL CHLORIDE) OF 25 MM DIAMETER, INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CONNECTION TO PVC PIPE , CUTS, SANDING, CEMENTED, ALIGNMENT, FREIGHTS, HORIZONTAL AND VERTICAL CARRYING, MANEUVERING, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT

M

11.82

$104.70

$1,237.55

217

SUPPLY AND PLACEMENT OF PVC CEDULA 40 (POLYVINYL CHLORIDE) PIPE WITH A DIAMETER OF 38 MM, INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CONNECTION TO PVC PIPE , CUTS, SANDING, CEMENTED, ALIGNMENT, FREIGHTS, HORIZONTAL AND VERTICAL CARRYING, MANEUVERING, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT

M

26.19

$152.46

$3,992.93

218

SUPPLY AND PLACEMENT OF PVC PIPE CEDULA 40 (POLYVINYL CHLORIDE) OF 50 MM DIAMETER, INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CONNECTION TO PVC PIPE , CUTS, SANDING, CEMENTED, ALIGNMENT, FREIGHTS, HORIZONTAL AND VERTICAL CARRYING, MANEUVERING, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT

M

11.89

$190.19

$2,261.36

219

HYDRAULIC OUTLET FOR W.C. FLUSHOMETER WITH 25Y32MM DIAMETER PVC SCHEDULE 40 (POLYVINYL CHLORIDE) PIPE, INCLUDES: 25 MM CONNECTIONS. DIAMETER;5ELBOWS,1TEE,CAPPLUG AND 1 OUTER ROPE CONNECTOR, 1 INNER ROPE CONNECTOR, 32 MM DIAMETER CONNECTIONS; 1 ELBOW, 1 INTERIOR ROPE CONNECTOR AND 1 EXTERIOR ROPE CONNECTOR, I TEE REDUCTION OF 38X25 MM, MATERIALS, LABOR, INSTALLATION, TESTS, EQUIPMENT AND TOOLS.

SAL

6.00

$1,230.95

$7,385.70

220

HYDRAULIC OUTLET FOR WASHBASIN, WITH 13MM CEDULA 40 PVC PIPE, INCLUDES: 2 ELBOW, 1 TEE, 1 LAYER PLUG, 1 CONNECTOR OUTSIDE ROPE, MATERIALS, INSTALLATION, TESTS, EQUIPMENT AND TOOL.

SAL

10.00

$475.10

$4,751.00

221

SUPPLY AND PLACEMENT OF A 13MM DIAMETER PVC CEDULA 40 PIPE AIR RELEASE VALVE, INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CONNECTION TO YOUR BERIÁDEPVC,CUTS,SANDPAPER , CEMENTED, ALIGNMENT, FREIGHT, HORIZONTAL AND VERTICAL HAULING, MANEUVERS, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE DRAFT

SAL

3.00

$1,069.37

$3,208.11

222

HYDRAULIC OUTLET FOR SHOWER WITH PVC CEDULA 40 PIPE (POLYVINYL CHLORIDE) DE 13MM.DIAMETER, INCLUDES:2 ELBOW, 5 TEE, 2 LAYER PLUGS, AND INTERIOR ROPE CONNECTOR, 2 WELDABLE RECESSED KEYS, MATERIALS, LABOR, INSTALLATION, TESTS, EQUIPMENT AND TOOLS.

SAL

2.00

$1,720.80

$3,441.60

223

HYDRAULIC OUTLET FOR THE FLUXOMETER URMINAL, WITH 25MM CEDULA 40 (POLYVINYL CHLORIDE) PIPE. WITH A 1.5 M DEVELOPMENT, INCLUDES: 1 TEE 25 MM, 1 CAP , 5 ELBOWS, 1 COUPLING, 2 EXTERIOR ROPE CONNECTOR, 1 INTERIOR ROPE CONNECTOR, MATERIALS, LABOR, EQUIPMENT AND TOOL.

SAL

1.00

$1,227.44

$1,227.44

224

HYDRAULIC OUTLET FOR SINK WITH PVC CEDULA 40 PIPE (POLYVINYL CHLORIDE) OF 13MM. IN DIAMETER WITH A DEVELOPMENT OF 3 M, INCLUDES: 1 LAYER PLUG , A TEE, AN ELBOW AND AN INTERIOR ROPE CONNECTOR OF 13 MM. OF DIAMETER, LABOR, INSTALLATION, TESTS, EQUIPMENT AND TOOLS.

SAL

1.00

$679.41

$679.41

225

SUPPLY AND PLACEMENT OF GATE VALVE 13 mm INCLUDES: MATERIALS, INSTALLATION, LABOR, TESTING, EQUIPMENT AND TOOLS.

PC

1.00

$311.13

$311.13

226

SUPPLY AND PLACEMENT OF GATE VALVE 19mm INCLUDES: MATERIALS, INSTALLATION, LABOR, TESTING, EQUIPMENT AND TOOLS.

PC

3.00

$382.36

$1,147.08

227

SUPPLY AND PLACEMENT OF GATE VALVE 32mm INCLUDES: MATERIALS, INSTALLATION, LABOR, TESTING, EQUIPMENT AND TOOLS.

PC

1.00

$946.70

$946.70

228

SUPPLY AND PLACEMENT OF 38mm GATE VALVE INCLUDES: MATERIALS, INSTALLATION, LABOR, TESTING, EQUIPMENT AND TOOLS.

PC

6.00

$2,875.63

$17,253.78

TOTAL INST. HYDRAULICS

$51,657.77

BATHROOM FURNITURE

229

CUP FOR FLUXOMETROTYPONAODE 4.8 LITERS, WHITE COLOR, MODEL TZF-1, HELVEX BRAND. INCLUDES: SUPPLY OF MATERIALS, INSTALLATION AND FIXING, PLUGS, PROHEL JOINT, CONNECTION TO HYDROSANITARY TANKS, GROOVING IN WALLS AND SLABES, SLIPS WITH CEMENT-MORTAR PROP. 1:4, LABOR, FIXING, CONSUMPTION MATERIAL, VERTICAL AND HORIZONTAL CARRIAGE AT ANY LEVEL, WAREHOUSE CLEANING, TOOL, COARSE CLEANING OF THE WORK AREA AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK AT FREE SHOT.

PC

6.00

$5,688.67

$34,132.02

230

EXPOSED PARAW.C.DEPEDAL FLUSHOMETER WITH ANTIBACTERIAL COATING, 38MM PARASPUDDE TOP INLET, 4.8 LITERS PER FLUSH, CHROME FINISH, MODEL 310-WC-4.8, HELVEX BRAND. INCLUDES: SUPPLY OF MATERIALS, FREIGHT, SURFACE PREPARATION, PLACEMENT, HYDRAULIC CONNECTION, SEALANTS, LABOR, TOOLS, EQUIPMENT, VERTICAL AND HORIZONTAL CARRYING AT ANY LEVEL, DAILY CLEANING OF THE WORK AREA AND VOLUME REMOVAL GENERATED OUTSIDE THE WORK TO FREE KICK.

PC

6.00

$7,438.56

$44,631.36

231

INDUSTRIAL TOILET PAPER DISPENSER IN CONTINUOUS ROLL, FUTURE LINE MADE OF HIGH-QUALITY SATIN STAINLESS STEEL, MODEL AE25000, JOF BRAND. INCLUDES: INCLUDES: SUPPLY, INSTALLATION AND FIXING, ALIGNMENT, TESTS, FREIGHT, HORIZONTAL AND VERTICAL CARRIAGE, MANEUVERS, STORAGE, WASTE, TOOLS, DAILY GROSS CLEANING OF THE WORK AREA.

PC

6.00

$2,336.39

$14,018.34

232

CUP SEAT (TZF-1,TZF-17) WITHOUT ELONGATED COVER, WHITE COLOR, MODEL AF-1, HELVEX BRAND. INCLUDES: SUPPLY OF MATERIALS , INSTALLATION, FASTENING, CLEANING, LABOR, TOOLS AND EQUIPMENT.

PC

6.00

$660.94

$3,965.64

233

ROUND STAINLESS STEEL TRASH BIN CHROME RINGS, MADE OF AISI 304 GRINDED STAINLESS STEEL, HIGH QUALITY AND RESISTANCE, 0.8 MM THICK, MODEL AL60001, JOFEL BRAND, INCLUDES: SUPPLY OF MATERIALS, CLEANING, LABOR, TOOLS AND EQUIPMENT.

PC

6.00

$813.23

$4,879.38

234

DOUBLE WALL HOOK,CHROME FINISH.CLASSIC LINE,MODEL 106, HELVEX BRAND. INCLUDES: SUPPLY OF MATERIALS, FASTENING INSTALLATION, CLEANING, LABOR, TOOLS AND EQUIPMENT.

PC

6.00

$820.21

$4,921.26

235

MOUNTED BASIN WITH A PERFORATION AND WITH OVERFLOW, MODEL LV LUCERNA1, HELVEX BRAND. INCLUDES SUPPLY OF MATERIALS, INSTALLATION AND FIXING, CONNECTION TO SANITARY OUTLET, RESANES WITH CEMENT MORTAR PROP. 1:4, WASTE, LABOR, FIXING, VERTICAL AND HORIZONTAL CARRYING, TOOL, COARSE CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

PC

6.00

$3,604.92

$21,629.52

236

TIMED WASHBASIN KEY WITH ADJUSTABLE AUTOMATIC CLOSURE 5 TO 13 SEC. ANTIBACTERIAL COATING,CHROME FINISH,MODELOTV-122-1.9,HELVEX BRAND. INCLUDES: SUPPLY OF MATERIALS, INSTALLATION, FIXING, CLEANING, LABOR, TOOLS AND EQUIPMENT.

PC

10.00

$3,478.49

$34,784.90

237

CESPOL "P" WASHBASIN, 32MM DIAMETER, CHROME-PLATED BRASS WITHOUT CLOSURE, WITH REGISTRATION AND HYDRAULIC SEAL, MODELOTV-016, HELVEX BRAND. INCLUDES: SUPPLY OF MATERIALS, INSTALLATION AND FIXING , CLEANING, LABOR, TOOLS AND EQUIPMENT.

PC

10.00

$1,593.88

$15,938.80

238

COUNTER FOR BRONZE WASHBASIN WITH OVERFLOW AND GRID, MODELOTH-058, HELVEX BRAND. SUPPLY OF MATERIALS, INSTALLATION, FIXING, CLEANING, LABOR, TOOLS AND EQUIPMENT.

PC

10.00

$1,348.62

$13,486.20

239

DRY URINAL, WHITE COLOR, MODELMGGOBITDS, HELVEX BRAND. SUPPLY OF MATERIALS, INSTALLATION AND FIXING, CONNECTION OF HYDRO-SANITARY OUTLETS, SLIPS WITH MORTAR-CEMENT PROP. 1:4, LABOR, FIXING, CONSUMPTION MATERIAL, VERTICAL AND HORIZONTAL CARRYING AT ANY LEVEL, STORAGE, EQUIPMENT, TOOLS, GROSS CLEANING OF THE WORK AREA AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE WORK FREE KICK.

PC

1.00

$9,655.56

$9,655.56

240

MIRROR 170CMX100CM AND 6 MM THICK, WITH BEVELED EDGES, FIXED TO A 2" X ¾" THICK PINEWOOD FRAME, TINTED WITH AUTOMOTIVE LACQUER IN IGUALALMURO COLOR. INCLUDES: SUPPLY OF MATERIALS, FIXING INSTALLATION, CLEANING, LABOR, TOOLS AND EQUIPMENT.

PC

2.00

$5,152.53

$10,305.06

241

MIRROR 60CMX120CMY6 MM THICK, WITH BEVELED EDGES, FIXED TO A 2" X ¾" THICK PINEWOOD FRAME, TINTED WITH AUTOMOTIVE COLOR LACQUER IGUALALMURO. INCLUDES: SUPPLY OF MATERIALS, FIXING INSTALLATION, CLEANING, LABOR, TOOLS AND EQUIPMENT.

PC

4.00

$3,991.87

$15,967.48

242

REFILLABLE LIQUID SOAP DISPENSER, FUTURA STAINLESS STEEL LINE, SATIN STAINLESS COLOR WITH GRAY PLASTIC BASE, MODEL AC54000, JOFEL BRAND. INCLUDES: SUPPLY, INSTALLATION AND FIXING, ALIGNMENT, TESTS, FREIGHT, HORIZONTAL AND VERTICAL CARRYING, MANEUVERING, STORAGE, WASTE, TOOLS, DAILY GROSS CLEANING OF THE WORK AREA.

PC

10.00

$1,771.02

$17,710.20

243

Z INTERFOLDED TOWEL DISPENSER, FUTURA STAINLESS STEEL LINE, SATIN STAINLESS COLOR WITH GRAY PLASTIC BASE, MODEL AH25000, MARK JOFEL. INCLUDES: SUPPLY, INSTALLATION AND FIXING, ALIGNMENT, TESTING , FREIGHT, HORIZONTAL AND VERTICAL HAULING, MANEUVERS, STORAGE, WASTE, TOOLS, DAILY COARSE CLEANING OF THE WORK AREA.

PC

6.00

$2,301.55

$13,809.30

244

STAINLESS STEEL BIN HINGED, MADE IN SATIN STAINLESS STEEL, MODEL AL718025, MARCAJOFEL. INCLUDES: SUPPLY, INSTALLATION AND FIXING, ALIGNMENT, TESTING, FREIGHT, HORIZONTAL AND VERTICAL HAULING, MANEUVERS, A STORAGE , WASTE, TOOLS, DAILY COarse CLEANING OF THE WORK AREA.

PC

4.00

$1,101.08

$4,404.32

245

CLASSIC SOAP DISH,CHROME FINISH,MODEL108,BRANDHELVEX. INCLUDES: SUPPLY AND INSTALLATION, LABOR, TOOLS AND EQUIPMENT.

PC

2.00

$970.54

$1,941.08

246

SHOWERING CAN WITH FIXED JET,CHROME FINISH, MODEL H-201, HELVEX BRAND. INCLUDES: SUPPLY AND INSTALLATION, TATEFLON TAPE, TESTS, FREIGHT, HORIZONTAL AND VERTICAL HAULING, MANEUVERS, STORAGE, SCAFFOLDING, TOOLS, DAILY THICK CLEANING OF THE WORK AREA, REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

PC

2.00

$1,392.86

$2,785.72

247

SHOWER MIXER, CHROME FINISH, MODEL E-710, HELVEX BRAND. INCLUDES: SUPPLY AND INSTALLATION, TATEFLON TAPE, TESTS, FREIGHT, HORIZONTAL AND VERTICAL HAULING, MANEUVERS, STORAGE, SCAFFOLDING, TOOLS, DAILY THICK CLEANING OF THE WORK AREA, REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

PC

2.00

$4,112.28

$8,224.56

248

SUPPLY AND PLACEMENT OF STAINLESS STEEL TRAY TJ.411TEI LEFT DRAINER 83x56 DICA OR SIMILAR IN QUALITY, INCLUDES: COUNTER GRID-CESPOL, MATERIALS, INSTALLATION, HAND WORK, INSTALLATION, TESTS, EQUIPMENT AND TOOLS.

PC

1.00

$2,807.09

$2,807.09

249

STRAINER WITH A ROUND MOUTH, MODEL 24, BRAND HELVEX. INCLUDES: SUPPLY, INSTALLATION, TESTS, FREIGHT, HORIZONTAL AND VERTICAL CARRIAGE, MANEUVERS, STORAGE, TOOLS, GROSS CLEANING DAILY FROM THE WORK AREA, WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE BY FREE SHOT.

PC

2.00

$1,468.08

$2,936.16

250

TRAIN OF THREE-BOAS SCREEN, REDONDA, MODEL 25, BRAND HELVEX. INCLUDES: SUPPLY, INSTALLATION, TESTS, FREIGHT, HORIZONTAL AND VERTICAL HAULING, MANEUVERS, STORAGE, TOOLS, DAILY THICK CLEANING OF THE WORK AREA, WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE DRAFT.

PC

5.00

$1,840.12

$9,200.60

251

DOME STRAIN FOR ROOF CONNECTION FOR PIPE 102 mm (4") TO THREAD, MODEL 444, HELVEX BRAND. INCLUDES: SUPPLY, INSTALLATION, TESTS, FREIGHT, HORIZONTAL AND VERTICAL CARRIAGE , MANEUVERS, STORAGE, TOOLS, DAILY GROSS CLEANING OF THE WORK AREA, WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

PC

2.00

$2,033.76

$4,067.52

TOTAL BATHROOM FURNITURE

$296,202.07

TOTAL INST. HYDRAULICS

$347,859.84

8

INST. SANITARY

252

SANITARY OUTLET FOR BASIN WITHOUT VENT, WITH PVC DWV PIPE OF 38 MM DIAMETER, INCLUDES: 1 ELBOW, 1 TEE, 1 YEE REDUCTION, OF 4 "X2", MATERIALS, INSTALLATION, TESTS, EQUIPMENT AND TOOLS.

SAL

20.00

$634.29

$12,685.80

253

SANITARY OUTLET FOR CIRCULAR SINK HELVEX MOD. CH-24, BASED ON DWV PVC PIPE, 50 MM DIAMETER, INCLUDES: A 90° X 4" ELBOW, A 4" SINGLE YEE AND 2.5 M. OF 4" PIPE, MATERIALS, INSTALLATION, LABOR, TESTING, EQUIPMENT AND TOOLS.

SAL

2.00

$1,560.14

$3,120.28

254

SANITARY EXIT FOR W.C. WITHOUT VENTILATION, BASED ON 100MM DIAMETER PVC DWV PIPE, INCLUDES: A 90°X 4" ELBOW, A SINGLE 4" YEE AND 3 M. OF 4" TUBE, MATERIALS, INSTALLATION, LABOR, TESTING, EQUIPMENT AND TOOLS .

SAL

6.00

$1,137.29

$6,823.74

255

SANITARY OUTLET FOR PIPES WITH PVC DWV, 50 MM DIAMETER WITH A DEVELOPMENT OF 3M., INCLUDES: 2 90° ELBOWS, LABOR, INSTALLATION AND TESTING.

SAL

1.00

$765.64

$765.64

256

SANITARY EXIT FOR URMINITORY WITH PVC DWV PIPE, 2 ELBOWS, 4 M. OF 50MM DIAMETER PIPE, MATERIALS, LABOR, EQUIPMENT AND TOOLS.

SAL

1.00

$831.52

$831.52

257

SANITARY OUTLET FORATAPONDEREGISTRATION BASE OF 100 MM DIAMETER PVC DWV PIPE, INCLUDES: A 90°X4"ELBOD, 1.5M OF 100 MM PVC PIPE, MATERIALS, INSTALLATION, HAND WORK, TESTS, EQUIPMENT AND TOOLS.

SAL

1.00

$1,786.86

$1,786.86

258

CIRCULAR FLOOR SANITARY OUTLET BRAND HELVEX MOD. CH-25 WITH 50 MM DIAMETER PVC DWV PIPE WITH A 1.5 M DEVELOPMENT, INCLUDES: A 90°X2" ELBOW, A SIMPLE 2" AND 2.5M PIPE WITH A 2" TUBE, MATERIALS, INSTALLATION, LABOR, TESTING, EQUIPMENT AND TOOLS .

SAL

2.00

$1,525.93

$3,051.86

259

SUPPLY AND INSTALLATION OF RAINWATER DOWNPIPE, WITH A DEVELOPMENT OF 7 M. BASED ON PVC DWV CEDULA 40 PIPE, WITH HOOD, 100 MM. OF DIAMETER, OF THE MARKATISAORIMILAR, INCLUDES: 2 90° ELBOWS AND 2 45° ELBOWS, ALL THE NECESSARY MATERIALS, CARRIAGES TO THE SITE OF ITS USE, CUTS, WASTE, LABOR, EQUIPMENT AND TOOLS.

SAL

2.00

$1,622.09

$3,244.18

260

SUPPLY AND PLACEMENT OF 50 MM DIAMETER PVC DWV PIPE FOR SANITARY FURNITURE VENT, INCLUDES: ELBOWS, COUPLINGS, TEE, YEE, MATERIALS, INSTALLATION, HAND WORK, TESTS, EQUIPMENT AND TOOL.

SAL

4.00

$139.91

$559.64

261

SUPPLY AND PLACEMENT OF THE VENTILATION PIPE OUTLET BASED ON 50mm DIAMETER "M" TYPE Cu PIPE THAT CROSSES THE ROOF SLAB PROJECTING 50 CM. INCLUDES: 2 90° ELBOWS,

PC

4.00

$1,913.35

$7,653.40

TOTAL INST. SANITARY

$40,522.92

9

FIRE PROTECTION

262

SUPPLY AND PLACEMENT OF PIPE FOR FIRE PROTECTION OF Fo. Go. CED. 40 OF 50mm. INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CUTS, SANDING, ALIGNMENT, FREIGHT, HORIZONTAL AND VERTICAL HAULING, MANEUVERS, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY COARSE CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLU MENU GENERATED OUTSIDE THE WORK AT FREE KICK

ML

6.30

$548.76

$3,457.19

263

FLEXIBLE STAINLESS STEEL HOSE FOR WATER 50 MM, LENGTH 95 CM, INCLUDES: 4 COUPLINGS, 2 URREA GATE VALVES, 2 UNION NUTS, 4 NIPLES, 2 45° ELBOWS, SUPPLY, INSTALLATION, LABOR, EQUIPMENT AND TOOL.

PC

1.00

$7,806.83

$7,806.83

264

SUPPLY AND PLACEMENT OF 90º ELBOWS FOR FIRE PROTECTION PIPES OF Fo. Go.CED.40 OF 50 mm. INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CUTS, SANDING, ALIGNMENT, FREIGHT, HORIZONTAL AND VERTICAL CARRYING, MANEUVERING, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY COARSE CLEANING OF THE WORK AREA AND WITHDRAWAL OF THE VOLUME GENERATED OUTSIDE FROM THE WORK TO A FREE KICK

PC

1.00

$191.50

$191.50

265

REGISTRY OF 0.60X0.60X1.00M. AREADED RED PARTICLE WALLS, SET WITH A 1:5 CEMENT-SAND MIXTURE, WITH POLISHED FLAT ON THE INTERIOR, WITH A 10 CM COVER. CONCRETE THICKNESS OF F'C=150KG/CM2, WITH FRAME AND COUNTERFRAME ON AN IRON ANGLE BASE OF 2"X2"X1/4, REINFORCED WITH 1/4 OF 15 CM WELDED FRAME ROD, FLOOR OF 10CM. THICKNESS OF CONCRETE OF F'C=150 KG/CM2, INCLUDES: MATERIALS, CARRIAGE, EXCAVATION, LABOR, EQUIPMENT AND TOOLS.

PC

2.00

$3,628.60

$7,257.20

TOTAL FIRE PROTECTION

$18,712.72

10

AIR CONDITIONING

266

SUPPLY AND PLACEMENT OF A PVC HYDRAULIC PIPE OF 19 MM IN DIAMETER, INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CONNECTION TO THE PVC PIPE, CUTTING, SANDING, CEMENTING, ALIGNMENT, FREIGHT, HORIZONTAL AND VERTICAL HAULING, MANEUVERING, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY COARSE CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE TO FREE DRAFT

ML

10.56

$67.77

$715.65

267

SUPPLY AND PLACEMENT OF REFRIGERANT SUCTION LINE BASED ON "L" TYPE FLEXIBLE Cu PIPE, WITH 19MM DIAMETER INSULATION TYPE INSULATION. INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, COR TES , SANDING, ALIGNMENT, FREIGHT, HORIZONTAL AND VERTICAL CARRYING, MANEUVERS, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY COARSE CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHUTTLE

ML

8.06

$388.28

$3,129.54

268

SUPPLY AND PLACEMENT OF THE REFRIGERANT LIQUID LINE BASED ON 19MM DIAMETER "L" TYPE FLEXIBLE Cu PIPE. INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CUTS, SANDING, ALIGNMENT, FREIGHT, HORIZONTAL AND VERTICAL CARRIAGE, MANEUVERS, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE WORK AREA AND REMOVAL OF VOLUME GENERATED OUTSIDE FROM THE WORK TO A FREE KICK

ML

8.06

$324.82

$2,618.05

269

SUPPLY AND PLACEMENT OF 90ºX19MM DIAMETER COPPER ELBOW. INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CUTTING, SANDING, ALIGNMENT, FREIGHT, HORIZONTAL AND VERTICAL CARRIAGE, MANEUVERS, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUT FROM THE WORK TO A FREE KICK

PC

4.00

$80.06

$320.24

270

SUPPLY AND PLACEMENT OF A 90º19MM DIAMETER HYDRAULIC PVC ELBOW, INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CONNECTIONTOPVCPIPE, CUTS, SANDING, CEMENTING, ALIGNMENT, FREIGHT, HORIZONTAL AND VERTICAL HAULING, MANEUVERS, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE DRAFT

PC

4.00

$55.11

$220.44

271

12,500BTU/HRMINI-SPLIT CONDENSING UNIT SUPPLY,MARCAYORK,MODEL YSHC12-FSAADGY,MINI-SPLIT EVAPORATOR UNIT, FOR 12,900 BTU/HRMARCAYORK CAPACITY WALL,MODELOYSHC12-FSAAD g. INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, FREIGHT, HORIZONTAL AND VERTICAL HAILING, MANEUVERS, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT.

PC

2.00

$14,151.48

$28,302.96

272

CONTROL ELECTRICAL OUTLET SUPPLY FOR MINI-SPLIT EQUIPMENT BASED ON 1/2" CONDUIT TUBE, 3 THW-NO.16, INCLUDES: SUPPLY AND INSTALLATION , MATERIALS AND LABOR, PLACEMENT AND FIXING, FREIGHT, HORIZONTAL AND VERTICAL HAULING, MANEUVERS, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT.

SAL

2.00

$1,037.80

$2,075.60

TOTAL AIR CONDITIONING

$37,382.48

11

INST. TELEPHONY AND COMPUTING

CHANNELINGS

273

"THICK-WALL GALVANIZED CONDUIT PIPE, WITH A DIAMETER OF 21mm, INDICATED BY PLAFOND AND/OMUROCONTRA AND MONITOR WHEN FINDING SOME TYPE OF REGISTRATION. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION , AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

165.30

$93.19

$15,404.31

274

"9-INCH LADDER-TYPE TRAY PIPE CLAMPS PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

13.00

$600.77

$7,810.01

275

SUPPORT FOR LADDER-TYPE CABLES BETWEEN 9-INCH WIDE LOW BED AND FALSE CEILING, WITH A SEPARATION OR SPACING BETWEEN RIDERS OF 15.24cm (6 INCHES) WITH AN INTERIOR HEIGHT OF 7.409cm (2.917 INCHES), AND WITH A SUPPORT AT EVERY 2.0mts. OF SEPARATION, COMPOSED OF TWO CLIP "U" TWO THREADED ROD, A SINGLE SINGLE CHANNEL AND 8 HEXAGONAL NUTS PLUS TWO CLEMS. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

32.50

$218.68

$7,107.10

276

horizontal curve part of 9 -inch staircase cable -type cable , AND WITH A SUPPORT EACH 2.0mts. OF SEPARATION, COMPOSED BY TWO "U" CLIP TWO THREADED ROD, ONE STRAMMED UNICANAL AND 8 HEXAGONAL NUTS PLUS TWO CLEMS. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

2.00

$178.43

$356.86

277

HORIZONTAL TEE FOR DERIVATION OF CABLE SUPPORT LADDER TYPE OF 9 INCHES WIDTH, WITH A SEPARATION OR SPACING BETWEEN RUNNERS OF 15.24cm (6 INCHES) WITH A CANT USEFUL OR INTERIOR OF 7.409cm (2.917 INCHES), AND WITH A SUPPORT FOR EACH 2.0m OF SEPARATION, COMPOSED OF TWO "U" CLIP, TWO THREADED RODS, A SINGLE-CHANNEL SECTION AND 8 HEXAGONAL NUTS PLUS TWO CLAMPS. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$210.70

$210.70

278

terminal plaque partables -type -type -inch ONE SUPPORT EACH 2.0mts. OF SEPARATION, COMPOSED BY TWO "U" CLIP TWO THREADED ROD, ONE STRAMMED UNICANAL AND 8 HEXAGONAL NUTS PLUS TWO CLEMS. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

3.00

$381.33

$1,143.99

TOTAL PIPELINES

$32,032.97

WIRING ACCESSORIES

279

METAL RACK FOR 44 RACK UNITS WITH VERTICAL ORGANIZERS, SELF-SUPPORTED FOR FLOOR ANCHOR, IN LIGHT ALUMINUM ALLOY IN BLACK ELECTROSTATIC PAINT, DIMENSIONS: 2133mm. + - 50mm. HEIGHT, 482mm. + - 50mm WIDTH AND 165mm + -50mm DEEP, WITH LOAD CAPACITY OF 230Kg. WITH POLARIZED CONTACT STRIP OF 10 CONTACTS AND GROUND CONNECTION, WITH UPPER ORGANIZER WITH RADIODECURVATURE FOR CATEGORY 6 AND CATEGORY 6A WIRING, FOR TELECOMMUNICATIONS ENGINEERING SYSTEMS WITH METAL SIDE VERTICAL ORGANIZERS 2133mm HEIGHT, WITH REMOVABLE COVERS S AT BOTH ENDS, WITH VELCROYEL CINCHOSTYPE RACK SHOULD BE TESTED AND VERIFIED BY ETL, UL, CSA OR A RECOGNIZED LABORATORY FOR STRUCTURED WIRING RULES AND STANDARDS, BRAND: SYSTIMAX. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PACK

2.00

$18,032.74

$36,065.48

280

HORIZONTAL MANAGER, FOR 19" RACK MOUNTING. (19") WIDE. ONE RACK UNIT. WITH BLACK ALUMINUM BASE. MANAGEMENT ELEMENTS WITH REMOVABLE COVER AND MULTIPLE SLOTS FOR CABLE OUTLETS. PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERING, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

18.00

$4,737.28

$85,271.04

281

PVCANTIFLAMA FRONT PANEL, WITH TWO MODULES, TWO CATEGORY 6A RJ-45 JACKS FOR VOICE-IP INTEGRATION, SYSTIMAX BRAND. IN A SINGLE STANDARD BOX AND/OR REGISTRATION OF 10X10X3.8cm AND 12X12X5.5cm. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PACK.

16.00

$505.44

$8,087.04

282

PVCANTIFLAMA FRONT PANEL, WITH TWO MODULES, CATEGORY 6A RJ-45 JACKS FOR A VOICE-IP SERVICE AND A SERVICE IN PREPARATION (PREP.), SYSTIMAX BRAND, IN SINGLE STANDARD BOX/ OR REGISTRATION OF 10X10X3.8cm AND 12X12X5.5cm. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PACK.

48.00

$360.87

$17,321.76

283

PVCANTIFLAMA FRONT PANEL, WITH A MODULE, A CATEGORY 6A RJ-45 JACK FOR VOICE-IP, SYSTIMAX BRAND. IN A SINGLE STANDARD BOX AND/OR REGISTRATION OF 10X10X3.8cm AND 12X12X5.5cm. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND ALL ITEMS ARIOSPARASUCORCERT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PACK.

7.00

$402.18

$2,815.26

284

48-PORT HIGH-DENSITY PATCH PANEL RJ-45 CAT 6A TYPE, DIMENSIONS: 482.60mm WIDE BY 88.90mm HIGH, TWO RACK UNIT BY 40.6mm . DEEP. RJ-45 CATEGORY 6A CONNECTORS AND WITH MECHANICAL FINISHES, PANEL WITH 8 MODULES OF 6 PORTS TYPE RJ-45 CATEGORY 6A THAT MEETS THE COMPONENT SPECIFICATIONS FOR CATEGORY 6A. TESTED AND VERIFIED BY ETL.UL.CSA OR A RECOGNIZED LABORATORY FOR WIRING REGULATIONS AND STANDARDS.MODULAR CONTACTS OF DOUBLE REACTANCE MATRIX WITH INTEGRATED WIRING ORGANIZERS FOR DISTRIBUTION OF Vo.IP-DATA SERVICES, BRAND: SYSTIMAX, MODEL: 360-IRP-1100-E-GS 3-2U -48.THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

5.00

$5,957.08

$29,785.40

285

FIBER-OPTIC PATCH PANEL. FOR MOUNTING IN A STANDARD RACK 482.60mm WIDTH WITH CABLE ENTRY ON THE SIDES, BACK AND TOP WITH PROTECTORS, INTERNAL ORGANIZERS TO MAINTAIN THE RADIUS OF BEND AND HOLD THE RELEX CEDENTEDELCABLE.FOLDING AND REMOVABLE REAR COVER, REMOVABLE UPPER PANELS, FRONT PROTECTOR TO MAINTAIN THE RADIUS OF BENDING AND CABLE PROTECTION. FRONT SLIDING TRAY. FOLDING DOOR WITH PLEXIGLAS WINDOW AND SHEET WITH KEY. WITH SPACE FOR ASSEMBLY OF SINGLE OR DOUBLE MODULES WITH FIBER ADAPTERS LC DUPLEX TERMINATION OF UP TO 48 STRAPPING FIBERS AND FOR 08 INITIAL STRAPPING FIBERS OF 482.60mm. WIDE BY 355.60mm. DEEP BY 44.45mm. HIGH, ONE RACK UNIT, TESTED AND VERIFIED BY RETL FOR BACK BONE LINKS, BRAND: SYSTIMAX. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

2.00

$8,629.09

$17,258.18

TOTAL WIRING ACCESSORIES

$196,604.16

NETWORK COMPUTER

286

ACCESS POINT (POINT OF ACCESS) ALLIED TELESIS BRAND MODEL AT-TQ4600. THE ACCESSPOINT DEVICE (AP) TO MANAGE WIRELESS NETWORKS MUST BE ENTERPRISE CLASS HANDLING RADIO OPERATING IN BOTH FREQUENCY BANDS: 2.4 GHZ AND 5 GHZ. IT SHOULD BE WIDELY COMPATIBLE WITH IEEE 802.11AC STANDARDS, BE MANAGEABLE, HANDLE AN 802.3AF ETHERNETPOE PORT AND HANDLE HIGH SECURITY SERVICES THROUGH ADVANCED ENCRYPTION (AES/CCMP). THE AP SHOULD HANDLE AUTHENTIFICATION IN THE STANDARDS: WPA/WPA2, WEP AND TKIP, MAC ADDRESS FILTERING, RADIUS ACCESS CONTROL WITH EAP AND PEAP. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

7.00

$17,691.78

$123,842.46

287

48PORT MODULAR SWITCH GIGABIT PoE 10/100/1000BASE-T WITH CONNECTORS (RJ-45) 2 PORTS1000BASE-X(SFP)COMBO,2 PORTS 10 GIGABIT (XFP) PLUS 1 HIGH-SPEED EXPANSION SLOT FOR STACKING, VERSATILE AND SCALABLE SWITCHING FOR HIGH SECURITY AND CONFIGURABLE INTELLIGENT NETWORKS, MUST COMBINE AN ​​ADVANCED LAYER 3 IPv4 SETTING AND IPv6 INTELLIGENT ROUTING, WITH HARDWARE DEVELOPMENT CAPABILITY IPv6 WIRED UNITS FOR DIRECT NETWORK TESTING. SHOULD BE EASILY STACKED UP TO 8 UNITS VIA BACK-OF-SHELF CONNECTORS AT 10 Gbps BANDWIDTH BETWEEN THEM. THE STACKING SHOULD BE VIA EXPANSION MODULES ON THE BACK. IT SHOULD BE INCORPORATED INTO THE ALLIEDWAREPLUS OPERATING SYSTEM, USING A CLI, HTTP, or SNMP COMMAND LINE INTERFACE, TO FACILITATE ITS ADMINISTRATION. WITH THE FOLLOWING CHARACTERISTICS: STACKING OF UP TO 8 SWITCHES USING CX4 CONNECTORS, IPv6 ROUTING, FACTORY SWITCHING 92 UP TO 184 Gbps, EXTENSIVE TRAFFIC CLASSIFICATION FOR ACLs AND QoS, 1+1 REDUNDANCY BY MEANS OF EXTERNAL FRAME FOR PSUs, SUPPORT OF DOUBLE POWER SUPPLY, ONLINE EXCHANGE OF FAN MODULES, COMPLETE ENVIRONMENTAL MONITORING OF PSUs, FANS, TEMPERATURE AND VOLTAGE, SUPPORT OF 4096 VLANs, DYNAMIC AND PRIVATE VLANs, DUAL-DIAL VLANs, PRIVATE VLANs, SECURITY AND PORT ISOLATION FOR MULTIPLE USERS ON SAME VLAN, QoS-BASED POLICIES, 8 QoS QUEUES PER PORT, RENDERABLE CAPABILITY TO IMPROVE ANY NETWORK SCHEME WITH QoS, LOW LATENCY IN SWITCHING, ESSENTIAL FOR VOIP AND TIMETABLE APPLICATIONS OUT-OF-BAND MANAGEMENT ETHERNET PORT AND CONSO MANAGEMENT PORT THE MEMORY CARD SLOT FOR COPYING, CONFIGURATION AND BACKUP TO OTHER UNITS, WITH EXPANSION MODULE. WITH ALLIEDWARE PLUS OPERATING SYSTEM VERSION 5.4.1. DIMENSIONS OF 440mm. LONG X 420mm. WIDE X 44mm. HIGH, TO BE INSTALLED IN A RACK UNIT, POWER SUPPLY 100 TO 240 VAC, 47 TO 63Hz, POWER CONSUMPTION 930-1034 WATTS (UPPER W/PoE+) OPERATING TEMPERATURE BETWEEN 0°C-+40°C, WORKING RELATIVE HUMIDITY 5-90% AND MUST COMPLY WITH THE STANDARDS MORE REGULATORY: UL60950-1, CAN/CSA-C22.2 No.-60950-1-03, EN60950,EN60825-1,AS/NZS60950.1CERTIFICATIONSUL,cUL, TUV ALLIEDTELESIS BRAND, MODEL x510-52GPX-10 SIMILAR OR EQUIVALENT IN CHARACTERISTICS AND QUALITY. 1 METER LENGTH OF STACKING CABLE, MODEL AT-STACKXG/1-00 1 METER LENGTH SPF+ DIRECT CONNECTION CABLE, MODEL AT-SP10TW1 SPF+10GbE MODULE SHORT RUN 850 nm, 300 METERS WITH MMF, MODEL AT-SP10SR SPF1 MODULES 000Mbps, 1000SxGbMULTIMODE FOR 850 nm FIBER UP TO 550 METERS, MODEL AT-SPSX, ADDITIONAL 800W AND POWER SUPPLYPoE+, MODEL AT-PWR800-10. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGES, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION OF THE AGREEMENT WITH THE MANUFACTURER'S MANUALS."

PC.

4.00

$12,782.77

$51,131.08

288

"ALLIEDTELESIS BRAND BLADE SWITCH, MODEL SBX8112 IS AN INDUSTRY-LEADING MODULAR SWITCH THAT INCORPORATES 10 SERVICE CARD SLOTS AND 2 DEDICATED SLOTS FOR REDUNDANT CONTROLLER CARDS OFFERING EACH OTHER GOING A NEW GENERATION HIGH PERFORMANCE.

THE SWITCHBLADE OFFERS VERSATILE AND SCALABLE SWITCHING SOLUTIONS FOR HIGH SECURITY AND INTELLIGENT ENTERPRISE NETWORKS HIGHLY CONFIGURABLE AND SPACES ONLY 7 RACK UNITS, COMBINES AN ADVANCED LAYER 3 IPV4 SETUP AND IPV6 INTELLIGENT ROUTING, WITH HARDWARE CAPABILITY WIRED SPEEDS IN IPV6 FOR DIRECT ENLARED TESTS. IT HAS THE CAPACITY OF OFFERING 10/100/1000 PORTS WITH POE+, GIGABITSFPY PORTS, AND OFFERS 10GBPS BANDWIDTH SERVICE CARDS. IT INCORPORATES THE ALLIEDWAREPLUS OPERATING SYSTEM, USING A CLI, HTTP OR SNMP COMMAND LINE INTERFACE, MAKING ITS MANAGEMENT EVEN MORE EASY

FEATURES:

IPV6 ROUTING OPTION.

800 GBPS FACTORY SWITCHING.

CLASSIFICATION OF LARGE TRAFFIC FOR ACLS AND QOS. 1+1 REDUNDANCY THROUGH THE EXTERNAL FRAME FOR PSU PLUS POE

DOUBLE POWER SUPPLY SUPPORT.

ONLINE EXCHANGE OF VENTILATION MODULES.

COMPLETE ENVIRONMENTAL MONITORING OF THE PSUS, FANS, TEMPERATURE AND VOLTAGE

SUPPORTS 4096 VLANS, DYNAMIC AND PRIVATE VLANS, DUAL DIAL VLANS.

PRIVATE VLANS, SECURITY AND PORT ISOLATION FOR SEVERAL CLIENTS ON THE SAME VLAN. POLICIES BASED ON QOS, 8 QOS QUEUES PER PORT.

RESET CAPABILITY TO IMPROVE ANY NETWORK SCHEME WITH QOS.

LOW-ATTENCYSWITCHING, ESSENTIAL FOR VOIP AND REAL-TIME APPLICATIONS. OUT-OF-BAND MANAGEMENT ETHERNET PORT AND CONSOLE MANAGEMENT PORT.

SD MEMORY CARD SLOT, FOR COPYING, CONFIGURATION AND BACKUP TO OTHER UNITS.

WITH4CARDSAT-SBX81XS6 (6 X 10GBPS (SFP+) LINE CARD))

SIMILAR OR EQUIVALENT IN CHARACTERISTICS AND QUALITY.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS.

PC.

1.00

$183,285.72

$183,285.72

289

MULTIPROTOCOL ROUTER. ALLIEDTELESIS BRAND, MODEL AT-AR750S. HIGH SECURITY ROUTER WITH CAPACITY TO CREATE VPN'S BASED ON IPSEC CLIENTS. PROVIDES HIGH SECURITY OVER VPN MANAGING SERVICES SUCH AS: ENCRYPTION, FIREWALL, NAT, QOS AND IPSECVPN. ITS ADMINISTRATION IS COMPATIBLE WITH SNMP AND HANDLES CLI (COMMANDLINEINTERFACE) AND GUI (GRAPHICALUSER INTERFACE) STANDARDS. ROUTERS HANDLE QOS WITH DYNAMIC IDENTIFICATION AND HIGH PRIORITY FOR VOICE, VIDEO AND APPLICATION TRAFFIC, ALLOWING AN APPROPRIATE LEVEL OF SERVICE AND AVOIDING CONGESTION ON THE NETWORK. ROUTER LAQOS ALLOWS DATA TRAFFIC, VIDEO AND VIDEO TO OBTAIN AN INDIVIDUAL IPSEC TUNNEL FOR EACH OF THE TRAFFIC THAT IS TRANSPORTING. THE ROUTERAT-AR750S HAS: 2 PUERTOS.WAN10/100BT, 5 LAN PORTS. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS.

PC.

1.00

$23,375.49

$23,375.49

TOTAL TEAMS NETWORK

$381,634.75

SERVERS

290

"IP COMMUNICATIONS SERVER BRAND MITEL, MODEL ICP-3300 MXe. CONNECTED TO A LAN, THE COMMUNICATIONS SERVER PROVIDES FULLY FUNCTIONAL CALL CONTROL SERVICES FROM 16 IP PHONES UP TO 1500 IP'S (CAN CREATE A MAX IMODE 5000) IP SERVER SUPPORTS ENHANCED IP NETWORKS SUCH AS: T38 FAX OVER IP (FOIP) OVER IP NETWORKING AND SIP TRUNK, HAS THE CAPACITY TO HANDLE 192 E2T SWITCHING CHANNELS, SCALING IN ACD SOLUTIONS, INTEGRATED DIRECTORY SCALABLE UP TO 65,000 TELEPHONES, WIRELESS WI-FI AND DECT PHONES, 192 COMPRESSION CHANNELS G.729 AND WLAN AND GIGAETHERNET CONNECTION MODULES. THIS FULLY FUNCTIONAL CONTEXT INCLUDES ALL THE SERVICES AND FUNCTIONALITIES ASSOCIATED WITH A TRADITIONAL PBX SUCH AS MULTIPLE LEVELS OF CALL ROUTING, MESSAGES ON HOLD, ADVISORY MESSAGES, CONFERENCE CALLS, CALLS DIGOSDE ACCOUNT, PROHIBITION OF CALLS, LESS COST ROUTING, NIGHT SERVICE, ETC. IN INFRASTRUCTURE OF EXISTING LAN AND WAN NETWORKS, THE IP COMMUNICATIONS SERVER IS DESIGNED TO MAXIMIZE SUCH NETWORKS, USING ITS SWITCHES INFRASTRUCTURE TO PROVIDE VOICE SERVICES. THE ICP 3300 SYSTEM SUPPORTS THE 802.1P/Q STANDARD FOR VOICE PRIORITIZATION AND PROVIDES DHCP SERVICES, AND WHILE CERTAIN NETWORK ENGINEERING MAY BE REQUIRED, THE IP COMMUNICATIONS SERVER PROVIDES:

ONE-WAY LAN DELAY: LESS THAN 80MS. JITTER/JITTER (DELAY VARIATION): LESS THAN 30 MS. PACKAGE LOSS: LESS THAN 1%. CONTROL PORTS: 3 SERIAL, 2 10/100/1000, 4STACKCIM, 4 DUAL STACK F.O. VoIP SWITCH: 1 WAN/FIREWALL PORT POWER SUPPLY: 90-264VAC/47-63Hz. MAXIMUM POWER CONSUMPTION: 250W. HEAT DISSIPATION: 750BTU/Hr. CHASSIS: TO BE MOUNTED IN A 19" RACK, OCCUPYING 2 RACK UNITS (UR). HEIGHT DIMENSIONS: 8.90cm. WIDTH: 45.10cm. DEPTH: 51.40cm. MAXIMUM WEIGHT: 12.70 Kg.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS.

PC.

1.00

$92,512.83

$92,512.83

291

"NETWORK SERVICES UNIT BRAND MITEL MODEL NSU R2

THE NSU UNIT PROVIDES CONNECTIVITY SUPPORT FOR E1`S DIGITAL TRUNKS. THIS MODULE IS DUAL WHICH ALLOWS US TO MANAGE 2 E1`S (60 DIGITAL TRKLS) IN EACH NSU MODULE. THE PROTOCOLS THAT HANDLE ARE THE FOLLOWING: T1 CAS (T1/D4): DIGITAL E&M, DIGITALCO, DIGITALDID, T1CSS RDSIDE PRIMARY SPEED, XNET THROUGH PRI, E1 WITH Q.SIG, MSDN/DPNSSYR2 MODIF.LAUNIDADNSUSE CONNECTS TO THE ICP 3300 CONTROLLER THROUGH A FIBER OPTIC CABLE WITH ST CONNECTORS.

ELECTRICAL SUPPLY: 90-264 VAC/63-67Hz.

MAXIMUM POWER CONSUMPTION: 30W.

HEAT DISSIPATION: 60 BTU/Hr.

CHASSIS: TO BE MOUNTED IN A 19" RACK, OCCUPYING 1 RACK UNIT (UR). WITH HEIGHT DIMENSIONS: 4.45cm. WIDTH: 45.10cm. DEPTH: 39.40cm.

MAXIMUM WEIGHT: 4.27 Kg.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS.

PC.

1.00

$24,032.50

$24,032.50

292

"BRAND MARCAMITEL ANALOG SERVICES UNIT MODEL ASU II. THE ASU II PROVIDES CONNECTIVITY SUPPORT FOR ANALOGUE TRAIN LINES, FAX MACHINES, MODEMS AND OTHER ANALOG DEVICES. THEY CAN BE CONNECTED TO THIS UNIT FROM THE BACK SIDE TWO TYPES OF MODULES: ONE OFFERS: 4 ANALOGUE LINES + 12 ANALOGUE EXTENSION PORTS, THE OTHER OFFERS 24 ANALOGUE EXTENSION PORTS, GIVING A TOTAL PER UNIT TO SUII: 8 ANALOGUE LINES AND 24 ANALOGUE EXTENSIONS OR 48 ANALOGUE EXTENSIONS RESPECTIVELY POWER SUPPLY: 90-264VAC/47-63Hz MAXIMUM POWER CONSUMPTION: 125W HEAT DISSIPATION :260BTU/Hr.CHASIS:TO BE MOUNTED IN A 19"" RACK, OCCUPYING 2RACK UNITS(UR). WITH DIMENSIONS HEIGHT: 8.40cm. WIDTH: 44.20cm.DEPTH:33.80cm.MAXIMUM WEIGHT:6.40Kg.THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION , AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS.

PC

1.00

$24,341.76

$24,341.76

293

HP BRAND SERVER, PROLIANT SERIES MODEL DL380 G9 WITH THE FOLLOWING CHARACTERISTICS: PROCESSOR: 1 INTEL XENON E5-2609 V4 PROCESSOR WITH 8 CORE, 1 SPEED .7GHZ.

RAM MEMORY: 256 GB DDR4. ROM MEMORY: NO HARD DRIVE INCLUDED WITH THE FOLLOWING FEATURES: * 180 TB SATA (12 + 3 x 12 TB) HOT-PLAY ETHERNET TECHNOLOGY: 2 GIGABITETHERNET CARDS VIDEO CARD (GRAPHICS): MATROX G200eH2 WITH 16MB POWER SUPPLY ACTION:500WA120/230 V AC. OPERATING SYSTEM: WINDOWS SERVER 2016 STANDARDEDITION CHASSIS: TO BE MOUNTED IN A 19" RACK, OCCUPYING 2 RACK UNITS (2U). WITH HEIGHT DIMENSIONS: 3.4". WIDTH: 17.5". DEPTH: 26.7". EQUIVALENT IN CHARACTERISTICS AND QUALITY. THE PRICE INCLUDES SUPPLY, ASSEMBLY,

PC

1.00

$116,018.32

$116,018.32

294

"5.0KVA LINE UPS WITH 5000VA/4500W OUTPUT POWER CAPACITY. ON-LINE DOUBLE CONVERSION AUTOMATIC BY-PASS FREQUENCY 50/60 TECHNOLOGY Hz. FREQUENCY VOLTAGE 120V. ADJUSTABLE TO 100V./120v/127v.50/60Hz+/-0.5%. SIMILAR OR EQUIVALENT IN QUALITY AND CHARACTERISTICS. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR THEIR CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

2.00

$68,332.48

$136,664.96

295

"BRANDYSTIMAX POWER BAR FOR 19"" TO 23"" RACK MOUNT EIA WITH 6 RECEPTACLES ON THE FRONT AND BACK. RECEPTACLES (CONTACTS) NEMA5-15R15 AMPS./125V. AC 16 AMP/125 VAC SWITCH 15 AMP SKIN PROTECTOR RESETABLE UL CP300 STANDARD

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

2.00

$1,220.90

$2,441.80

TOTAL SERVERS

$396,012.17

TOTAL INST. TELEPHONY AND COMPUTING

$1,006,284.05

12

INST. OF LP GAS

296

SUPPLY AND PLACEMENT OF PIPE FOR GAS.P, TYPE "L" Cu, 13 mm DIAMETER, INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING ,Cu PIPING CONNECTION, CUTS, SANDING, CEMENTING, ALIGNMENT, FREIGHT, HORIZONTAL AND VERTICAL HAULING, MANEUVERS, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY COARSE CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

ML

76.51

$226.86

$17,357.06

297

SUPPLY AND PLACEMENT OF PIPE FOR LP GAS, Cu TYPE "K", 19mm DIAMETER, FOR FILLING LINE, INCLUDES: SUPPLY AND INSTALLATION, MATERIALS AND LABOR ,PLAYING AND FIXING,Cu PIPING CONNECTION, CUTS, SANDING, CEMENTED, ALIGNMENT, FREIGHT, HORIZONTAL AND VERTICAL HAULING, MANEUVERS, STORAGE, SCAFFOLDING, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE WORK AREA AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORK ATIRO LIB RE.

ML

16.74

$661.20

$11,068.49

298

SUPPLY AND PLACEMENT OF.GAS STORAGE TANK. L.P. CHAP. 1,000 LTS. TARE 210 Kg; FULL 227 Kg. DIAMETER = 0.76m; LENGTH 2.64m INCLUDES: FILLING VALVE, GLOBE VALVE, SERVICE AND SAFETY VALVE, AIR JUG, ACME COUPLER, SAFETY VALVE, PRESSURE REGULATOR, SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CONNECTION TO Cu PIPE , CUTS ,SANDPAPER,CEMENTED,ALIGNMENT,FREIGHT,HORIZONTAL AND VERTICAL HAULING,MANEUVERS,STORAGE, TOOL, EQUIPMENT, DAILY COARSE CLEANING OF THE WORK AREA.

PC

1.00

$32,347.66

$32,347.66

299

SUPPLY AND PLACEMENT OF FISHER BRAND REGULATOR MOD. 722-V Q=5.34 m³/hr Pe=1.5 Kg/cm² Ps=17.78gr/cm² INCLUDES: GENERAL QUICK-CLOSING VALVE, SUPPLY AND INSTALLATION, MATERIALS AND LABOR, PLACEMENT AND FIXING, CONNECTION TO Cu PIPE, CUTS, SANDING, FREIGHT, HORIZONTAL HAULING AND VERTICAL, MANEUVERS , STORAGE, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE WORK AREA.

PC

4.00

$1,559.10

$6,236.40

300

SUPPLY AND PLACEMENT OF INST. INCLUDED: DOUBLE CHECK VALVE, GALVANIZED ELBOW, BUSHING REDUCER, GALVANIZED NIPPLE, 19mm GLOBE VALVE, 19mm EXTERNAL ROPE CONNECTOR, 19MM "K" TYPE Cu TUBE

SAL

1.00

$1,574.65

$1,574.65

301

GASLP OUTLET, FOR STOVE, 13mm DIAMETER PIPE BASE. INCLUDES: SUPPLY AND INSTALLATION, LABOR, PLACEMENT AND FIXING, CONNECTION TO Cu PIPE, CUTS, SANDING, FREIGHT, STORAGE, TOOLS, EQUIPMENT, DAILY GROSS CLEANING OF THE WORK AREA.

SAL

4.00

$1,065.47

$4,261.88

302

GASLP OUTLET, FOR G-60 HEATER BASED ON 13mm DIAMETER Cu TUBE, INCLUDES: SUPPLY AND INSTALLATION, LABOR, PLACEMENT AND FIXING, CONNECTION TO Cu PIPE, CUTS, SANDING, FREIGHT, STORAGE, TOOL, EQUIPMENT, DAILY GROSS CLEANING OF THE WORK AREA.

SAL

1.00

$2,094.22

$2,094.22

303

SUPPLY AND PLACEMENT OF 19X19X13MM COPPER REDUCTION TEE. FIG. 111-R, INCLUDES: SUPPLY AND INSTALLATION, LABOR, PLACEMENT AND FIXING, CONNECTION TO CU PIPE, SANDPAPER, TOOL, EQUIPMENT.

PC

1.00

$122.63

$122.63

304

SUPPLY AND PLACEMENT OF A 13mm DIAMETER TEE INCLUDES: SUPPLY AND INSTALLATION, LABOR, PLACEMENT AND FIXING, CONNECTION TO Cu PIPE, SANDPAPER, TOOL, EQUIPMENT,

PC

3.00

$91.39

$274.17

305

SUPPLY AND PLACEMENT OF CODODECAC 90°X19 mm DIAMETER INCLUDES: SUPPLY AND INSTALLATION, LABOR, PLACEMENT AND FIXING, CONNECTION TO Cu PIPE, SANDPAPER, TOOL , EQUIPMENT,

PC

9.00

$80.06

$720.54

306

SUPPLY AND PLACEMENT OF COPPER BEND 90°X13 mm DIAMETER INCLUDES: SUPPLY AND INSTALLATION, LABOR, PLACEMENT AND FIXING, CONNECTION TO Cu PIPE, SANDPAPER, TOOL, EQUIPMENT ,

PC

23.00

$72.65

$1,670.95

307

SUPPLY AND PLACEMENT OF 45°X13 mm DIAMETER COPPER ELBOW INCLUDES: SUPPLY AND INSTALLATION, LABOR, PLACEMENT AND FIXING, CONNECTION TO Cu PIPE, SANDPAPER , TOOL, EQUIPMENT,

PC

1.00

$70.53

$70.53

TOTAL INST. OF LP GAS

$77,799.18

13

INST. FIRE DETECTION

308

"THICK-WALL GALVANIZED CONDUIT PIPE, WITH A DIAMETER OF 21mm, INDICATED BY PLAFOND AND/OMURO WITH CONTRA AND MONITOR IF IT IS FOUND WITH ANY KIND OF RECORD.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

561.40

$93.19

$52,316.87

309

"COPPER CABLEDUPLEX2x16AWG.(THW-LS)CONFORROROROJOTYPEB(FOR INTELLIGENT DETECTORS AND ALARM STATIONS) BRAND BELDEN.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

623.00

$35.81

$22,309.63

310

"COPPER DUPLEX 2x14AWG CABLE. (THW-LS) WITH RED JACKET TYPE B (FOR HORNS WITH STROBE LIGHTS) BRAND BELDEN.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

100.00

$41.10

$4,110.00

311

"INTELLIGENT PHOTOELECTRIC (F) DETECTOR WITH BASE, EST BRAND, SIGA-PS MODEL. INTELLIGENT PHOTOELECTRIC SMOKE DETECTOR. WITH THE FOLLOWING TECHNICAL CHARACTERISTICS: ANALOG MEASUREMENT SENSOR WITH ELECTRONIC ADDRESSING FOR DIGITAL COMMUNICATION WITH CONTROL PANEL , WITH MOUNTING BASE, MEETS THE FOLLOWING CHARACTERISTICS: SEVEN SENSITIVITY LEVELS: WITHIN A RANGE OF 0.67% TO 3.77% PER FOOT OF SMOKE OBSCURING, INDICATED LIGHT SOURCE WITH 2 NON-INFRARED AND PULSING LEDS (GREEN, NORMAL STATE, RED ALARM), RECEIVER PHOTODIOD DESILICON , SENSOR HEAD WITH 360º SMOKE COLLECTION TO OPTIMATE RESPONSE TO THE PRESENCE OF SMOKE FROM ANY DIRECTION; 112mm DIAMETER BY 51mm HIGH AND 20mm DEEP, OPERATING TEMPERATURE RANGE: FROM 0º TO 49ºC, HUMIDITY RANGE: 0 93% RH., RAN AIR SPEED GO: FROM 0 TO 25.39m/sec., OPERATING VOLTAGE: 15.2 TO 19.95 VDC (NOMINAL 19 VDC) DESIGNED IN WHITE PLASTIC (HIGH IMPACT POLYMER), AND THE FACILITY OF MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION OF AGREEMENT WITH THE MANUFACTURER'S MANUALS."D TO BE INSTALLED IN UP TO 4 TYPES OF DIFFERENT SOCKETS: STANDARD, ISOLATING, RELAY AND AUDIBLE. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

90.00

$1,511.12

$136,000.80

312

"INTELLIGENT MULTI-TECHNOLOGY (F/T) DETECTOR WITH EST BRAND BASE, SIGA-PHS MODEL. INTELLIGENT PHOTOELECTRIC-THERMAL MULTI-TECHNOLOGY SMOKE DETECTOR. WITH THE FOLLOWING TECHNICAL CHARACTERISTICS:

INTELLIGENT MULTIPLE DETECTOR (F/T). DOUBLE SENSOR ANALOG MEASUREMENT WITH ELECTRONIC ADDRESSING FOR DIGITAL COMMUNICATION WITH THE CONTROL PANEL, DOUBLE SENSOR ADAPTS TO LONG-TERM CHANGES CAUSED BY DUST, HUMIDITY, AGING. ELIMINATE FALSE ALARM. MULTI-SENSOR THAT COMBINES A TEMPERATURE SENSOR AND A PHOTOELECTRIC SENSOR IN ONE SOLO AND ADDS A CRITICAL DIMENSION: TIME. MEETS THE FOLLOWING CHARACTERISTICS: FIVE LEVELS OF SENSITIVITY: WITHIN A RANGE OF 0.67% TO 3.77% PER FOOT OF SMOKE OBSCUENTATION, INDICATED LIGHT SOURCE WITH 2 NON-INFRARED AND PULSING LED'S (GREEN NORMAL STATE, RED ALARM), SILICONE RECEIVING PHOTODIOD, SENSOR HEAD WITH 360° CAPTURE OF SMOKE FOR OPTIMAL RESPONSE TO THE PRESENCE OF SMOKE FROM ANY DIRECTION.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

16.00

$2,182.36

$34,917.76

313

"INTELLIGENT MULTI-TECHNOLOGY (F/I/T) DETECTOR WITH BASED EST BRAND, SIGA-IPHS MODEL. MULTI-TECHNOLOGY INTELLIGENT SMOKE DETECTOR TYPE PHOTOELECTRIC IONIC THERMAL AND THERMAL WITH RATE OF INCREASE. WITH THE FOLLOWING CHARACTERISTICS TECHNICAL ETHICS :

INTELLIGENT MULTIPLE DETECTOR (F/I/T): MULTISENSOR ANALOG MEASUREMENT WITH ELECTRONIC ADDRESSING FOR DIGITAL COMMUNICATION WITH THE CONTROL PANEL, MULTISENSOR ADAPTS TO LONG-TERM CHANGES CAUSED BY DUST, HUMIDITY, AGING, EVEN COMPENSATE FOR SMALL AMOUNTS OF SMOKE IN NORMAL ENVIRONMENT. IT DISTINGUISHES BETWEEN A BENIGN DUST PLOW OF PLASTER AND THE POTENTIAL DISASTER OF A SMOKING CUSHIONED ARMCHAIR. ELIMINATES FALSE ALARM. MULTI-SENSOR COMBINES TEMPERATURE, IONIZATION AND PHOTOELECTRIC SENSORS INTO ONE, ADDING A CRITICAL DIMENSION TO THEM.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

17.00

$4,721.41

$80,263.97

314

"EST BRAND DOUBLE ACTION MANUAL ALARM STATION, SIGA-278 MODEL.- DOUBLE ACTION MANUAL STATION, SINGLE STAGE. WITH THE FOLLOWING TECHNICAL CHARACTERISTICS:

MANUAL ALARM STATION, SINGLE STAGE DOUBLE ACTION, ADDRESSED ELECTRONICALLY FOR DIGITAL DATA COMMUNICATION THROUGH A SINGLE PAIR OF WIRES, 18 OR 16 AWG GAUGE. UP TO 3,048M. AWAY FROM THE CONTROL PANEL. INDICATED LIGHT SOURCE WITH 2 NON-INFRARED AND PUSHING LEDS (GREEN NORMAL STATE, RED ALARM). OPERATING VOLTAGE OF 19 VDC NOMINAL. OPERATING TEMPERATURE RANGE, FROM 0° TO 49° C., HUMIDITY RANGE FROM 0% TO 93%, WITH NEMA 2 ENCLOSURE, FOR MINIMUM DUST INFILTRATION, MANUFACTURED IN HIGH-IMPACT RESISTANT POLYCARBONATE MATERIAL FOR EQUAL WALL INSTALLATION ENTITY OR SEMI-RECESSED IN BOX 4"" WITH MINIMUM DEPTH OF 54 MM. H=1.50m SNPT.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

5.00

$4,721.41

$23,607.05

315

"AUDIO/VISUAL ALARM BRAND EST, MODELOGCFR-S7VMB HORN/STROBE. WITH THE FOLLOWING TECHNICAL CHARACTERISTICS: AUDIO/VISUAL ALARM FOR FIRE NOTIFICATION BY VOICE EVACUATION, WITH STROBE LIGHT INTEGRATED MULTICANDELAS CONFIGURABLE FROM 15, 30, 75 OR 95 CANDLES OF INTENSITY AND SPEAKER WITH RESPONSE FREQUENCY OF 250- 13,000 HZ. POWER OUTPUT FOR SPEAKER CONFIGURABLE AT ¼, ½, 1, OR 2 WATTS - AMBIENT OPERATING TEMPERATURE OF 0-49°C AND 0- 93% RELATIVE HUMIDITY, CEILING INSTALLED UV STABILIZED TEXTURED PLASTIC CABINET UL 94V-0 FLAME RETARDANT CLASSIFICATION, RED WITH WHITE LETTERS CLEAR POLYCARBONATE LENS, 70VRMS OPERATING VOLTAGE, MOUNTS IN STANDARD 4" BOX. SYNC MODULE REQUIRED SMART ACTION FOLLOW -CC1S FOR ACTIVATION.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

5.00

$2,246.90

$11,234.50

316

"STD BRAND FAULT ISOLATOR MODULE

BASEY/O FAULT CONTROL ISOLATOR MODULE. THEY WILL BE PLACED AT DIFFERENT POINTS OF THE INTELLIGENT LOOP (SLC) OF CIRCUIT ""A"" BETWEEN GROUPS OF 25 TO 30 INTELLIGENT DEVICES AND ITS MAIN FUNCTION ISOLATES SHORTED SECTIONS AND ALLOWS OTHER SECTIONS TO BE CONDUCTED CONTINUE WITH ITS NORMAL OPERATION. THIS BASE AND/OR ISOLATOR MODULE DOES NOT REQUIRE REGISTRATION IT GOES IN THE SAME AS THE DETECTOR.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

7.00

$1,122.76

$7,859.32

317

"END OF LINE MODULES BRAND EST.

THIS RESISTANCE, FINDLINE, IS INSTALLED IN THE HORN WITH STROBE LIGHT, WHERE THE 24 VDC POWER SUPPLY WIRING ENDS.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

3.00

$3,805.28

$11,415.84

318

"CENTRAL INTELLIGENT CONTROL PANEL FOR FIRE DETECTION. EST.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$30,510.64

$30,510.64

319

"6 AMP AUXILIARY POWER SOURCE EST. BRAND

AUXILIARY POWER SOURCE:

16 SELECTABLE OUTPUT ROUTES

INPUT POWER: 120 VAC/50/60HZ. OUTPUT SWITCH: 12 VDC OR 24 VDC SELECTABLE.

CHARGER SOURCE

AUTOMATIC BATTERY CHARGING BREAKER SUPERVISED WHEN THE AC FAILS (ZERO VOLTAGE DROP)

AC. INPUT INDICATORS AND THE LED OUTPUT OF THE DC.

AC FAILURE SUPERVISION OF CONTACTS (OF FORM "C")

LOW CONTACT BATTERY SUPERVISION (FORM "C")

SHORT CIRCUIT AND THERMAL OVERLOAD PROTECTION.

METAL CABINET.

24VOLT TRANSFORMER85VA

12 VOLTS 6 AMP BATTERY, SEALED HOUR, LEAD GEL OR ACID TYPE.

WITH ON/OFF THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$12,503.57

$12,503.57

TOTAL INST. FIRE DETECTION

$427,049.95

14

INST. ACCESS CONTROL

320

"THICK-WALL GALVANIZED CONDUIT PIPE, WITH A DIAMETER OF 16mm, INDICATED BY PLAFOND AND/OMURO WITH CONTRA AND MONITOR IF IT IS FOUND WITH ANY KIND OF RECORD.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

5.60

$77.78

$435.57

321

"THICK-WALL GALVANIZED CONDUIT PIPE, WITH A DIAMETER OF 21mm, INDICATED BY PLAFOND AND/OMURO WITH CONTRA AND MONITOR IF IT IS FOUND WITH ANY KIND OF RECORD.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

3.70

$93.19

$344.80

322

"THICK-WALL GALVANIZED CONDUIT PIPE, WITH A DIAMETER OF 27mm, INDICATED BY PLAFOND AND/OMURO WITH CONTRA AND MONITOR IF IT IS FOUND WITH ANY KIND OF RECORD.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

12.60

$124.88

$1,573.49

323

"2x18AWG POLARIZED CABLE, BELDEN BRAND. CABLE FOR THE LINKS OF THE CONTROLLERS TO THE RELEASE BUTTONS AND MAGNETIC CONTACTS (ELECTROMAGNETS). THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL LIKE MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

63.80

$28.56

$1,822.13

324

"SHIELDED CABLE 6x22 AWG, BELDEN BRAND. THE LINKS OF THE CONTROLLERS TO THE CARD READERS. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

32.80

$61.62

$2,021.14

325

"125KHz PROXIMITY READER FOR SMART CARDS WITH AUDIBLE TONE GENERATOR WITH ACCESS NOTIFICATION OR ACCESS DENIAL, READING RANGE OF 10cm TO 15cm. DIGITAL RADIO FREQUENCY IDENTIFICATION TECHNOLOGY TAMPER PROTECTED, WATERPROOF CONSTRUCTION, HIGHLY DURABLE FOR LONG USE AND RELIABLE OPERATION EVEN IN SEVERE ENVIRONMENTS LIFETIME WARRANTY AGAINST MATERIAL DEFECTS 12 VDC INPUT VOLTAGE 40 TYPICAL CURRENT MAXIMUM 80mA MAXIMUM WIRING DISTANCE 152 METERS WITH 6x22AWG CABLE. APPROVED BY RIC, FCC, CEY UL, INSTALLED IN A 10x10x3.8cm JUNCTION BOX, KEYSCAN BRAND, K-PROX2 MODEL.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$3,312.31

$3,312.31

326

"INTERIOR DOOR RELEASE BUTTON INSTALLED IN A 10x10x3.8cm JUNCTION BOX.h=1.20m. MOUNTED ON A STAINLESS STEEL PLATE, WITH THE LEGENDS SERIGRAPHED ON THE PLATE""EXIT""Y" "EXIT"". MARCASECO-LARM, MODEL SD-7201GCEPE1Q.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$963.58

$963.58

327

"SINGLE 600-POUND (272.1Kg) ELECTROMAGNET FOR INTERIOR DOOR LOCKING, INSTALLED IN THE DOOR FRAME WITH AN OPENING TIME OF (0-110 SECONDS) AND A SELECTABLE POWER SUPPLY OF 12 OR 24 VCD WITH ELECTROMAGNETIC CLOSING AND SENSOR (SCSYDSS), A NATURAL ALUMINUM BASE (Z/L) MUST BE CONSIDERED FOR FIXING TO WOODEN DOORS, ALUMINUM PROFILE AND/GLASS DOORS, SECO-LARM BRAND, MODEL E-941SA-600Q.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$3,056.58

$3,056.58

328

"INTELLIGENT CONTROLLER FOR THE ACCESS CONTROL SYSTEM WITH THE CAPACITY OF MANAGING 1 TO 4 DOORS WITH A READING-BUTTON COMBINATION OR 2 DOORS WITH A READING-READING COMBINATION. 4 INPUTS FOR MAGNETIC, ELECTROPLATE OR CONTACTOTYPE CONTACTS DRY. IT HAS LED STATUS INDICATORS, DUAL PROCESSOR WITH EXPANDED FLASH MEMORY (INCLUDED), POWER FAULT OUTPUT, MONITOR INPUT FOR EACH FLOOR, 4 SUPERVISED INPUTS FOR REQUEST TO EXIT RELEASED BUTTONS (RTE), 4 DOOR CONTACT INPUTS, 8 SUPERVISED AUXILIARY INPUTS. RELAY AUXILIARY DAS 4 AUXILIARY OUTPUTS FOR EXPANSION RELEASES, 64 I/O OUTPUTS, 4 DOOR RELAY OUTPUTS, UP TO 45,000 CREDENTIALS AND/OR CARDS, 256 TIME ZONES, 512 TIMES, 511 GROUP LEVELS, 64 HOLIDAYS, LAN NETWORK CONNECTIVITY WITH ETHERNET PORT (OPTIONAL), SERIAL COMMUNICATION, GLOBAL INTEGRATION UP TO 6000 TRANSACTIONS RETAINED IN THE FILE BUFFER, AUTOMATIC TRANSFER PROTOCOL LOADS THE FILE BUFFER WHEN COMMUNICATION IS RESETTED AFTER AN INTERRUPTION, MORE THAN 2000 USERS. INTELLIGENT CONTROLLER, KEYSCAN BRAND, MODEL CA4500.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$90,561.90

$90,561.90

329

"LOW-VOLTAGE TRANSFORMER FOR INTELLIGENT ACCESS CONTROLLER, PROVIDES AN INPUT POWER SUPPLY OF 120VAC OR 240VAC 50/60Hz AND OUTPUT VOLTAGE OF 16VAC 6.5 AMPS, 100VA, SELECTABLE INPUT VOLTAGE, SELECTABLE VOLTAGE OUTPUT, SHIELDED COILS FOR THE REDUCTION OF ELECTROMAGNETIC INTERFERENCE, ENFORCER BRAND, ST-UV16-W100Q MODEL.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$557.86

$557.86

330

"8-WAY AUXILIARY POWER SUPPLY WITH SELECTABLE OUTPUTS CLASS 2 LIMITED POWER WITH 2.5 AMPERE OUTPUT PROTECTION. 115VAC 60Hz INPUT POWER. SELECTABLE 12VDC OR 24VDC OUTPUT SWITCH, COR SUPPLY OF 6 AMPS CONTINUOUS , ELECTRONIC REGULATOR AND OUTLET FILTER, PROTECTION AGAINST SHORT CIRCUIT AND TERMINAL OVERLOAD, SEALED GELY/ACID ACID BATTERY WITH MAXIMUM LOAD OF 0.7 AMPS, AUTOMATIC ACTION SWITCH WHEN POWER SUPPLY FAILS, WITH INTEGRATED TERMINAL FOR ITS CHARGE. SUPERVISION OF POWER FAILURE ELECTRICAL ACTION, LOW BATTERY AND BATTERY PRESENCE (FROM ""C"" TYPE CONTACTS) , VISUAL LED INDICATORS FOR POWER INPUT AND OUTLET, MOUNTED IN A GRAY METAL CABINET TO BE MOUNTED ON A WALL h=1.00m, ALTRONIX BRAND, MODEL AL600ULPD8CB.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$2,215.87

$2,215.87

331

"INDIVIDUAL AND NON-TRANSFERABLE PROXIMITY CARDS WITH ENCODED DATA AND WILL BE MANAGED BY THE SOFTWARE OF THE SYSTEM, ACCORDING TO THE REQUIREMENTS AND NEEDS OF THE UNIT STAFF. THE PROXIMITY CARDS MUST WORK WITH A FRE TRANSMISSION 125KHz QUEEN WITH DATA ENCODING AND 36 BIT KEYS, KEYWSCAN BRAND, MODEL CS125-36.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

200.00

$164.10

$32,820.00

TOTAL INST. ACCESS CONTROL

$139,685.23

15

INST. SOUND

332

"THICK-WALL GALVANIZED CONDUIT PIPE, WITH A DIAMETER OF 16mm, INDICATED BY PLAFOND AND/OMURO WITH CONTRA AND MONITOR IF IT IS FOUND WITH ANY KIND OF RECORD.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

457.50

$77.78

$35,584.35

333

"THICK-WALL GALVANIZED CONDUIT PIPE, WITH A DIAMETER OF 21mm, INDICATED BY PLAFOND AND/OMURO WITH CONTRA AND MONITOR IF IT IS FOUND WITH ANY KIND OF RECORD.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

175.70

$93.19

$16,373.48

334

"POLARIZED DUPLEXPOT-16(2X16) AWG CABLE. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, HAND WORK, TOOL, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

1126.40

$68.98

$77,699.07

335

"COAXIAL CABLE FOR VIDEO CATV-6/UMARCABELDEN. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOL, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

25.00

$31.75

$793.75

336

"RECESS-MOUNTED SPEAKER IN FALSE-PLAFOND BOGEN BRAND, MODEL S810T725PG8W. RECESS-MOUNTED SPEAKER INFALSE-CEILING-LIGHT WITH GRID IN CEILING-LIGHT (FINISH ACCORDING TO THE ENCLOSURE) WITH SPEAKER, RING AND BRIDGE FOR MOUNTING , 2-WAY, POWER IN WATTS OF 4.3, 2, 1, 0.5, 0.25, 0.125 WATTS, VOLTAGE 70VAC, SOUND PRESSURE OF 1W AT 1M, 96DB, SOUND PRESSURE AT NOMINAL POWER OF 98DB, HI-OPERATION SYSTEM IF, 2-WAYS, WITH AN 8-INCH SPEAKER ASSEMBLY, 70V LINE TRANSFORMER, SPEAKER AND DIFFUSER GRID, CAPACITY UP TO 4 WATTS, 10OZ MAGNET, FREQUENCY RESPONSE FROM 70HZ TO 15 KHZ, FOR CEILING-MOUNTED INSTALLATION. PRICE INCLUDES SUPPLY , ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

93.00

$1,034.97

$96,252.21

337

"OUTDOOR-TYPE TRUMPETE, BUILT IN FIBERGLASS OR ALUMINUM, WITH INCORPORATED 15-WATT EXCITER UNIT AND 70 VAC LINE TRANSFORMER WITH MOUNTING ACCESSORIES. BOGEN BRAND, PT15A MODELS. PRICE INCLUDES SUPPLY , ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$4,733.85

$4,733.85

338

"MARKENED VOLUME ATTENUATOR, MODEL AT10, TO BE PLACED ON A PILOT-TYPE PANEL. THE VOLUME ATTENUATOR IS ON AN ELECTRICAL PANEL TO WORK WITH A MAXIMUM POWER OF 10W (AT10A). IN LINES OF 25 OR 70 V. ALLOWS YOU TO ADJUST THE SPEAKER'S VOLUME LEVEL IN YOUR OWN AREA, WITHOUT AFFECTING THE AMPLIFIER'S OUTPUT LEVEL. AND ONE FOR OFF. IT IS WALL-MOUNTED, FACILITATING ITS ACCESS, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE , FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOL, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS." THE PRICE INCLUDES SUPPLY, ASSEMBLY,

PC.

42.00

$864.06

$36,290.52

339

"BRAND DIRECTIONAL MICROPHONE, MODEL HDU250, LOW IMPEDANCE DIRECTIONAL MICROPHONE, WITH NEODYMIUM INSERT AND CONNECTOR FOR AMPLIFIER AND/OR MIXER, FOR LOCAL SPEAKER, CARDIOID TYPE IMPEDANCE AT 250? , ANSWER FREQUENCY 50-18000HZ, SENSITIVITY -72 DB, AND CONNECTOR TYPE

CANON,INTEGRATED SWITCH FOR ON-OFF AND BASE FUNCTION

TO BE INSTALLED ON STAND AND CABIN.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$3,534.24

$3,534.24

340

"MICROPHONE RECEPTACLE WITH FEMALE CONNECTOR, CANNON TYPE, TO BE MOUNTED ON A PILOT PLATE, PEDESTAL FOR FLOOR MICROPHONE, TWO SECTIONS FROM 77cm TO 167cm. PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$1,041.22

$1,041.22

341

"DIGITAL PROCESSOR FOR GENERAL ADVOCATION, BOGEN BRAND, MODEL UTI312. THE DIGITAL PROCESSOR FOR GENERAL ADVOCATION BY ZONES, TWO MUSIC CHANNELS TO SELECT FOR EACH ZONE. ACTIVITY MONITORING BY ZONE. INTEGRATED ALARM TONES AND POSSIBILITY OF INTERCONNECTING WITH EXTERNAL ALARMS OR STARTERS. INCLUDES MICROPHONE FOR GENERAL PAGE AND TELEPHONE INTERFACE LS, GS, STATION PORT OR FOR PAGE. DRY CONTACT FOR ACTIVATION OF EXTERNAL ELEMENTS SUCH AS STROBE IN GENERAL LEVEL OR BY ZONE. CAPACITY FROM 3 TO 12 ZONES IN MODULAR INCREMENTS OF 3. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS." WHAT IS NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$6,300.43

$6,300.43

342

"MODULAR MIXER, MARCABOGEN, MODEL VMIX. 8-BAY INPUT/OUTPUT MODULAR MIXER WITH INDEPENDENT VOLUME CONTROL AND GENERAL CONTROL. TREBLE AND BASS TONE CONTROL. INCLUDES INPUT MODULE FOR MICROPHONE, 2 BALANCED INPUTS AND 1 RELAY OUTPUT 4 PRIORITY LEVELS SIGNAL LEVEL LIGHT INDICATOR DISTORTION LESS THAN 0.01% 120 VAC POWER SUPPLY +- 10% PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGES, LABOR, TOOL, EQUIPMENT, CONNECTORS AND EVERYTHING.

PC.

1.00

$17,559.61

$17,559.61

343

"125WATT BOOSTER AMPLIFIER, BOGEN BRAND, MODEL HTA125. BOOSTER AMPLIFIER. GENERAL AND/OR LOCAL WITH LESS THAN 0.5% OF HARMONIC DISTORTION AT FULL LOAD.OUTPUTS FOR: 4 AND 8 OHMS AND 25OR70VAC LINE.CONTROLS: ON-OFF.INDICATOR AND OVERLOAD PROTECTION.INPUT AND OUTPUT SIGNAL CONNECTION TO MAKE CASCADE IN THE SYSTEMETC.ELECTRICAL POWER SUPPLY 127 VAC AT 60 Hz +/- 10% OS ACCESSORIES PORTING TO RIDE IN RACK OR CABINET CTO.""A"" 125W. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

2.00

$18,878.27

$37,756.54

344

"250WATT BOOSTER AMPLIFIER, MARCABOGEN, MODEL HTA250. BOOSTER AMPLIFIER. GENERAL AND/OR LOCAL WITH LESS THAN 0.5% OF HARMONIC DISTORTION A FULL LOAD OUTPUTS FOR: 4 AND 8 OHMS AND 25 OR 70 VAC LINE CONTROLS: ON-OFF INDICATOR AND OVERLOAD PROTECTION INPUT AND OUTPUT SIGNAL CONNECTION TO CASCADE IN THE SYSTEM ETC. ELECTRICAL POWER SUPPLY 127 VAC AT 60 Hz +/- 10% SUPPORT ACCESSORIES TO RIDE ON FRAME OR CABINET CTO.""B"" 250W. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$29,895.16

$29,895.16

345

"CD PLAYER AND AM/FM RECEIVER, BOGEN (DENON) BRAND, CDR1 MODEL.

FEATURES:

CD,CD-RYCD-RW COMPATIBILITY (INCLUDING MP3 FILES) SCAN, REPEAT, RANDOM PLAY AND PAUSE FUNCTIONS 30 STATION PRESETS: 5 SELECTABLE BANDS (3 FM AND 2 AM) CAN BE PROGRAMMED WITH 6 STATIONS EACH MANUAL TUNING, SEEK FUNCTIONS AUTOMATIC AND PRESET SCAN ADJUSTABLE LOUD CONTOUR AUXA INPUT VIA 1/8" STEREO JACK ON FRONT PANEL PLUG-IN SCREW TERMINAL INPUTS FOR AM/FM ANTENNAS AND SPEAKER OUTPUTS ANTENNA COAXIALTIPOFF INPUT 75OHM 1WAT,8 OHM OUTPUTS RIGHT/LEFT SEPARATE 50 OHM OUTPUTS RIGHT/LEFT MONO OUTPUT 50 OHM ADDITION STANDARD 19-INCH RACK MOUNT (2 RACK SPACES) WITH RK78 RACK MOUNTING KIT, SOLD SEPARATELY 12-HOUR DISPLAY CD DISPLAY SHOWS TIME, LCD TRACK INFORMATION RADIO FREQUENCY ADJUSTABLE BASS AND TREBLE EQUALIZATION SPRESETS: CLASSIC, ROCK, POP AND FLAT THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL LIKE MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$6,550.61

$6,550.61

346

"AM/FM DIGITAL TUNER, BOGEN BRAND, DST1 MODEL.

DIGITAL TUNER WITH PLL SYNTHESIZER CIRCUIT. AM/FM BANDS 60 MEMORIES AND FLUORESCENT ALPHANUMERIC DISPLAY. CONNECTION FOR 75 AND 300 OHM ANTENNA. ELECTRICAL SUPPLY 127 VACA60Hz. SUPPORT ACCESSORIES TO BE MOUNTED ON A RACK OR CABINET. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND ANYTHING REQUIREMENTS FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$6,729.48

$6,729.48

347

"16-ELEMENT FOLDING LOG ANTENNA, STEREN BRAND, ANT-UHF 16/PLEG MODEL, SIMILAR OR EQUIVALENT IN CHARACTERISTICS AND QUALITY OF THE BRAND AND MODEL. 16-ELEMENT FOLDING LOG ANTENNA FOR FRE RECEPTION ACCOUNT AND MODULATED AMPLITUDE (AM-FM) OF 300 OHMS OF IMPEDANCE, WITH COUPLING TRANSFORMER FROM 300 OHM TO 75 OHM, WITH A GAIN OF 6 TO 13 DB IN VHF AND OF 11 TO 15 DBENUHF AND COUNT WITH TYPE F CONNECTOR, FOR OUTDOORS WITH UHF/VHF/FM COVER MADE OF ALUMINUM AND PLASTIC SUPPORTS WITH A 6.00-METER MAST AND WITH 3 RETAINERS FOR ITS CORRECT SUBJECTION AND ANCHORAGE.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$928.87

$928.87

TOTAL INST. SOUND

$378,023.39

16

INST. TELEVISION

348

"THICK-WALL GALVANIZED CONDUIT PIPE, WITH A DIAMETER OF 21mm, INDICATED BY PLAFOND AND/OMUROCONTRA AND MONITOR WHEN FINDING SOME TYPE OF REGISTRATION. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION , AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

171.10

$93.19

$15,944.81

349

"COAXIAL CABLE FOR VIDEO CATV-59/UMARCABELDEN FOR TVs. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS , EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

109.40

$39.24

$4,292.86

350

"COAXIAL CABLE FOR VIDEO CATV-6/UMARCABELDEN FOR ANTENNA. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOL, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

42.60

$31.75

$1,352.55

351

"FRONT PLATE DEP.V.C.ANTIFLAME WITH TWO BNC TYPE STRAIGHT CONNECTORS. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$278.29

$278.29

352

"SIGNAL TERMINAL PLATE FOR TELEVISION WITH TYPE L ADAPTER AND TYPE F CONNECTOR FOR COAXIAL WIRINGRG-59U CALIBER 22 AWG. INPUT AND SERVICE IMPEDANCE 75 OHMS.INSERTION LOSS0 .3 DECIBELS.5-300 Mhz BANDWIDTH.MODEL PAG-70/3.THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR YOUR CORRECTION TA EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

3.00

$427.74

$1,283.22

353

"STEP-THROUGH TELEVISION SIGNAL DISTRIBUTION PLATE WITH TYPE T ADAPTER AND TYPE F CONNECTOR FOR COAXIAL CABLE RG-59U, 22 AWG GAUGE, ADJUSTABLE. INPUT AND SERVICE IMPEDANCE 75 OHMS. INSERTION LOSS 0.3 DECIBELES.BANDWIDTH5-300Mhz.MODELPAG-70/3.THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR YOUR RUN CTA EXECUTION ACCORDING TO THE MANUFACTURER'S MANUALS."

PC.

1.00

$427.74

$427.74

354

"MARCASTEREN SIGNAL SPLITTER, MODEL 202-202. HIGH PERFORMANCE SPLITTER, WITH VOLTAGE PASS THROUGH ALL PORTS AND 2 OUTPUTS FROM 1 GHZ TO PRE CIO INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

2.00

$138.88

$277.76

355

"4KULTRAHDLEDDE43""TELEVISION BRAND XBR-43X800G MODEL, WITH THE FOLLOWING CHARACTERISTICS: BACKLIGHTING: EDGELED. WIDTH/HEIGHT RATIO: 3840 x 2160. ·

4KULTRAHD 108cm(43""),APPROX. 970x570x57mm FRAME DIMMING, DIRECT LED.

X-REALITYPRO4KMOTIONFLOWXR240 Hz Wi-Fi DIRECT,SCREEN MIRRORING. AUDIO OUTPUT POWER 10Wx2 HDMI INPUT: 2 REAR / 2 SIDES: COMPATIBLE WITH MHL AND PC INPUT

COMPOSITE VIDEO: 1 FRONT/1 REAR COMPONENT VIDEO INPUT: 1 BOTTOM USB INPUT: 3 SIDES AUDIO OUTPUT: 1 REAR/HYBRID WITH HEADPHONE OUTPUT DIGITAL AUDIO OUTPUT: 1 REAR. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

5.00

$15,125.58

$75,627.90

356

"STEEL SUPPORT TO ANCHOR TO WALL AND/OR SLAB, IN GRAY COLOR FOR 43-INCH LED TELEVISION. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

5.00

$747.84

$3,739.20

357

"BLU-RAY DISC PLAYER WITH SUPER

Wi-FiMARCASONY,MODELOBDP-S3500,

WITH THE FOLLOWING FEATURES: SUPER SCALER (CINEMAHD PRECISION SCALE)

DEEP COLOR(16bits) 24PTRUE CINEMA NTSC/PAL 24P DVD QUALITY

HDMI (480i/480p/720p/1080i/1080p[60Hz]) COAXIAL BUILT-IN Wi-Fi (2.4GHz) SCREEN SAVER, EASY CONFIGURATION, PHOTOTV HD SAFETY LOCK PARENTAL CONTROL MUSICAL PRESENTATION SLIDES DIRECT TRANSMISSION ECTO , SUBTITLES · BRAVIASYNC · WEB BROWSER · TV SIDEVIEW REMOTE · 1 HDMI OUTPUT (REAR), 1 AUDIOCOAXIAL OUTPUT (REAR), 1 USB INPUT (FRONT), 1 HERNET CONNECTION (REAR) POWER CONSUMPTION: 9.5W

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$2,528.37

$2,528.37

358

"RCA AUDIO/VIDEO CONVERTER(RFMODULATOR) TO""F"-TYPE INPUT""ACCEPTS ANY DEVICE WITH RCA OUTPUT TO CONNECT TO A TV WITH""F-TYPE INPUT"" F"" ONLY ADJUSTS TO CHANNEL 3. WITH BATTERY ELIMINATOR.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$509.66

$509.66

359

"amplifier of the scope of thession. Y 170-216 Mhz. POWER SUPPLY 127 Vac at 60 Hz.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$614.22

$614.22

360

"ANTENNA FOR HIGH DEFINITION HDTV WITH PHILIPS BRAND SIGNAL AMPLIFIER, MODEL MANT940.

HIGH DEFINITION ANTENNA FOR LCD SCREENS TO RECEIVE HDTV AND NORMAL UHF CHANNELS WITH INTEGRATED SIGNAL AMPLIFIER (BOOSTER15DB), WITH A MAXIMUM GAIN OF 470-862 MHZ: 15 DB, WITH 120 VAC / 100 MA POWER SUPPLY. IT SHOULD INCLUDE A POWER ADAPTER AND CONNECTORS, MAST ACCESSORIES AND FITTINGS FOR ITS INSTALLATION.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$851.42

$851.42

TOTAL INST. TELEVISION

$107,728.00

17

CCTV INSTALLATION

361

"THICK-WALL GALVANIZED CONDUIT PIPE, WITH A DIAMETER OF 21mm, INDICATED BY PLAFOND AND/OMUROCONTRA AND MONITOR WHEN FINDING SOME TYPE OF REGISTRATION. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION , AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

ML

66.10

$93.19

$6,159.86

362

"9-INCH LADDER-TYPE PIPE CLAMPS. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERING, CARRIAGE, LABOR , TOOL, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

21.00

$600.77

$12,616.17

363

"PVCANTIFLAMA FRONT PANEL, WITH A MODULE, JACKRJ-45 CATEGORY 6A FOR A CLOSED CIRCUIT TELEVISION SECURITY SERVICE (CCTV), IN A SINGLE STANDARD/OR REGISTRATION BOX OF 10X10X3. 8cm AND 12X12X5.5cm. SYSTIMAX BRAND. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUALS MANUFACTURER."

PACK.

21.00

$278.29

$5,844.09

364

4 PAIR "UTP" CATEGORY 6A CABLE, THE WIRING SYSTEM MUST COMPLY WITH ANSI/TIA/EIA568B STANDARD FOR WIRING MANAGEMENT AND BE CERTIFIED, AS A MATERIAL, BY THE MAKER. THE WIRING MUST BE CARRIED OUT BY THE SI/TIA/EIA568-B1, B2 AND B3 STANDARD FOR STRUCTURED WIRING. THAT MEETS THE CHARACTERISTICS OF CATEGORY 6A, UTP (UNSHIELDEDTWISTEDPAIR), CATEGORY 6 FOR DATA, AS A MINIMUM, CERTIFIED FOR DATA TRANSMISSION (10,100,1000MBPS). A 100 OHMS COPPER CABLE MUST BE USED AS THE TRANSMISSION MEANS,

ML

1149.80

$37.78

$43,439.44

365

PATCH LACES. 6A (jumpers) OF COPPER RJ-45 - RJ-45, TESTED AND VERIFIED BY ETL, UL, CSA, OR A LABORATORY RECOGNIZED BY THE REGULATIONS AND STANDARDS OF WIRING. FACTORY ASSEMBLED WITH RJ-45- RJ-45 CONNECTORS AT BOTH ENDS, WITH 8-POSITION, 8-CONTACT PLUGS. 100% TESTED IN THE FACTORY, THE MANUFACTURER'S BRAND AND CATEGORY SHOULD BE LABELED ON THE OUTER COVER, FIELD-MANUFACTURED WILL NOT BE ACCEPTED. CATEGORY 6A TRANSMISSION ENGINES AND TUNED WITH THE CHARACTERISTICS OF STANDARD TESTPLUGS. COMPATIBLE WITH EXISTING CATEGORIES (BACKWARDCOMPATIBILITY). FORCE RELEASE TO INCREASE THE RETENTION OF THE PLUG WITH THE CABLE FULLY INSERTED IN THE PLUG. HIGH PERFORMANCE MULTI-WIRE CONDUCTOR. WITH PROTECTION BOOTS TO FACILITATE THE IDENTIFICATION OF THE SERVICES AND AVOID EXCEEDED RADIUS OF BENDING, THEY MUST BE THE SAME COLOR AT THE ENDS. , FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOL, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS.

PC.

42.00

$311.68

$13,090.56

366

"FIXED CAMERA WITH HOUSING AND DOME FOR CEILING MOUNT AND/OPLAFON FOR INTERIOR (C.F.I.D.), PELCO BRAND, MODEL IME329-1IS, WITH THE FOLLOWING CHARACTERISTICS:

REVISION 3.0 TECHNOLOGIES WITH:

130 dB WIDE DYNAMIC RANGE (WDR)

ADVANCED PERFORMANCE IN LOW LIGHT: 0.05 lux

ANTI-CRAFT TECHNOLOGY

3D NOISE FILTERING

IMPROVED TONE ASSIGNMENT

RESOLUTIONUP TO 3MEGAPIXELS (MPx)

UP TO 60 FRAMES PER SECOND (fps)

LENS WITH AUTOMATIC FOCUS AND VARIABLE FOCAL LENGTH OF 39mm OR 922mm

POWER OVER EETHERNET (PoE), 24 VAC, 12 VDC

INTEGRATED SET OF ANALYSIS

ADAPTIVE LIGHTING GO UP TO 30 METERS (OPTIONAL)

UP TO 128GB OF EDGE STORAGE ON SD CARDS

COMPATIBLE WITH PELCO AND THIRD-PARTY VIDEO SYSTEMS

COMPLIESTHESTANDARDSMASONVIF PROFILE S, PROFILE G AND PROFILE Q.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

Unit

17.00

$21,090.52

$358,538.84

367

"FIXED CAMERA WITH OUTDOOR HOUSING (C.F.C.E), BRAND PELCO, MODEL IXE32, WITH THE FOLLOWING CHARACTERISTICS:

REVISION 3.0 TECHNOLOGIES WITH:

130 dB WIDE DYNAMIC RANGE (WDR)

ADVANCED PERFORMANCE IN LOW LIGHT: 0.05 lux

ANTI-CRAFT TECHNOLOGY

3D NOISE FILTERING

IMPROVED TONE ASSIGNMENT

RESOLUTIONUP TO 3MEGAPIXELS (MPx)

UP TO 60 FRAMES PER SECOND (fps)

CS FRONT MOUNT WITH AUTOMATIC BACKGROUND FOCUS (ABF)

POWER OVER ETHERNET (PoE) IEEE 802.3af, 24 VAC, 12 VDC

INTEGRATED SET OF ANALYSIS

UP TO 128GB OF EDGE STORAGE ON SD CARDS

ELECTRONIC IMAGE STABILIZATION (EIS)

COMPATIBLE WITH PELCO AND THIRD-PARTY VIDEO SYSTEMS

COMPLIANT WITH ONVIF STANDARDS PROFILE S, PROFILE G AND PROFILE Q

VARIABLE FOCAL DISTANCE LENS, 2.2-6 mm, f/1.3, PELCO BRAND, MODEL YV2.7X2.2SR4A.

HOUSING FOR OUTDOOR CAMERA BRAND PELCO, MODEL SERIES EH16.

MARCAPELCO WALL BRACKET, MODEL EM16.

SIMILAR OR EQUIVALENT IN QUALITY AND CHARACTERISTICS. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUAL UALS OF THE MANUFACTURER."

PC.

4.00

$19,799.70

$79,198.80

368

"IP FILE SERVER (MANAGEMENT AND STORAGE) OF THE MARCAPELCO CLOSED CIRCUIT OF TELEVISION SURVEILLANCE (VIDEO), DSSRV2-040DVD-US DIGITAL SENTRY AND WHICH MUST INCLUDE THE NECESSARY IP CAMERAS LICENSES, MODEL: DS-SW-CAM AND 1 LICENSE FOR PC COMPUTER SOFTWARE MODEL: DS-CONTROL-POINT, SIMILAR OR EQUIVALENT IN CHARACTERISTICS AND QUALITY.

THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS."

PC.

1.00

$331,132.51

$331,132.51

369

"32-INCH DIAGONAL LED SCREEN WITH IP NETWORK INTERFACE MONITOR WITH 32-INCH LED SCREEN (0.363X0.363MM PIXELS) WITH 1920X1080 HIGH DEFINITION RESOLUTION, 3D COMBINED DIGITAL FILTER WITH DENTIRLACING FOR HIGH DEFINITION VIDEO, HIGH CONTRAST RATIO, LIGHTWEIGHT DESIGN, BUILT FOR 24/7 ACTIVE APPLICATIONS, VGA INPUT, DVI, SUPER VIDEO, BNC AND HDMI, DE INTERLACE MOTION, FRAME( PIP),VIEWING AREA OF 698X393MM., CONTRAST RATIO OF 3000:1, VIEW SPEED 60HZ, VIEWING ANGLE 178°/178°, RESPONSE TIME 6.5MS, PANEL APPEARANCE RATIO 16:9, VIDEO FORMATS 480P, 575P, 720P, 1080I, 1080P, LIFETIME 50,000 HOURS, COL 16.7 MILLION SCREEN ORES, TWO INTERNAL SPEAKERS OF 6 WATTS, FRONT PANEL CONTROLS, LED STATUS INDICATOR, POWER CONSUMPTION <120 WATTS, POWER SUPPLY 100 TO 240 VAC, 50/60HZ, HORIZONTAL FREQUENCY 31KHZ TO 91KHZ, VERTICAL FREQUENCY 56HZ TO 85HZ, SYNC FORMAT NTSC/PAL, DIMENSION FROM 43.94X74.52X7 .67 CM. WITH A WEIGHT OF 12.5 KG. CERTIFICATIONS CE CLASS B, FCC CLASS EB, UL/CUL, C-TICK, CCC, GOST-RY, EACH SCREEN SHOULD INCLUDE ITS SUPPORT, HARDWARE AND ACCESSORIES FOR ITS PERFECT INSTALLATION ON THE WALL. PELCO BRAND, MODEL PMCL532BL. THE PRICE INCLUDES SUPPLY, ASSEMBLY, CONNECTION AND INSTALLATION, AS WELL AS MATERIALS, WASTE, FREIGHT, MANEUVERS, CARRIAGE, LABOR, TOOLS, EQUIPMENT, CONNECTORS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION IN ACCORDANCE WITH THE MANUFACTURER'S MANUALS ."

PC.

1.00

$6,864.28

$6,864.28

TOTAL INST CCTV

$856,884.55

18

SIGNAGE

OUTSIDE

370

HIGH EXTERIOR SIGN, BASED ON GALVANIZED SHEET. 18 OCTAGONAL WITH 30 CMS SIDES, BACKGROUND WITH RED BAKED PAINT, TEXT AND 1 CM FRAME WITH REFLECTIVE WHITE BAKED PAINT, FASTENED BY A 2"X1/4" DEPTR POST WITH ECONOMIC ANTI-CORROSIVE PRIMER HIGH RESISTANCE TO CORROSION BRANDS HERWIN WILLIAMS AND PAINT ALKYD ENAMEL COP.A.BBRANDSHERWIN WILLIAMS COLOR SW1007, FIXED WITH 2 FORGED STEEL ANCHORS GALVANIZED SHEET CAL. 18, WELDED TO SIGNALING WITH WELDING E-6018 AND 2 1/4" X 1 1/2" SCREWS. FOUNDATION OF 20 CMS OF RADIUS AND 90 CMS OF SINGLE CONCRETE DEPTH F'C=150 KF/CM2 AND TEMPLATE OF 5CMS OF SIMPLE CONCRETE F'C=100 KG/CM2. INCLUDES: SUPPLY AND PLACEMENT OF MATERIALS, TOOLS, EQUIPMENT AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION. INCLUDES: SUPPLY AND PLACEMENT OF MATERIALS, TOOLS, EQUIPMENT.

PC

2.00

$2,800.89

$5,601.78

371

EXTERIOR SPEED RESTRICTION SIGN, BASED ON 18 SQUARE GALVANIZED SHEET WITH 61 CMS SIDES, BACKGROUND WITH REFLECTIVE WHITE BAKED PAINT, TEXT AND 1 CM FRAME WITH BLACKBLACK BAKED PAINT IRCLE WITH BAKED PAINT COLOR RED, FASTENED THROUGH A 2" X 1/4" PTR POST WITH SHERWIN WILLIAMS BRAND HIGH CORROSION-RESISTANT ECONOMY ANTI-CORROSION PRIMER AND P.A.B ALKYDALIC ENAMEL PAINT BRAND SHERWINWILLIAMS COLOR SW1007, FIXED WITH 2 FORGED SHEET STEEL ANCHORS AGALVANIZED CAL. 18, WELDED TO SIGNALING WITH E-6018 WELDING AND 2 SCREWS OF 1/4"X11/2".FOUNDATION OF 20 CMS OF RADIUS AND 90 CMS DEPTH OF PLAIN CONCRETE F'C=150 KF/CM2 AND TEMPLATE OF 5 CMS OF PLAIN CONCRETE F'C=100KG/CM2 . INCLUDES: SUPPLY AND PLACEMENT OF MATERIALS, TOOLS, EQUIPMENT AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION. INCLUDES: SUPPLY AND PLACEMENT OF MATERIALS, TOOLS, EQUIPMENT.

PC

1.00

$3,654.13

$3,654.13

372

EXTERIOR SIGN "CEDAELPASO", BASED ON TRIANGULAR 18 GALVANIZED SHEET WITH SIDES OF 85 CMS, BACKGROUND WITH REFLECTIVE WHITE BAKING PAINT, TEXT WITH BLACK BAKING PAINT AND FRAME OF 6 CMS WITH RED BAKED PAINT, FASTENED BY A 2" X 1/4" PTR POST WITH ECONOMICAL ANTI-CORROSIVE PRIMER HIGH CORROSION RESISTANCE BRAND SHERWIN WILLIAMS AND ALKYLD ENAMEL PAINT PAB BRAND SHERWIN WILLIAMS COLORS W1007, FIXED WITH 2 ANCHORS FORGED STEEL AXLES OF GALVANIZED SHEET 18, WELDED TO SIGNALING WITH WELDING E-6018 AND 2 SCREWS OF 1/4"X11/2" FOUNDATION OF 20 CMS OF RADIUS AND 90 CMS OF DEPTH OF PLAIN CONCRETE F'C=150 KF/CM2 AND TEMPLATE OF 5 CMS OF PLAIN CONCRETE F'C=100KG/CM2. INCLUDES: SUPPLY AND PLACEMENT OF MATERIALS, TOOLS, EQUIPMENT AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION . INCLUDES: SUPPLY AND PLACEMENT OF MATERIALS, TOOLS, EQUIPMENT.

PC

4.00

$3,775.47

$15,101.88

373

OUTSIDE PARKING SIGN, BASE OF 18 SQUARE GALVANIZED SHEET WITH 61 CMS SIDES, BACKGROUND WITH BLUE BAKED PAINT, LETTER E AND 1 CM FRAME WITH REFLECTIVE WHITE BAKED PAINT AND OUTSIDE SIGN DEFLECTION ,BASED GALVANIZED SHEET CAL. 18 RECTANGULAR WITH DIMENSIONS OF 25X61 CMS, BACKGROUND WITH BLUE BAKED PAINT, 1 CM ARROW AND FRAME WITH REFLECTIVE WHITE BAKED PAINT, FASTENED BY A 2"X1/4" POST WITH ANTICORROSIVE PRIMER, ECONOMICAL, HIGH RESISTANCE TO CORROSION, SHERWIN WILL BRAND IAMS AND P.A.B ALKYD ENAMEL PAINT BRAND SHERWIN WILLIAMS COLOR SW1007, FIXED WITH 3 STEEL ANCHORS FORGED FROM LIME GALVANIZED SHEET. 18, WELDED SIGNALING WITH E-6018 WELDING AND 3 1/4" X 1 1/2" SCREWS. FOUNDATION OF 20 CMS OF RADIUS AND 90 CMS OF DEPTH OF PLAIN CONCRETE F'C=150 KF/CM2 AND TEMPLATE OF 5CMS OF SIMPLE CONCRETE F'C=100 KG/CM2. INCLUDES: SUPPLY AND PLACEMENT OF MATERIALS, TOOLS, EQUIPMENT AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION. INCLUDES: SUPPLY AND PLACEMENT OF MATERIALS, TOOLS, EQUIPMENT.

PC

1.00

$3,654.13

$3,654.13

374

TRAFFIC PAINT FOR DISABLED PEOPLE BASED ON ALKYD RESINS, ROADDEPOT BRAND, BRIGHT WHITE COLOR AND SEEDED WITH REFRACTIVE GLASS MICROSpheres1.5 BRAND BALLOTINI. INCLUDES: SUPPLY AND PLACEMENT OF MATERIAL IALS, TOOL, EQUIPMENT.

M2

4.10

$121.91

$499.83

375

TRAFFIC PAINT FOR DISABLED PEOPLE BASED ON ALKYD RESINS, ROADDEPOT BRAND, BLUE COLOR AND SEEDED WITH REFRACTION GLASS MICROSPHERES 1.5 MARCABALLOTINI. INCLUDES: SUPPLY AND PLACEMENT OF MATERIALS, TOOLS, EQUIPMENT.

M2

29.16

$121.91

$3,554.90

376

PROVISION AND PLACEMENT OF "CENTER OF JUSTICE FOR WOMEN" TEXT, 3D LIME STAINLESS STEEL LETTERS. 18, WITH A HEIGHT OF 40 CM AND 8 CM THICKNESS, FIXED BY MEANS OF 5/16" GALVANIZED THREADED ROD ANCHORS, INCLUDES: SUPPLY OF MATERIALS, ANCHORS, TOOLS, LABOR AND EQUIPMENT.

PC

1.00

$20,002.35

$20,002.35

377

SUPPLY AND PLACEMENT OF STAINLESS STEEL PLATE WITH RELIEF CONTEXT, (SEE SPECIFICATION IN DETAILED DRAWING), MEASURES OF 2.40X1.20M, ANCHORED TO THE WALL, INCLUDES: SUPPLY OF MATERIALS, TOOLS, LABOR AND EQUIPMENT .

PC

1.00

$12,107.76

$12,107.76

TOTAL OUTSIDE

$64,176.76

INDOORS

378

INTERIOR SIGNAGE OF 20X20 CMS OF "TROVICEL" FOAMED PVC PLATE, 6MM THICK, WHITE WITH LOWER AND UPPER BENDING OF 3 CMSA180° FOR ANCHORAGE, WITH TEXT LABELS WITH MONTSERRAT TYPOGRAPHY AND "CONAVIM" LOGO IN CUT-OUT SELF-ADHESIVE VINYL PANTONE 424 C, LOWER CUT-OUT LEVEL SELF-ADHESIVE VINYL PANTONE 258CY SPACE FOR WRITING IN BRAILLE CUT-OUT SELF-ADHESIVE VINYL PANTONE 7439C.TWO SIGNAL ANCHORS FORGED WITH LAMINA AVANIZED CAL.18, FINISHED WITH ANTICORROSIVE PRIMER AND WHITE ENAMEL PAINT WITH TWO 5/16" HOLES EACH ONE, FIXED WITH FOUR 5/16 PLASTIC CAPS "X1 9/16" AND FOUR 5/16" X 1 9/16" GALVANIZED FLAT HEAD SCREWS.

PC

51.00

$492.82

$25,133.82

379

INTERIOR SIGNAGE OF 20X30 CMS OF "TROVICEL" FOAMED PVC PLATE, 6MM THICK, WHITE WITH LOWER AND UPPER BENDING OF 3 CMSA180° FOR ANCHORAGE, WITH TEXT LABELS WITH MONTSERRAT TYPOGRAPHY AND "CONAVIM" LOGO IN CUT-OUT SELF-ADHESIVE VINYL PANTONE 424 C, LOWER CUT-OUT LEVEL SELF-ADHESIVE VINYL PANTONE 258CY SPACE FOR WRITING IN BRAILLE CUT-OUT SELF-ADHESIVE VINYL PANTONE 7439C.TWO SIGNAL ANCHORS FORGED WITH LAMINA AVANIZED CAL.18, FINISHED WITH ANTICORROSIVE PRIMER AND WHITE ENAMEL PAINT WITH TWO 5/16" HOLES EACH ONE, FIXED WITH FOUR 5/16 PLASTIC CAPS "X1 9/16" AND FOUR 5/16" X 1 9/16" GALVANIZED FLAT HEAD SCREWS.

PC

56.00

$492.82

$27,597.92

380

INTERIOR SIGNAGE OF 20X20 CMS OF "TROVICEL" FOAMED PVC PLATE, 6MM THICK, WHITE WITH A UPPER BEND OF 3 CMS AT 90° FOR ANCHORING, WITH TEXT LABELING WITH MONTSERRAT TYPOGRAPHY AND "LOGO" CONAVIM"SELF-ADHESIVE CUT-OUT VINYL PANTONE 424C, LOWER CUT-OUT VINYL SELF-ADHESIVE PANTONE 258 C PLATE AND SPACE FOR WRITING IN BRAILLE SELF-ADHESIVE CUT-OUT VINYL PANTONE 7439 C. TWO 1/4" GALVANIZED THREADED RODS, TWO EXPANSION PLUGES 1/4" X 1 3/4" AND FOUR NUTS WITH LOCK WASHER 1/4" OD.

PC

1.00

$492.82

$492.82

TOTAL INTERIORS

$53,224.56

CIVIL PROTECTION

381

CIVIL PROTECTION SIGN OF 20 X 30 CMS OF "TROVICEL" FOAMED PVC PLATE, 6MM THICK, WHITE WITH LOWER AND UPPER FOLD OF 3CM AT 180° FOR ANCHORAGE, TEXT SIGNS WITH MONTSERRATE ICON TYPOGRAPHY PANTONE-SPECIFIC SELF-ADHESIVE VINYL CUTOUT GRAPHICS IN ARQ2 DETAILED DRAWING -PC-08. TWO SIGNAL ANCHORS FORGED WITH .18 GALVANIZED SHEET, FINISHED WITH ANTICORROSIVE PRIMER AND WHITE ENAMEL PAINT WITH TWO 5/16" HOLES EACH ONE, FIXED WITH FOUR 5/16"X1 9/16" PLASTIC SCREWS AND FOUR GALVAN FLAT HEAD SCREWS 5/16 LIFTS " X 1 9/16".

PC

22.00

$544.46

$11,978.12

382

CIVIL PROTECTION SIGN OF 20 X 20 CMS OF "TROVICEL" FOAMED PVC PLATE, 6MM THICK, WHITE WITH LOWER AND UPPER FOLD OF 3CM AT 180° FOR ANCHORAGE, TEXT SIGNS WITH MONTSERRATE ICON TYPOGRAPHY PANTONE-SPECIFIC SELF-ADHESIVE VINYL CUTOUT GRAPHICS IN ARQ2 DETAILED DRAWING -PC-08. TWO SIGNAL ANCHORS FORGED WITH .18 GALVANIZED SHEET, FINISHED WITH ANTICORROSIVE PRIMER AND WHITE ENAMEL PAINT WITH TWO 5/16" HOLES EACH ONE, FIXED WITH FOUR 5/16"X1 9/16" PLASTIC SCREWS AND FOUR GALVAN FLAT HEAD SCREWS 5/16 LIFTS " X 1 9/16".

PC

34.00

$544.46

$18,511.64

TOTAL CIVIL PROTECTION

$30,489.76

TOTAL SIGNAGE

$147,891.08

19

EXTERIOR WORK

383

SUPPLY AND PLACEMENT OF NATURAL GRASS, INCLUDES: MAINTENANCE, FERTILIZING AND IRRIGATION FOR 15 DAYS, IRONING, EXTENDED, CLEANING OF THE INTERVENTION AREA, EQUIPMENT AND TOOLS

M2

1041.45

$110.46

$115,038.57

384

SUPPLY AND PLACEMENT OF BLACK VEGETABLE SOIL IN LAYERS 10 CMS THICK; INCLUDES: SUPPLY AND CARRIAGE OF MATERIALS TO THE PLACE OF USE, REFERENCES FOR LAYER THICKNESS, SPREADING, RAKING AND CLEANING OF THE INTERVENTION AREA, EQUIPMENT, TOOLS

M2

1041.45

$96.86

$100,874.85

385

SUPPLY AND PLACEMENT OF HYDRAULIC CONCRETE RESISTANCE F'C=250KG/CM2 STRIPED FINISH.THICKNESS 10CM, 6X6/10-10 ELECTROWELDED MESH INCLUDES: SUPPLY OF MATERIALS, FREIGHT, LINE, PREPARATION OF THE SURFACE, LABOR INVOLVED, TOOLS, EQUIPMENT, DAILY THICK CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE BY SHOT

M2

947.08

$709.95

$672,379.45

386

SUPPLY AND PLACEMENT OF ADO-TYPE BLACK ADOCRETONE HOLE 27.5 X 27.5 THICKNESS 8 cm APPARENT FINISH IN PARKING AREA. INCLUDES: SUPPLY OF MATERIALS, FREIGHT, LAYOUT, SURFACE PREPARATION, LABOR THAT INTERVENE, TOOL, EQUIPMENT, DAILY THICK CLEANING OF THE WORK PLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE BY SHOT

M2

245.82

$542.22

$133,288.52

387

PRODUCTION OF CONCRETE BENCH MADE ON SITE OF F'C=200 KG/CM2. MAXIMUM AGGREGATE OF 3/4", 10 CM THICK, INCLUDES: FINISHING, LEVELING, NECESSARY FILLING, COMPACTION OF THE DISPLACEMENT GROUND, SUPPLY OF MATERIALS AND CARRIAGE TO THE PLACE OF WORK, WASTE, METAL SHORING AT BORDERS, CASTING, VIBRATED, CURED, DISCOVERING, TOOLING lie , EQUIPMENT AND TOOL

M2

445.34

$430.59

$191,758.95

388

SUPPLY AND PLACEMENT OF A 0.90 CM HEIGHT SMITH RAIL IN WALKERS, A BASE OF PROFILTDE 2", INCLUDES: LINE, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOL.

ML

39.67

$819.58

$32,512.74

389

20X15X40CM CONCRETE COVERING OF F'C=200 KG/CM2 T.M.A. 1 1/2" INCLUDES: FORMING WITH METAL CONCIMBRA, SHOVING AND SPREADING OF THE CONCRETE, VIBRATED, APPARENT FINISH, JOINTS WITH TURNER, CURING AND FORMING. INCLUDES THE SUPPLY OF CONCRETE.

M

144.51

$230.94

$33,373.14

390

PARKING DRAWER DIVISION WITH YELLOW TRAFFIC PAINT (SOLVENT-BASED) ADDED WITH MICRO GLASS SPHERES. TOTAL ROAD MARKING (BOTH PAINT AND MICROSPHERES) OR SIMILAR QUALITY. PAINTING FOR TRAFFIC AREA, INCLUDES: LAYOUT, SURFACE PREPARATION, SUPPLY OF MATERIALS, LABOR, EQUIPMENT, TOOL, TWO COATS OF PAINT, WASTE, DAILY COARSE CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORK, AT FREE SHOT,

M

606.39

$69.55

$42,174.42

391

ZEBRATED AREA FOR TEMPORARY PARKING, LINES WIDTH 0.40 cm, WITH YELLOW-COLORED TRAFFIC PAINT (SOLVENT-BASED) ADDED WITH GLASS MICRO-BEADS. TOTAL ROAD MARKING (BOTH PAINT AND MICRO-BEADS) OR SIMILAR QUALITY. INCLUDES: LAYOUT, SURFACE PREPARATION, SUPPLY OF MATERIALS, LABOR, EQUIPMENT, TOOL, TWO COATS OF PAINT, WASTE, DAILY COARSE CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE WORKS TO FREE DRAFT,

M2

24.80

$121.91

$3,023.37

392

SUPPLY AND PLACEMENT OF STOPS IN THE PARKING BOX AREA, INCLUDES: MATERIALS, INSTALLATION, LABOR, EQUIPMENT AND TOOLS.

PC

80.00

$562.46

$44,996.80

TOTAL EXTERIOR WORK

$1,369,420.81

TOTAL FEDERAL SUBSIDY

Sixteen million four hundred fifty-nine thousand three hundred eight pesos 20/100 M.N.

SUBTOTAL WITHOUT VAT=

$14,174,883.90

VAT 16%=

$2,267,981.43

SUBTOTAL A=

$16,442,865.33

1 THOUSAND (ASF /OFS)=

$16,442,865

TOTAL A=

$16,459,308.20

B

STATE CONTRIBUTION

1

STEEL

1

BASE PLATE PB-1 AND PB-4, 5/8" (16 MM) A-36 STEEL, 35X75CM WITH 10 HOLES OF 1 1/8" TO RECEIVE 1" (25 MM) WELDED RODS, DROWNED IN THE CONCRETE, (SEE DRAWING ING1-E-15), INCLUDES: LINE, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOLS.

PC

7.00

$1,968.85

$13,781.95

2

BASE PLATE PB-2, STEEL-36DE5/8"(16MM), 25X82CM WITH 4 HOLES OF 1" TO RECEIVE 1"(25MM) WELDED RODS, AND 4 3/4" HOLES TO RECEIVE 3/4" (19MM) WELDED RODS, DRILLED IN THE CONCRETE, (SEE PLAN ING1-E-15), INCLUDES: LAYOUT, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$1,638.11

$1,638.11

3

BASE PLATE PB-3, CIRCULAR STEEL, 50CM DE DIAMETER, 5/8" (16 MM) WITH 8 1 1/8" HOLES TO RECEIVE RODS WELDED 1" (25 MM), DROWNED IN THE CONCRETE, (SEE DRAWING ING1-E-15), INCLUDES: LAYOUT, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$1,300.36

$1,300.36

4

ENABLED AND PLACEMENT OF A-36 STEEL BEAM, (HEAVY STRUCTURE), SEE TM-1 BEAM, IR PROFILE (53.30X65.50 KG/ M), FIRST FINISH., INCLUDES: CLEANING WITH METAL CONDITIONER, MATERIAL, EQUIPMENT AND LABOR.

KG

5512.70

$63.54

$350,276.96

5

ENABLED AND PLACEMENT OF A-36 STEEL BEAM, (HEAVY STRUCTURE), SEE VM-1 BEAM, PROFILE (35.60X38.80KG/M), PRIMERFINISH, INCLUDES :CLEANING WITH METAL CONDITIONER, MATERIAL, EQUIPMENT AND LABOR.

KG

2782.35

$63.47

$176,595.75

6

CONNECTION PLATE CX-A, VARIABLE SIZE, 36A-36 STEEL, 3/8"(9.5 MM), WITH 6 1/2" HOLES, TO RECEIVE 1/2" SCREWS (A-325), MEASUREMENTS ACCORDING TO THE PLANE (VERPLANOING1-E-16), INCLUDES: LAYOUT, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOLS.

PC

10.00

$2,730.06

$27,300.60

7

CONNECTION PLATE CX-B, VARIABLE SIZE, 36A-36 STEEL, 3/8"(9.5 MM), WITH 3 1/2" HOLES, TO RECEIVE 1/2" SCREWS (A-325), MEASUREMENTS ACCORDING TO THE PLANE (VERPLANOING1-E-16), INCLUDES: LAYOUT, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOLS.

PC

4.00

$731.20

$2,924.80

8

CONNECTION PLATE CX-C, VARIABLE SIZE, VARIABLE SIZE, A-36 STEEL, 3/8" (9.5 MM), WITH 3 HOLES OF 1/2", TO RECEIVE 1/2" SCREWS (A-325), MEASUREMENTS ACCORDING TO PLANE(VERPLANOING1-E-16), INCLUDES: LINE, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOLS .

PC

5.00

$696.78

$3,483.90

9

CONNECTION PLATE CX-D, VARIABLE SIZE, 36A-36 STEEL, 3/8"(9.5 MM), WITH 7 1/2" HOLES, TO RECEIVE 1/2" SCREWS (A-325), MEASUREMENTS ACCORDING TO THE PLANE (VERPLANOING1-E-16), INCLUDES: LAYOUT, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$1,063.04

$1,063.04

10

LOSACERO STEEL/DECK, SHEET SECTION 4, CAL.20, HEIGHT 12.4 CM, REINFORCED WITH 6X6/8-8 ELECTROWELDED MESH, WITH STRUCTURAL PREMIXED CONCRETE OF F 'C=250 KG/CM2, PUMPED, INCLUDES: WELDED CONNECTORS, MATERIALS, CARRIAGE, CUTS, WASTE, LABOR, EQUIPMENT AND TOOLS

M2

194.02

$918.52

$178,211.25

11

CONNECTION PLATE CX-1, A-36 STEEL, MEASUREMENTS ACCORDING TO THE PROJECT OF 1/2" (12.7 MM), MEASUREMENTS ACCORDING TO DRAWING ( SEE PLAN ING1-E-16), INCLUDES: LAYOUT, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOLS.

PC

2.00

$1,121.89

$2,243.78

12

CX-2 CONNECTION PLATE, A-36 STEEL, MEASUREMENTS ACCORDING TO THE PROJECT OF 1/2" (12.7 MM), MEASUREMENTS ACCORDING TO FLAT (SEE PLAN ING1-E-16), INCLUDES: LAYOUT, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$1,121.89

$1,121.89

13

CX-3 CONNECTION PLATE, A-36 STEEL, MEASUREMENTS ACCORDING TO THE PROJECT OF 1/2" (12.7 MM), MEASUREMENTS ACCORDING TO DRAWING ( SEE PLAN ING1-E-16), INCLUDES: LAYOUT, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$1,164.59

$1,164.59

14

CX-4 CONNECTION PLATE, A-36 STEEL, MEASUREMENTS ACCORDING TO THE PROJECT OF 1/2" (12.7 MM), MEASUREMENTS ACCORDING TO DRAWING ( SEE PLAN ING1-E-16), INCLUDES: LAYOUT, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOLS.

PC

1.00

$1,121.89

$1,121.89

15

CX-5 CONNECTION PLATE, A-36 STEEL, MEASUREMENTS ACCORDING TO THE PROJECT OF 3/8" (9.5 MM), MEASUREMENTS ACCORDING TO THE DRAWING ( SEE PLAN ING1-E-16), INCLUDES: LAYOUT, MATERIALS, CUTS, WELDING, FIXING, LABOR, EQUIPMENT AND TOOLS.

PC

4.00

$2,065.66

$8,262.64

16

SEISMIC CONSTRUCTION JOINT ON FLOOR, BASED ON FLOOR COVER PROFILE WITH 10.2CM(4") SEISMIC PLATE, MODELS SR-400, CONSTRUCTION SPECIALTIES BRAND. INCLUDES: LINE , MATERIALS, CUTS, FIXING, LABOR, EQUIPMENT AND TOOLS.

ML

7.93

$12,577.84

$99,742.27

TOTAL LOSACERO

$870,233.78

2

PERIMETER FENCE

17

SIMPLE CONCRETE TEMPLATE MADE IN WORK WITH A MIXER, WITHOUT REINFORCEMENT OF 5 CMS. DE ESPESORF´C = 100 KG/CM2 INCLUDES: EMPTYING, FINE, MATERIAL CARRIAGE, LABOR, TOOL AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.

M2

112.45

$188.29

$21,173.21

18

CORRIDADA FOOTING FOR PERIMETER FENCE OF 0.7 X 0.175 M. AVERAGE SOLVE, OF PRE-MIXED CONCRETE OF'C=250KG/CM2, REINFORCED WITH 4VARS.LONGITUDINAL#4 AND CROSS-SECTION#4 @ 0. ,TEMPLATE,COMMON FINISHING, CASTING, VIBRATED, DISCOVERING, FILLING, CLEANING, LABOR, EQUIPMENT AND TOOLS.

ML

125.64

$1,933.80

$242,962.63

19

SOLID BLOCK WALL OF 12 x 20 x 40 cm, ESTABLISHED WITH CEMENT-SAND MORTAR PROPORTION 1:4, DE 15MM, INCLUDES: SUPPLY OF MATERIALS, LAYOUT, PLACEMENT , LEVELING, PLUMBING, FLUSHING, KNITTING, CUTS, ADJUSTMENTS, HORIZONTAL AND VERTICAL CARRYING AT ANY LEVEL, LABOR INVOLVED, TOOLS, SCAFFOLDING, EQUIPMENT, DAILY COARSE CLEANING OF THE WORKPLACE AND REMOVAL OF THE VOLUME GENERATED OUTSIDE THE SITE AT FREE SHOT.

M2

401.24

$408.56

$163,930.61

20

REINFORCED CONCRETE CASTLE WITH 4 RODS OF 3/8" DIAMETER AND STIRRUGS OF 1/4" DIAMETER@15CM., DISSECTION 15X 20 CM., AND A F'C =200KG/CM2, MAXIMUM AGGREGATE OF 3/4", COMMON FINISH AT ANY HEIGHT, INCLUDES: ANCHORING, ENABLED AND STEEL REINFORCED, SHORING AND SHORING, MATERIAL, LABOR AND TOOL.

ML

141.80

$344.10

$48,793.38

21

CONSTRUCTION OF ENCLOSURE CHAIN ​​15 X 20 CM., ASSEMBLED WITH 4 RODS OF 3/8" DIAMETER AND BRACKETS OF 1/4" DIAMETER @ 20 CM., WITH CONCRETE DEF´ C=200KG/CM2 INCLUDES: MATERIALS, LABOR, SHORING AND SHORING AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.

ML

87.43

$429.00

$37,507.47

22

FLATTENED IN WALLSAREGLAY LEAD WITH CEMENT-SAND MORTAR PROP. 1:4 AVERAGE THICKNESS OF 1.5CM., FINISHED WITH SPONGE, INCLUDES: PLASTERING, NOZZLES, FINISHES, CARRIAGE, MATERIAL SCAFFOLDING, LABOR, TOOLS AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.

M2

802.48

$253.61

$203,516.95

23

supply YAPPLICATION OFPINTURAVINALAVABLE COMEX BRAND OR SIMILAR CHARACTERISTICS, TEACHINGS, ENMUROS, COLUMNS, COLUMNS, COLORS, COLOR WORKING.

M2

802.48

$93.67

$75,168.30

TOTAL PERIMETER FENCE

$793,052.55

SUBTOTAL B WITHOUT VAT=

$1,663,286.33

State contribution: One million nine hundred and twenty nine thousand four hundred and twelve 14/ 100 MN

VAT 16.00%=

$266,125.81

TOTAL B=

$1,929,412.14

TOTAL A + B =

$18,388,720.34

b) Physical-financial progress schedule of the project:

Physical and financial progress schedule for the Creation of the "Justice Center for Women of the State of Tlaxcala"

PHYSICAL AND FINANCIAL PROGRESS SCHEDULE

Code

Amount

Days

TRAINER

Month 1

Month 2

Month 3

Month 4

Full

A

A

BID

N/A

NA

NA

x

1

Preliminary work

$482,043.78

15.00

FINANCIAL

$482,043.78

$482,043.78

PHYSICAL

3.04%

3.04%

2

Foundations

$436,045.72

25.00

FINANCIAL

$327,034.29

$109,011.43

$436,045.72

PHYSICAL

2.06%

0.69%

3.00%

3

Structure

$759,008.49

25.00

FINANCIAL

$379,504.25

$379,504.24

$759,008.49

PHYSICAL

2.40%

2.39%

4.79%

4

Retaining walls

$978,529.83

25.00

FINANCIAL

$489,264.91

$489,264.92

$978,529.83

PHYSICAL

3.08%

3.10%

6.18%

5

Masonry, blacksmithing and windows, carpentry, doors and finishes

$3,806,682.67

35.00

FINANCIAL

$3,045,346.14

$761,336.53

$3,806,682.67

PHYSICAL

19.23%

4.81%

24.04%

6

Electrical installation

$2,757,329.21

10.00

FINANCIAL

$2,757,329.21

$2,757,329.21

PHYSICAL

17.41%

17.41%

7

Hydraulic installation

$347,859.84

14.00

FINANCIAL

$173,929.92

$173,929.92

$347,859.84

PHYSICAL

1.10%

1.10%

2.20%

8

Plumbing facility

$40,522.92

10.00

FINANCIAL

$40,522.92

$40,522.92

PHYSICAL

0.26%

0.26%

9

Fire protection

$18,712.72

6.00

FINANCIAL

$18,712.72

$18,712.72

PHYSICAL

0.12%

0.12%

10

Air conditioning

$37,382.48

10.00

FINANCIAL

$37,382.48

$37,382.48

PHYSICAL

0.24%

0.24%

11

Inst. telephony and computing

$1,006,284.05

15.00

FINANCIAL

$1,006,284.05

$1,006,284.05

PHYSICAL

6.35%

6.35%

12

Inst. LP gas

$77,799.18

9.00

FINANCIAL

$77,799.18

$77,799.18

PHYSICAL

0.49%

0.49%

13

Inst. fire detection

$427,049.95

12.00

FINANCIAL

$427,049.95

$427,049.95

PHYSICAL

2.70%

2.70%

14

Inst. access control

$139,685.23

7.00

FINANCIAL

$139,685.23

$139,685.23

PHYSICAL

0.88%

0.88%

15

Inst. Sound

$378,023.39

12.00

FINANCIAL

$378,023.39

$378,023.39

PHYSICAL

2.39%

2.39%

16

Inst. television

$107,728.00

12.00

FINANCIAL

$107,728.00

$107,728.00

PHYSICAL

0.68%

0.68%

17

Inst. CCTV

$856,884.55

10.00

FINANCIAL

$856,884.55

$856,884.55

PHYSICAL

5.41%

5.41%

18

Signage

$147,891.08

6.00

FINANCIAL

$147,891.08

$147,891.08

PHYSICAL

0.93%

0.93%

20

Total exterior work

$1,369,420.81

15.00

FINANCIAL

$342,355.20

$1,027,065.61

$1,369,420.81

PHYSICAL

2.16%

6.48%

8.64%

Subtotal A without VAT=

$14,174,883.91

VAT 16%=

$2,267,981.42

Subtotal A=

$16,442,865.33

1to Thousand=

$16,442.87

Federal subsidy contribution: Sixteen million four hundred fifty-nine thousand three hundred eight pesos 20/100 M.N.

Total A=

$16,459,308.20

B

STATE CONTRIBUTION

1

LOSTEEL

$870,233.78

10.00

FINANCIAL

$870,233.78

$870,233.78

PHYSICAL

5.49%

5.49%

2

PERIMETER FENCE

$793,052.55

10.00

FINANCIAL

$793,052.55

$793,052.55

PHYSICAL

5.01%

5.01%

Subtotal B without VAT=

$1,663,286.33

VAT 16%=

$266,125.81

Total state contribution: One million nine hundred twenty-nine thousand four hundred twelve 14/100 M.N.

Total B=

$1,929,412.14

Amount=

$809,078.07

$4,023,126.73

$6,005,367.39

$5,000,598.04

$15,838,170.23

5.11%

25.40%

37.92%

31.57%

100.00%

Total A+B=

$18,388,720.34

Federal Subsidy: (Sixteen million four hundred fifty-nine thousand three hundred eight pesos20/100 M.N.)

Readed by the parties and aware of the content and legal scope of the Technical Annex, they sign it in four copies in Mexico City, on the 12th day of May 2021.- By the Secretariat: the Undersecretary of Human Rights, Population and Migration, Alejandro de Jesús Encinas Rodríguez.- Signature.- The National Commissioner to Prevent and Eradicate Violence against Women , Ma Fabiola Alanís Sámano.- Signature.- By the State Government: the Governor of the State of Tlaxcala, Marco Antonio Mena Rodríguez.- Signature.- The Secretary of Government, José Aarón Pérez Carro.- Signature.- The Secretary of Planning and Finance, María Alejandra Marisela Nande Islas.- Signature.- The Attorney General of Justice of State of Tlaxcala , José Antonio Aquiahuatl Sánchez.- Signature.

Related Articles

The Peruvian - Supreme Decree that approves the Regulation of Law No. 15251, modified by Law No. 30699, Law that modifies Article 1 of Law No. 15251, law created by the Dental College of Peru and various articles of theLaw No. 29016 - Decree S
The Peruvian - Supreme Decree that approves the Regulation of Law No. 15251, modified by Law No. 30699, Law that modifies Article 1 of Law No. 15251, law created by the Dental College of Peru and various articles of theLaw No. 29016 - Decree S
AVM FRITZ!Box 4060: Tri-band WIFi 6 router and 2.5G port review
AVM FRITZ!Box 4060: Tri-band WIFi 6 router and 2.5G port review
Where to place and how to correctly configure a WiFi repeater
Where to place and how to correctly configure a WiFi repeater
Maduro's "judicial revolution" - El Carabobeño
Maduro's "judicial revolution" - El Carabobeño